Odisha Power Transmission Corporation Limited Tender
... More
The OPTCL has issued a formal invitation for competitive bids for the Odisha Power Transmission Corporation Limited project, for Construction Of Concrete Approach Road Inside Eht (const) Store At Jajpur Road in Jajpur, Odisha. The bid opening date for this tender is 23-04-2021 and the last date for bid submission is 07-05-2021. Interested bidders for Odisha Power Transmission Corporation Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_OPTCL_67959_2Bid Award Id
ViewTender No
OPTCL-CVL-SE-E-01OF 2021-22Tender Authority
Odisha Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://www.optcl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cleaning and grubbing road land including uprooting rank vegetataion ,grass, bushes,shrus,saplings, and trees girth upto 300 mm removal of stups of trees cut earlier and disposal of unserviceable materials to be used or auctioned upto a lead of 1000 mtrs. including removl and disposal of top organic soil not exceeding 150 mm in thickness.
6549.45
-
5.61
... More
Earthwork in excavation in hard soil on foundation trenches in all kinds of soil including moorum stony earth and earth mixed with boulder except sheet rocks and boulders requiring blasting including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and shuttering , dewatering if required etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge.
681.68
-
184.59
... More
Supplying all Labour and material for Spreading crusher dust laying sub base in layers not exceeding 100 mm including watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge.
611.01
-
1008.07
... More
Supplying all labour and T&P for spreading of polythene sheet before concreting over bituminous surface including cost, conveyance and taxes of all materials and cost,conveyance and taxes of all labour and T&P required for the work etc. complete as per the direction of the EIC.
14100
-
0.9
... More
Supplying all labour with T&P for filling foundation and plinth with sand including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge.
232.77
-
431.61
... More
Supplying all labour ,T&P for fitting and fixing of Thermocool sheet in concrete as expansion joint including cost of all amterials and cost, conveyance and taxes of all labour and T&P required for the work etc. complete as per the direction of the EIC.
358.14
-
29.9
... More
Supplying all labour with T&P required for removal of excess earth by mechanical means upto a diastance of 5 km & head upto 50 mtr including cost, conveyance & taxes of all labour with T&P required etc. complete in all respect as per the direction of EIC.
307.59
-
162.51