Odisha State Pollution Control Board Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Odisha State Pollution Control Board Tender
Civil And Construction
Eprocure
Opening Date27 May 2022
Closing Date21 Jun 2022
Tender AmountRefer Documents
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Execution Dry Docking Repair Work Of Mv Sagar Utkal
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SPCB_78032_1Bid Award Id
ViewTender No
SPCB/ICZM/506/2019-2020/9309Tender Authority
Odisha State Pollution Control Board ViewPurchaser Address
-Website
http://https://odocmms.nic.in/OCMMS/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
E TENDER CALL NOTICE FOR DRY DOCKING REPAIR WORK OF MV SAGAR UTKAL AT DST BERTH PARADEEP PORT
BOQ Items
... More
To quote for Monkey deck & Master Deck fibring (FRP) work 3mm thick. To quote Including cost of materials
90
-
-
... More
To remove from mast base from monkey island & and same base to be fitted in same place with required steel nut & bolts
1
-
-
... More
Ultrasonic gauging of 200nos of points from authorized workshop
200
-
-
... More
All Bathroom floor Tiles fitting including .To quote including cost of Materials.
4
-
-
... More
Wheel house door to be repaired with Door lock to be renewed and Supply of chair rubber bedding change as per size (To quote including cost of materials).
4
-
-
... More
Wheel house, all cabin floor accommodation floor mat to be renewed with new sheet. To quote including cost of materials
50
-
-
... More
Sanitary /freshwater lines sanitary and freshwater lines leading from engine room /overhead tank to accommodation bath room,Galley,freshwater filling pipes and other places to be checked throughly,if found defective same to be repaired renewed as required,Lum sum rate to be quoted
4
-
-
... More
Engine Room Ventilation Blower body to be repair and rubber beading change to be painted with 02 coats of primer and 02 coats of finish coat with blower modification .(Including cost of materials)
4
-
-
... More
Steel Renewal :Steel Platings along with frames, beams, brackets and all the required fittings shall be renewed at following locations as per the normal practice of ship construction / IRS Construction Rules: Firm to Quote above steel renewal including cost of Steel Plates per Ton Basis. M.S. Plates of 8 MM, 6 MM & 4 MM Thickness will be used for renewal of platings. The M.S. Plates are to be of approved type for Ship Construction (No.IS 2062) and welding rods are to be used of IRS approved.
3
-
-
... More
To quote for supply of Zinc Anodes fitted with MS welding arm (5.5 Kg. each) approx. with quality test certificate. Make: Sargam and the old anodes are to be replaced with new anode.
20
-
-
... More
Renewal of battery stand box (To quote including the cost of materials).
2
-
-
... More
Supply and fitment of wheel house sun screen (To quote including the cost of materials).
1
-
-
... More
To Crop and renewal 04nos of Bollards of 100 mm Dia on main deck. To quote including the cost of materials.
4
-
-
... More
Lifebuoy stand, life raft stand (To quote including the cost of materials).
2
-
-
... More
To quote for removal of old pipe fender and Supply & fitting SCH-80 Pipe size: 100NB. (To quote including cost of materials).
30
-
-
... More
Fire pump overhauling, fire hose box repair and renewed (To quote including cost of materials).
1
-
-
... More
Renewal of GI railing and staircase railing 11/4 inch. Heavy gauge pipe. Including cost of materials.
20
-
-
... More
ENGINE SIDE WORK
-
-
-
... More
Following pipe lines in engine room, deck, are to be removed, renewed with schedule 40 seamless pipes with old Flanges. All the pipe line are to be welded along with flanges from both sides. The pipelines are to be painted and fitted back with new joints, Stainless steel nuts & bolts and supporting U- clamp wherever required. To quote Including cost of materials. i)) 15mm bore -25 mtrs,ii) 25mm bore-30mtrs,ii) 40 mm bore-40mtrs,iii) 50 mm bore-30mtrs,iv) ) 65 mm bore-10Mtrs
1
-
-
... More
To remove, dismantle, and Overhaul the following Overboard, Sea chest & intermediate valves of sea water pipeline:-After overhauling all the valves shall be pressure tested at 5 Kg/ sq.cm and fit back with new gasket, St. Steel nuts, bolts’ joints, supporting clamps. To quote Including cost of materials I) 80 Gate Valve-4 Nos, ii) 50 NB Glove valve-10 Nos,iii) 40 NB Glove valve-10 Nos ,iv) 25 NB Glove valve-4 Nos.
1
-
-
... More
Air Vent pipes on deck to be repaired / renewed. To quote Including cost of materials
6
-
-
... More
Main engine seawater pump and Bilge Pump to be overhauled with required spares. To quote Including cost of materials
3
-
-
... More
D.O Tank to be cleaned with removal of manhole cover and renewal of 4mm gaskets To quote including the cost of materials.
2
-
-
... More
Rudder Unit: Rudder shaft to be removed and calibrated. If required shaft to be re built up and machined to required clearance. Gland packing and bearing to be renewed. To quote Including cost of materials.
2
-
-
... More
Steering system: Steering indicator and feedback potentiometer to be renewed. All hoses are to renewed with ISI marked hoses, Wiring and necessary repairs with required parts to be carried out to make the steering system operational. To quote Including cost of materials.
1
-
-
... More
Gearbox oil cooler are to be cleaned & new oring gasket to be fitted .To quote including cost of materials.
4
-
-
... More
To remove, clean and paint the sea chest along with gratings and fit back with new SS bolts and nuts
1
-
-
... More
Anchor along with the chain to be lowered ,cleaned, grit blasted and painted with 2 coats of epoxy primer & 2 coats of finish paints (black) joining shackles & D shackles to be opened freed, marked and painted bitter end connecting to be checked and if necessary strengthened.
2
-
-
... More
To renew the rubber portion of Cutlass bush of Propeller shaft by Vulcanization as per sample including cost of material
4
-
-
... More
The propeller shafts along with propeller are taken out from its place. Propeller cleaned and removed from the shaft for inspection of key and lock nuts for survey. After inspection, the propeller fitted back and locked .To fit the rope guard and cemented properly. Shaft trueness to be checked. If required shaft are straightened and shown to IRS Surveyor. New glands are fitted back with propeller varnishing. To quote including cost of materials.
2
-
-
... More
ELECTRICAL WORK
-
-
-
... More
To supply and install 30 watt led light with enclosure fitting in engine room ,steering room with necessary modification (Make -Havells,Bajaj,Philips)
4
-
-
... More
To supply and fit new rudder angle indicator with feedback unit for wheel house as per sample 24 volt DC) To quote including cost of materials.
2
-
-
... More
Main engine -Port & STBD safety system water temperature sensor, fuel cut of sensor to be renewal .To quote including cost of materials. Engine make: Greaves
2
-
-
... More
Navigational Mast all supporting hooks, stay wire hooks with S.S. and all navigational light to be renewed .Including cost of materials
4
-
-
... More
To supply and fit water tight deck light fittings with (9wt led bulb) ( Make Havells, Bajaj, Philips, CG )
6
-
-
... More
To quote for removal, overhauling, revarnishing of blower motor 02hp and fit back with new gasket, SS nut and bolts.
2
-
-
... More
ELECTRICAL WORK
-
-
-
... More
To quote for Painting of underwater portion of the hull with 6coats of Epoxy Paint by airless spray (2Coats primmer+2coats sealer+2 coats Anti fouling/Finish), ( Make Havells, Bajaj, Philips, CG )
220
-
-
... More
To quote for supply & painting of following Paints from OEM or its Authorized Dealers of Akzonobel Paints (International Brand) or Jotun or Sigma marine or Hempel.(Paint manufacturer Certificate , type approval certificate should be provided in the name of Vessel-MV Sagar Utkal). ( Make Havells, Bajaj, Philips, CG )
1
-
-
... More
Epoxy Primer Intergard 269 or its equivalent Jotun /Sigma marine/Hempel.
140
-
-
... More
Epoxy Sealer Intergard 263 or its equivalent Jotun / Sigma marine/Hempel.
80
-
-
... More
Top coat- 740-(Deck Green) or Equivalent paint from Jotun or Sigma marine/Hempel for Eng. room and Deck.
80
-
-
... More
Enamel White paint
80
-
-
... More
Epoxy Thinner GTA 220 or its equivalent Jotun / Sigma marine/Hempel.
80
-
-
... More
Top coat- 740-(Navey blue) or Equivalent paint from Jotun or Sigma marine/Hempel for Eng. room and Deck.
60
-
-
... More
Epoxy Anti Fouling Inter speed 6200 or its equivalent Jotun / Sigma marine/Hempel.
40
-
-
... More
Anti Fouling Thinner GTA 007 or its equivalent Jotun / Sigma marine/Hempel.
20
-
-
... More
General Thinner
40
-
-
... More
To quote for Dry docking, Undocking & placing of the vessel on the blocks on the cradle of the slipway.
1
-
-
... More
Slipway charges per day (with approximate days required)
1
-
-
... More
Top overhauling cum De-carbonizing for both the marine engine set through OEM including the cost of spares.
p(As per IRS recommendation)
Top overhauling cum De-carbonizing for both the marine engine set through OEM including the cost of spares.
p(As per IRS recommendation)
1
-
-
... More
Top overhauling of DG set through OEM including the cost of spares. (As per IRS recommendation).
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements