Odisha State Pollution Control Board Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha State Pollution Control Board Tender

Aerospace and Defence
Eprocure
Opening Date3 Sep 2022
Closing Date12 Sep 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
To quote for Monkey deck & Master Deck fibring (FRP) work 3mm thick. To quote Including cost of materials

90

-

-

... More
Mast base to be removed from monkey island & and same base to be fitted in same place with required ST steel nut & bolts.

1

-

-

... More
Ultrasonic gauging of hull plate from authorized workshop.

200

-

-

... More
Fitting of antiskid floor tiles in all bathroom floor (4'x5' - 3 Nos., 5'x6' - 1 No.).To quote including cost of Materials.

1

-

-

... More
Wheel house doors are to be repaired and Door lock (Godrej/Haffle or Branded) to be renewed and Rubber bidding of doors are to be renewed. (To quote including cost of materials).

4

-

-

... More
Supply of plastic chair with cushion (Nilkamal) (To quote including cost of materials).

4

-

-

... More
Wheel house, all cabin floor, accommodation floor mat to be renewed with new sheet (Present thickness - 1.5 mm). To quote including cost of materials

50

-

-

... More
Sanitary and freshwater lines leading from engine room & overhead tank to accommodation bath room, Galley, freshwater filling pipes and other places to be checked thoroughly, defective pipe & fitting are to be repaired renewed as required, To quote including cost of materials

1

-

-

... More
Engine Room Ventilation Blower body to be repaired and rubber beading are to be changed and painted with 02 coats of primer and 02 coats of finish coat.(Including cost of materials)

2

-

-

... More
New Engine Room Ventilation Blower body to be fitted with necessary modification on existing blower base. rubber beading are to be changed and painted with 02 coats of primer and 02 coats of finish coat.(Including cost of materials)

2

-

-

... More
Steel Renewal: Steel Plating’s along with frames, beams, brackets and all the required fittings shall be renewed at following locations as per the normal practice of ship construction / IRS Construction Rules: Firm shall Quote above steel renewal including cost of Steel Plates per Ton Basis. M.S. Plates are to be of approved type for Ship Construction (No. IS 2062) and welding rods are to be used of IRS approved. (a) Hull Platings (Under Water & Above Water) (b) Main Deck/hull Platings (c) Under Deck Bulk Heads (d) Sea Chest Platings (e) Skeg, Bilge Keel and Rudder (f) Fender Holding Plates (g) Any other steel structure as required by PPT (h) Engine room floor plates securing angles, stair case, man hole covers. Firm to Quote above steel renewal including cost of Steel Plates per Ton Basis. M.S. Plates of 8 MM / 6 MM / 4 MM Thickness will be used for renewal of plating’s.

3

-

-

... More
To quote for supply of Zinc Anodes fitted with MS welding arm (5.5 Kg. each) approx. with quality test certificate. Make: Sargam and the old anodes are to be replaced with new anode.

20

-

-

... More
Renewal of battery stand box (To quote including the cost of materials). (02 NOS X 180AH)

2

-

-

... More
Supply and fitment of wheel house & scientist room sun screen (48"x34" - 10Pcs. 60"x34" - 2 Pcs. 24"x34" - 2 Pcs.) (To quote including the cost of materials).

1

-

-

... More
To Crop and renewal 04nos of Single Bollards of 100 mm Dia of (SCH-80 Pipe) main deck. To quote including the cost of materials.

4

-

-

... More
Lifebuoy stand, 02 nos, life raft stand 01 no (To quote including the cost of materials).

1

-

-

... More
To quote for removal of old pipe fender and Supply & fitting of new pipe 100NB. SizeSch-80 Pipe :( To quote including cost of materials).

30

-

-

... More
Fire pump (Make-Kirloskar, Model-AK65) to be complete overhauled with necessary spares and renewal of Gland packing, bearing. (To quote including cost of materials.)

1

-

-

... More
Fire hose box (480x260x460) mm to be renewed (To quote including cost of materials).

1

-

-

... More
Renewal of GI railing and staircase railing pipe size 11/4 inch. ISI Marked Heavy gauge pipe. Including cost of materials.

20

-

-

... More
ENGINE SIDE WORK Following pipe lines in engine room, deck, are to be removed, renewed with schedule 40 seamless pipes with old Flanges. All the pipe line are to be welded along with flanges from both sides. The pipelines are to be painted and fitted back with new joints, Stainless steel nuts & bolts and supporting U- clamp wherever required. To quote Including cost of materials.,

-

-

-

... More
15 NB

25

-

-

... More
25 NB

30

-

-

... More
40 NB

40

-

-

... More
50 NB

30

-

-

... More
65 NB

10

-

-

... More
To remove, dismantle, and Overhaul the following Overboard, Sea chest & intermediate valves of sea water pipeline:-After overhauling all the valves shall be pressure tested at 5 Kg/ sq.cm and fit back with new gasket, St. Steel nuts, bolts’ joints, supporting clamps. To quote Including cost of materials.

-

-

-

... More
I80 NB Gate Valve

4

-

-

... More
50 NB Glove valve

10

-

-

... More
40 NB Glove valve

10

-

-

... More
25 NB Glove valve

4

-

-

... More
Air Vent pipes on deck to be repaired / renewed. To quote Including cost of materials. Size : 40NB X 1500mm height

16

-

-

... More
Main engine seawater pumps and Bilge Pumps to be overhauled with required spares. To quote Including cost of materials. Capacity 3HP, Total 6 Nos. Pumps (2 ME S/W, 2 DA S/W & 2 Bilge)

6

-

-

... More
D.O Tanks (2000 ltrs. Capacity) to be cleaned with removal of manhole cover and renewal of 4mm gaskets To quote including the cost of materials.

2

-

-

... More
Rudder Unit: Rudder and Rudder shaft to be removed and calibrated. If required shaft to be re built up and machined to required clearance. Gland packing and bearing to be renewed. Rudder and Rudder shaft to be fitted back. Make (SKF/FAG/NSK) To quote Including cost of materials.

2

-

-

... More
Steering system (Make-Hydrive, Model-105): Steering indicator and feedback potentiometer to be renewed. All hoses( Approx. 7 nos , length about 02 metrs, ½ inch size ) are to renewed with ISI marked hoses ( Parker, / Gates ), Wiring and necessary repairs with required parts to be carried out to make the steering system operational. To quote Including cost of materials.

1

-

-

... More
Gearbox (Make-Ghatge Patil Industries, Model-HG7-Hydraulic) oil cooler are to be cleaned, cover repair or renewed & new o ring gasket to be fitted .To quote including cost of materials.

4

-

-

... More
To remove, clean and paint the sea chest along with gratings and fit back with new SS bolts and nuts, (locked with ss wire)

4

-

-

... More
Anchor along with the chain to be lowered, cleaned, grit blasted and painted with 2 coats of epoxy primer & 2 coats of finish paints (black) joining shackles & D shackles to be opened freed, marked and painted bitter end connecting to be checked and if necessary strengthened. To quote including cost of materials .(Paint supply OSPCB)

2

-

-

... More
To renew the rubber portion of Cutlass bush of Propeller shaft by Vulcanization as per sample including cost of material.

4

-

-

... More
The propeller shafts along with propeller are taken out from its place. Propeller cleaned and removed from the shaft for inspection of key way and lock nuts for survey. After inspection, the propeller to be fitted back and locked. To fit the rope guard and cemented properly. Shaft trueness to be checked. If required shaft are to be straightened and shown to IRS Surveyor. New glands are fitted back with propeller varnishing. To quote including cost of materials.

2

-

-

... More
ELECTRICAL WORK

-

-

-

... More
To supply and install 30 watt led light with enclosure fitting in engine room ,steering room with necessary modification (Make -Havells,Bajaj,Philips)

4

-

-

... More
To supply and fit new rudder angle indicator with feedback unit for wheel house as per sample 24 volt DC) To quote including cost of materials. (1no spare)

2

-

-

... More
Main engine -PORT& STBD safety system to be checked and repaired with renewal of water temperature sensor, Lube Oil Pressure & Temperature sensors, RPM sensor etc, fuel cut-off solenoid to be renewed, and other relays, switches, circuit as required. To quote including cost of materials. Engine make: Greaves TD2V6 model.

2

-

-

... More
Navigational Mast all supporting hooks, 04 nos stay wire hooks to renewed with St S.S. and all navigational light to be renewed. Including cost of materials

4

-

-

... More
To supply and fit water tight Led bulkhead light fittings with (9wt/10 watt type) (Make Havells, Bajaj, Philips, CG)

6

-

-

... More
To quote for removal, overhauling, revarnishing of blower motor 02hp and fit back with new gasket, SS nut and bolts.

2

-

-

... More
PAINT WORK

-

-

-

... More
To quote for Painting of underwater portion of the hull with 6coats of Epoxy Paint by airless spray (2Coats primmer+2coats sealer+2 coats Anti fouling/Finish)(Paint OSPCB Supply)

220

-

-

... More
To quote for supply & painting of following Paints from OEM or its Authorized Dealers of Akzonobel Paints (International Brand) or Jotun or Sigma marine or Hempel.(Paint manufacturer Certificate , type approval certificate should be provided in the name of Vessel-MV Sagar Utkal).

-

-

-

... More
Epoxy Primer Intergard 269 or its equivalent Jotun /Sigma marine/Hempel.

140

-

-

... More
Epoxy Sealer Intergard 263 or its equivalent Jotun / Sigma marine/Hempel.

80

-

-

... More
Top coat- 740-(Deck Green) or Equivalent paint from Jotun or Sigma marine/Hempel for Eng. room and Deck.

80

-

-

... More
Enamel White paint

80

-

-

... More
Enamel Black paint

20

-

-

... More
Epoxy Thinner GTA 220 or its equivalent Jotun / Sigma marine/Hempel.

80

-

-

... More
Top coat- 740-(Navey blue) or Equivalent paint from Jotun or Sigma marine/Hempel for Eng. room and Deck.

60

-

-

... More
Epoxy Anti Fouling Inter speed 6200 or its equivalent Jotun / Sigma marine/Hempel.

40

-

-

... More
Anti Fouling Thinner GTA 007 or its equivalent Jotun / Sigma marine/Hempel.

20

-

-

... More
General Thinner

40

-

-

... More
To quote for docking, Undocking & placing in slipway of the vessel on the blocks on the cradle of the slipway.

1

-

-

... More
Top overhauling cum De-carbonizing for both the marine engine set through OEM including the cost of spares. (As per IRS recommendation) Engine Specification - Make-Greaves Cotton Ltd., Manufacturing Year-2015, Model - TD2V6, 6 cylinders and 120mm dia meter (Each Engine), 2 x 96 KW @1800RPM, Engine run time till date - STBD M/E - 584 Hrs., Port M/E - 537 Hrs.

1

-

-

... More
Top overhauling of DG set through OEM including the cost of spares. (As per IRS recommendation). Engine Specification - Make-Greaves Cotton Ltd., Manufacturing Year-2015, Model - 3G11T, DG Set running time till date - 2536 Hrs.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.