Odisha Tourism Development Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Tourism Development Corporation Limited - OTDC Tender

Civil And Construction
Water Storage And Supply
Eprocure
Opening Date6 Jul 2023
Closing Date19 Jul 2023
Tender Amount₹ 22,44,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and Installation of AB switch mounting channel 75 x 40 x 4.8mm, 7.14Kg /Mtr, each channel length 3 Mtr 2 nos channel required = 7.14 x 3 x 2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

3979

92.9

... More
Supply and Installation of AB switch side support channel 100 x 50 x 6mm, 9.56 KG /Mtr each channel length 0.35mtr 2 nos channel required = (9.56 x 2 x 0.35) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6.69

621

92.9

... More
Supply and Installation of Channel support for down pipe 75 x 40 x 4.8mm 7.14 KG /Mtr each channel length 0.8mtr 1 nos channel required = (7.14 x 0.8 x 1) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

5.71

530

92.9

... More
Supply and Installation of Double pole Belting Channel 75 x 40 x 4.8mm 7.14 KG /Mtr each channel length 3.0 mtr 4 nos channel required = (7.14 x 3 x 4) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

85.66

7957

92.9

... More
Supply and Installation of 50 x 50 x 6mm GI Bracing Angle 4.5Kg /Mtr each angle length 3.512mtr 4 nos angle required = (4.5 x 3.512 x 4) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

63.22

5873

92.9

... More
Supply and Installation of Danger plate including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

252

126.42

... More
Supply and Installation of Back clamp for danger plate 25 x 3 mm flat 0.59Kg/Mtr flat of 0.510mtr length 2 nos = (2 x 0.59 x 0.510) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

0.6

68

113.7

... More
Supply and Installation of H.T Stay stay clamp 50 x 8mm flat 3.14Kg /Mtr 0.551 Mtr length 2 nos qty required (1 Pair) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

378

189.45

... More
Supply and Installation of H.T Stay Set including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

3183

1591.5

... More
Supply and Installation of H.T sty insulator Type-C including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

158

79

... More
Supply and Installation of 7/10 SWG stay wire 15Kg /stay including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

30

3555

118.5

... More
Supply and Installation of GI pipes Earthing 40mm 3Mtr long including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

3183

1591.5

... More
Supply and Installation of 50 x 6mm GI flat for earthing 2.36 kg /mtr, 12.5mtr for L.A 3 Mtr for AB switch body 2.5mtr for mesh formation and 2.5 mtr for raising ) = 20.5 x 2.36 including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

48.38

5733

118.5

... More
Supply and Installation of GI barbed wire anticlimbing device 3KG per support 2 nos qty required = (2 x 3Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

758

126.4

... More
Supply and Installation of Back clamp for anticlimbing device 25 x 3 mm flat 0.59 Kg /Mtr flat of 0.510mtr length 8 nos = (8x0.59x0.510) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2.41

285

118.5

... More
Supply and Installation of Lightning Arrester(12KV 10KV) (Station class,Class-2)including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

16829

5609.75

... More
Supply and Installation of AB Switch (11 KV ,200A, 3Pole , 50HZ) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

11140

11140.5

... More
Supply and Installation of 11 KV pin insulator polymer including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

1896

316

... More
Supply and Installation of HW fitting (B&S) 70KN, 3 Bolt including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

3318

553

... More
Supply and Installation of Disc insulator (B&S) 70KN polymer including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

10903

1817.25

... More
Supply and Installation of PG clamp for 100sqmm AAA conductor including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

5499

916.5

... More
Supply and Installation of GI nut bolt & washer of different sizes (13.718KG each DP with AB Switch) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

13.72

1690

123.25

... More
Providing of Black paint including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

347

347.65

... More
Providing of Yellow colour paint for Background including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

695

347.65

... More
Supply and Installation of 100 mm2 AAAC including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

0.02

1738

86911.85

... More
Providing & Fixing of complete 11KV line complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay insulator 4) Stay wire 5) Stay clamps with nuts & Bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mm x 500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard

2250

4500

2

... More
Providing 0f Concreting ratio 1:1:5:3 (500mm x 500mm x 1800mm) = 0.45Cu Mtr including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6500

5850

0.9

... More
Providing Couping ratio 1:1:5:3 with dimension (500 x 500 x 450 ) = 0.1125 Cu Mtr including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6500

1495

0.23

... More
Construction Earthing chamber inclsuing installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide powder, caiculation of earth resistance, including installation of 3mtr GI Pipe 40mm / 50mm including welding of GI flat around pipe including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3700

7400

2

... More
Laying of 3C x 95sqmm XLPE UG Cable

-

-

-

... More
Supply Portion

-

-

-

... More
Supply of 11KV, 3core, 95sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA-9kA and SC rating of Armour in kA-9kA) including cost of all materals, transportation, loading & unloading etc complete as per direction of Engineer in Charge.

100

81390

813.9

... More
Supply of outdoor termination kits heat shrinkable type suitable for 11KV, 3 core, 95 sqmm, HT UG cable for 3 core (set) including cost of all materals, transportation, loading & unloading etc complete as per direction of Engineer in Charge.

4

62427

15606.9

... More
Supply of HDPE PE 80-PN8 Pipe of 110mm diameter (For 95sqmm HT Cable Laying) including cost of all materals, transportation, loading & unloading etc complete as per direction of Engineer in Charge.

68

27948

411

... More
Erection Portion

-

-

-

... More
Laying, Commissioning & Testing of 11KV ,3core, 95sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

100

9450

94.5

... More
Erection of outdoor termination kits heat shrinkable type suitable for 11KV 3core 95swmm aluminium UG cable kits for 3 core (Set) including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

4

7603

1900.8

... More
Laying of 110mm dia PE 80-PN8, HDPE Pipe inside open trench including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

68

20400

300

... More
Civil Portion

-

-

-

... More
Providing of Earth work excavation of soil including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

23.8

16660

700

... More
Providing of Earth work excavation of hard rock including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

10.2

17544

1720

... More
Providing of Back filling with excavated soil outside and above the trench including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

34

6868

202

... More
Supply and erection of GI Pipe of dia. 150mm class-B (8Mtr) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

32

46828

1463.4

... More
Supply and erection of cable Route Marker along the cable route at an interval of 30mtrs with civil works including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

2024

1012

... More
Installation of DP With AB Switch Using 11Mtr WPB Pole

-

-

-

... More
Supply and Installation of WPB 160 x 152 (11Mtr long 30.44KG /Mtr) etc complete including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

64826

32413.06

... More
Supply and Installation of Top channel 100 x 50 x 6mm 9.56 KG/Mtr each channel length 3 mtr 2 nos channel required = (2 x 9.56 x 3 ) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

57.36

5328

92.9

... More
Supply and Installation of Fish plate 50 x 6mm 2.36 kg /Mtr each 0.280mtr length 6 nos required = (6 x 2.36 x 0.280) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3.96

450

113.68

... More
Supply and Installation of AB Switch mounting channel 75 x 40 x 4.8mm 7.14KG/Mtr each channel length 3 mtr 2 nos channel required = (7.14 x 3 x 2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

3979

92.9

... More
Supply and Installation of HT MU mounting channel 75 x 40 x 4.8mm 7.14KG /Mtr each channel length 3 mtr 2 nos channel required = (7.14 x 3 x 2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

3979

92.9

... More
Supply and Installation of Cantilever GI chhanel for supporting for HT MU 75 x 40 x 1.8mm (810mm long 2 nos) 7.14 K.g per mtr (each 2 x 0.81 7.14) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

11.57

1074

92.9

... More
Supply and Installation of Angle for cantilever arrangement for HT MU 50 x 50 x 6-1282 mm each 2 nos (4.5 K.g per mtrr) each 2.1 282 4.5) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

11.54

1072

92.9

... More
Supply and Installation of AB Switch side support channel 100 x 50 x 6mm 9.56 KG /Mtr each channel length 0.35 mtr 2 nos channel required = (9.56 x 2 x 0.35) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6.69

621

92.9

... More
Supply and Installation of Channel support for down pipe 75 x 40 x 4.8mm 7.14Kg /Mtr each channel length 0.8Mtr 1 nos channel required = (7.14 x 0.8 x 1) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

5.71

530

92.9

... More
Supply and Installation of Double pole belting channel 75 x 40 x 4.8mm 7.14Kg /Mtr each channel length 3 Mtr 2 nos channel required = (7.14 x 3 x 2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

3979

92.9

... More
Supply and Installation of 50 x 50 x 6 mm GI Bracing Angle 4.5Kg /Mtr each angle length 3.512mtr mtr 2 nos angle required = (4.5 x 3.512x 2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

31.61

2936

92.9

... More
Supply and Installation of Danger plate including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

242

121.26

... More
Supply and Installation of Back clamp for danger plate 25 x 3 mm flat 0.59Kg/Mtr. Flat of 0.510mtr length 2 nos = (2 x 0.59x0.510) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

0.6

68

113.68

... More
Supply and Installation of 55mm2 all alloy aluminum conductor (AAAC) -PVC insukated for jumpering including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

0.02

1055

70396.06

... More
Supply and Installation of H.T Stay clamp 50 x 8 mm flat 3.14Kg/Mtr 0.551mtr length 2 nos qty required (1pair) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

395

197.53

... More
Supply and Installation of H.T Stay set including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

3318

1659.23

... More
Supply and Installation of H.T Stay Insulator Type- C including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

151

75.79

... More
Supply and Installation of 7/10 SWG stay wire 15Kg / Stay including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

30

3555

118.52

... More
Supply and Installation of GI Pipe Earthing 40mm 3 Mtr Long including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

3318

1659.23

... More
Supply and Installation of 50 x 6mm GI flat for earthing 2.36Kg/Mtr (12.5Mtr for L.A, 3 Mtr for AB Switch body, 2.5mtr for mesh formation and 2.5mtr for raising) = 20.5 x 2.36 including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

48.38

5734

118.52

... More
Supply and Installation of GI barbed wire anticlimbing device 3 Kg per support 2 nos qty required = (2 x3Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

758

126.42

... More
Supply and Installation of Back clamp for anticlimbing device 25 x 3mm flat, 0.59Kg/Mtr flat of 0.510mtr length 8 nos= (8 x 0.59 x 0.510) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2.41

273

113.68

... More
Supply and Installation of Lighting Arrester (11KV, 10KA) (Station Class, Class-2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

16829

5609.77

... More
Supply and Installation of AB Switch (11KV, 200A, 3Pole, 50Hz) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

11140

11140.52

... More
Supply and Installation of 11KV pin insulator polymer including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

948

316.04

... More
Supply and Installation of PG clamp for 55sqmm AAA conductor including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

2275

758.5

... More
Supply and Installation of GI Nut Bolt & Washer of different sizes (13.718Kg each DP with AB Switch) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

13.72

1691

123.26

... More
Supply and Installation of Providing of Black Paint including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

347

347.65

... More
Supply and Installation of Providing of Yellow colour paint for Background including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

695

347.65

... More
Supply and Installation of Fixing of complete 11KV line complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay insulator 4) Stay wire 5) Stay clamps with nuts & Bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mm x 500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard

2

4500

2250

... More
Providing of Concreting ratio 1:1:5:3 (500mm x 500mm x 1800mm) = 0.45Cu Mtr including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

0.9

5850

6500

... More
Providing of Couping ratio 1:1:5:3 with dimension (500 x 500 x 450 ) = 0.1125 Cu Mtr including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

0.23

1495

6500

... More
Construction of Earthing chamber inclsuing installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide powder, caiculation of earth resistance, including installation of 3mtr GI Pipe 40mm / 50mm including welding of GI flat around pipe including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

7400

3700

... More
Supply and Erection of GI Fencing with Gate including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

20

72000

3600

... More
Instalaltion of 250KVA Sub station

-

-

-

... More
Supply and Installation of WPB (GI) Pole 160x 152 (11Mtr long, 30.44Kg/Mtr) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

64826

32413.06

... More
Supply and Installation of 9Mtr long 300kg PSC pole (for raising of LT ABC) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

4970

4970.03

... More
Supply and Installation of Pole clamp for EYE hook for XLPE aerial bunched cable including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

662

331.34

... More
Supply and Installation of Eye hook for XLPE aerial bounched cable including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

198

99.4

... More
Supply and Installation of Dead end clamp suitable for messeenger XLPE Aerial bunched cable including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

215

107.68

... More
Supply and Installation of Top channel GI 100 x 50 x 6 mm (3000 mm long) (9.56Kg/Mtr, 2nos) Each 2 x 3.000 x 9.56 = 57.36 Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

57.36

5555

96.85

... More
Supply and Installation of Fish plate 50 x 6 mm 2.36 Kg /Mtr each 0.280mtr lenggth 6 nos required = (6 x 2.36 x 00.280) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3.96

492

124.25

... More
Supply and Installation of Double pole Belting channel 75 x 40 x 4.8mm ,7.14Kg/Mtr each channel length 3.0 mtr 2 nos channel required = (7.14 x 3 x 2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

4149

96.85

... More
Supply and Installation of 50 x 50 x 6mm GI Bracing Angle 4.5Kg /mtr each angle length 3.5 12 mtr 2 nos angle required = (4.5 x 3.512 x 2) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

31.61

3061

96.85

... More
Supply and Installation of M.U Channel GI 75 x 40 x 4.8mm (3000 mm long) (7.14Kg /Mtr 2 Nos ) Each 2x 3.00 x 7.14 = 42.84 Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

4149

96.85

... More
Supply and Installation of AB Switch mounting channel 75 x 40 x 4.8mm GI channel (3000 mm long) (7.14Kg/Mtr.2 Nos)Each 2 x 3 000 x 7.14 = 42.84 Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

4149

96.85

... More
Supply and Installation of AB Switch side support Channel 100 x 50 x 6mm 9.56 Kg /Mtr each channel length 0.35 mtr 2 Nos channel required = 9.56 x 2 x 0.35) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6.69

647

96.85

... More
Supply and Installation of Channel support for down pipe 75 x 40 x 4.8mm, 7.14KG/Mtr each channel length 0.8mtr 1 nos channel required = (7.14 x 0.8 x 1) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

5.71

553

96.85

... More
Supply and Installation of HG /Do fuse Mounting channel 75 x 40 x 4.8 mm GI channel (3000 mm long)(7.14Kg/Mtr 2 nos each 2x 3.000 x 7.14 = 39.98 Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

42.84

4149

96.85

... More
Supply and Installation of Cantilever support channel 75 x 40 x 4.8 mm GI channel (810mm long 2 nos )(7.14Kg/Mtr 2 nos (Each 2 x 0.810 x 7.14= 11.57Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

11.57

1120

96.85

... More
Supply and Installation of Cantilever support Angel 50 x 50 x 6mm GI (1282 mm long) (4.5Kg/Mtr 2 nos (Each 2 x 1.282 x 4.5=11.54Kg) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

11.54

1117

96.85

... More
Supply and Installation of 50 6mm GI flat for earthing 2.36Kg/Mtr (2.5 x 7 mtr for mesh formation, 12mtr. For LA and 2.5mtr for raising, 11 Mtr for AB switch 2.8mtr for HG Fuse, 5 x 2 Mtr for DTR nutral (1.3+4.5) mtr for DTR Body, 0.500mtr for LTDB & AB Switch operating handle 3 mtr for fencing each 65.6 x 2.36= 154.81Kg including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

154.82

19236

124.25

... More
Supply,Installation, Testing & Commissioning of 250KVA 11/0.4KV (Cu) Transformer with Tap changer BIS Energy level-II including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

700664

700664.68

... More
Supply and Installation of LT Distribution Box with MCCB Aluminium Busbar for 3 Bay with Kit Kat fuse for 250 KVA S/S including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

79520

79520.53

... More
Supply and Installation of 55mm2 All Alloy Aluminum Conductor (AAAC) -PVC Insulated (50Mtr Each Dtr) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

50

3520

70.4

... More
Supply and Installation of 1C x 400 mm2 LT XLPE Cable(Un- Armoured) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

120

55000

458.34

... More
Supply and Installation of AB Switch (11KV 200A,3Pole 50Hz) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

12176

12176.58

... More
Supply and Installation of H.G Fuse (11KV 200A 3Pole) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

1

10138

10138.87

... More
Supply and Installation of PG Clamp for 55 sqmm AAA conductor including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

4771

795.21

... More
Supply and Installation of Disc insulator (B&S) 70KN Polymer including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

5715

1905.18

... More
Supply and Installation of H W Fitting (B&S) 70KN (3 bolted) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

1739

579.84

... More
Supply and Installation of Lightting Arrester (12KV,10KA) Station Class 2 including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

17643

5881.21

... More
Supply and Installation of 11KV pin insulator polymer including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

3

994

331.34

... More
Supply and Installation of HT stay set complete including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

3479

1739.51

... More
Supply and Installation of HT Stay Clamp (1.9Kg/Pair) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

412

206.45

... More
Supply and Installation of HT Stay insulator TYPE-C including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

165

82.83

... More
Supply and Installation of 7/10 SWG GI stay wire, Grade-2 (15Kg/Set) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

30

3727

124.25

... More
Supply and Installation of 40mm Nominal bore GI Pipe (Medium grage) earthing device with 3 mtr long including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

7

12176

1739.51

... More
Supply and Installation of GI nuts & bolts of Assorted size (25Kg/DSS DP) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

25

3230

129.22

... More
Supply and Installation of GI Barbed wire / Anticlimbing device (3Kg/Pole) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

6

795

132.53

... More
Supply and Installation of Back Clamp for anticlimbing device 25 x 3 mm flat 0.59Kg/Mtr Flat of 0.510mtr length 8 nos = (8 x 0.59x 0.510) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2.41

299

124.25

... More
Supply and Installation of Danger plate 11KV including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

2

265

132.53

... More
Supply and Installation of Back Clamp for danger Plate 25 x 3 mm flat 0.59Kg/Mtr Flat of 0.510mtr length 2 nos = (2 x 0.59x 0.510) including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

0.6

74

124.25

... More
Supply and Installation of Name Plate including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

1

132

132.53

... More
Supply of Yellow Colour Paint for Background including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

2

550

275.26

... More
Supply of Black Colour Paint for numbering including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

1

364

364.47

... More
Providing Concreting ratio 1:1:5:3 (500mm x 500mm x 1800mm) = 0.450Cu. Mtr including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

0.9

5850

6500

... More
Providing Couping ratio 1:1:5:3 (500mm x 500mm x 450mm) = 0.113 Cu.Mtr including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

0.23

1495

6500

... More
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 Size (900mm x 600mm x 900mm) using 40mm BHG metal with all labor and material except stay set stay wire stay insulator including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

2

4500

2250

... More
Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation,soil treatment with bentonide powder, calculation of earth resistance, including installation of 3mtr GI Pipe 40mm/50mm including welding of GI Flat around Pipe.

7

25900

3700

... More
Providing LTDB Plinth including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

1

3000

3000

... More
Providing DTR Plinth including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

1

25000

25000

... More
Supply & Laying of 1 C x 400 mm2 LT XLPE Cable including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

120

8640

72

... More
Supply and Erection of GI Fencing with Gate including cost of all materals, labour, transportation, errection loading, unloading & T & P etc complete as per direction of Engineer in Charge.

20

72000

3600

... More
Providing Concreting ratio 1:1:5:3 (500mm x 500mm x 1500mm) = 0.375Cu. Mtr including cost of all materals, labour & T & P etc complete as per direction of Engineer in Charge.

0.38

2437

6500

... More
Supply, Testing & commissioning of 2 meter Electrode chemical earthing with 58 mm G.I galvanized electrode and 25 x 3mm G.I inner strip with 50x 6mm copper connecting terminal with 2 bag of BFC (50Kg) of chemical earthing size of chemical earth bar 2 mtr size of earth feet 3’ x 2’’ x 9’ chemical compound to be used 50K.g. including all cost of materials, labour, transportation, loading, unloading, T & P etc. complete as directed by the Engineer-in-charge.

3

60270

20090

... More
Supplying, storing, laying, testing and commissioning of 3.5c x 185 Sq. mm A2XFY Al armoured Cable 1100 Volts including excavation, sand cushing, protective covering and refilling the trench etc. as required. as per the direction of Engineer-in-Charge.

120

283878

2365.65

... More
Supplying and laying 10 Sq mm copper conductor ISI marked at 0.5 meter below grond level as strip earth electrode including soldering etc. as required as per the direction of Engineer-in-Charge.

14.25

2529

177.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.