Odisha Mining Corporation Limited Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Mining Corporation Limited - OMC Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date22 Apr 2025
Closing Soon6 May 2025
Tender Amount₹ 65,83,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling brick or stone masonry in clay above 3m. height including stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In 2nd Floor

30.7

1753

53820.17

... More
Scraping of Bricks dismantled from Brick Work in lime or cement mortar including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres for reuse of same in masonru works including cost of all labours,T & P required for the work etc. Complete as directed by EIC.

15040

1

28576

... More
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In Groung Floor.

1.8

1662

2991.78

... More
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In 1st Floor

0.6

1745

1047.12

... More
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In 2nd Floor

1.6

1832

2932

... More
Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In Groung Floor.

4.8

446

2142.72

... More
Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In all Floor

8.1

492

3986.01

... More
Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In Groung Floor.

61.1

141

8621.21

... More
Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In 1st Floor

64.8

148

9603.36

... More
Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In 2nd Floor

154.3

155

24009.08

... More
Dismantling and removing old and damaged Cement plaster from walls and stacking the useful materials for reuse and removing the debris from work site with all Lead & lift including cost of all labours,T & P required for the work etc. Complete as directed by EIC. In 2nd Floor

182.5

61

11260.25

... More
Anchoring/ Rebaring of 10mm dia reinforcement bars anchoring at both edges in RCC with minimum dia of hole is 12mm dia and applying adhesive for grouting required for rebaring after dust free surface including cost of all labours,T & P required for the work etc. Complete as directed by EIC.

56

100

5600

... More
Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders (except sheet rocks and boulders requiring for blasting) including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC.

169.4

248

42112.84

... More
Filling in foundation and plinth or floor with excavated earth or moorum or extra good earth including laying, watering and ramming in 23 Cm (9") thick layers with all necessary leads and lifts complete inclusive of all cost of labour T&P etc. complete as per direction of EIC.

73.3

165

12145.81

... More
Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC.

39.8

682

27155.54

... More
P.C.C .of prop.(1:3:6) in foundation using 40 mm. size broken hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. compleete as per direction of EIC.

24.9

5690

141690.96

... More
PCC of prop. (1:2:4) in foundation in all floors using 20 size hard crusher broken granite chips of appd. Quality from appd. quarry including centering, shuttering to wall side & lowering, laying, concrete, watering and curing etc. comp. To required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials and cost of all labour, T&P required for the work etc. complete as per direction of EIC

8.7

7279

63332.52

... More
Fly ash brick masonry in C.M.(1:6) using old removal bricks from dismanting works in foundation and plinth and basement, ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC.(Rate excluding cost of Bricks)

31.7

3081

97689.89

... More
Fly ash brick masonry in C.M.(1:6) using old removal bricks from dismanting works in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC..(Ground Floor) (Rate excluding cost of Bricks)

5.9

3120

18408

... More
Fly ash brick masonry in C.M.(1:6) after immersing the bricks having minimum crushing strength of 75 Kg/Cm2 in water for 24 hours having size of 23cmx11cmx8cm in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC..(Ground Floor)

4.5

5621

25294.5

... More
Fly ash brick masonry in C.M.(1:6) after immersing the bricks having minimum crushing strength of 75 Kg/Cm2 in water for 24 hours having size of 23cmx11cmx8cm in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC..(1st Floor)

15.3

5991

91674.54

... More
Fly ash brick masonry in C.M.(1:6) after immersing the bricks having minimum crushing strength of 75 Kg/Cm2 in water for 24 hours having size of 23cmx11cmx8cm in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC.(2ndFloor)

29.4

6418

188695.08

... More
Fly ash brick masonry in C.M.(1:4) after immersing the bricks having minimum crushing strength of 75 Kg/Cm2 in water for 24 hours having size of 23cmx11cmx8cm in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC..(2nd Floor)

5.3

6630

35141.65

... More
R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance, royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in lintel Ground Floor

0.6

13834

8300.64

... More
R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance, royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in lintel 1st Floor

0.3

15798

4739.49

... More
R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance, royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in lintel 2nd Floor

1

18227

18227

... More
R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance, royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in SLAB 1st Floor

5.4

15265

82432.62

... More
R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance, royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in SLAB 2nd Floor

1.4

17570

24598.14

... More
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and above including binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.). Ground Floor

0.6

8917

5350.56

... More
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and above including binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.). . 1st Floor

4.7

8950

42066.88

... More
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and above including binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.). 2nd Floor

2.2

8984

19766.56

... More
12mm (1/2") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. (Ground Floor)

147.5

185

27331.75

... More
12mm (1/2") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. (1st Floor)

85.9

192

16570.11

... More
12mm (1/2") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. (2nd Floor)

290.4

200

58341.36

... More
16mm (5/8") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC.(Ground Floor)

53.2

267

14241.64

... More
16mm (5/8") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC.(1st Floor)

82.2

274

22572.12

... More
16mm (5/8") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC.(2nd Floor)

206.3

281

58114.71

... More
Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) Ground Floor

117.5

80

9400

... More
Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) 1st Floor

52.3

81

4283.37

... More
Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) 2nd Floor

278.2

83

23313.16

... More
Painting one coat with wall primer to interior surface of wall including washing the surface with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Wall Primer should be of ICI/ Berger / Asian make) GF

157.5

37

5859

... More
Painting two coats with plastic emulsion paint of approved brand and shade to interior surface of wall including washing the surface with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Plastic emulsion should be of ICI/ Berger / Asian make) Ground Floor

117.5

102

12079

... More
Weather coat two coats of approved brand to exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used)(Ground floor)

40

96

3840

... More
Painting one coat with wall primer to interior surface of wall including washing the surface with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Wall Primer should be of ICI/ Berger / Asian make) 1st Floor

52.3

37

1982.17

... More
Painting two coats with plastic emulsion paint of approved brand and shade to interior surface of wall including washing the surface with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Plastic emulsion should be of ICI/ Berger / Asian make) 1st Floor

52.3

104

5486.27

... More
Painting one coat with wall primer to interior surface of wall including washing the surface with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Wall Primer should be of ICI/ Berger / Asian make) 2nd Floor

278.2

38

10738.52

... More
Painting two coats with plastic emulsion paint of approved brand and shade to interior surface of wall including washing the surface with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Plastic emulsion should be of ICI/ Berger / Asian make) 2nd Floor

278.2

107

29795.22

... More
Supplying, fitting and fixing of M.S grills, grill gates with top and bottom rails, steel windows, steel doors, steel frames for doors and windows, staircase and parapet railing ( as per I.S. specification and as per approved drawings ) in proper position in all floors and at all height including making holes to brick walls/ R.C.C structure/wood work etc. and making good to the damaged walls/ structures with cement concrete (1:2:4) with black hard crusher broken granite stone chips of 12mm to 20mm size ( 20mm size not to exceeds 25% ) including watering and curing etc. complete in all respect as directed by the Engineer in charge ( W.I. / M.S. windows grills, grill gates, collapsible gates with top and bottom rails, steel windows, steel doors, steel frames for doors and windows, staircase and parapet railings square bar along with required nos. of nails and screws and other required materials of approved quality and approved size shall be supplied by the contractor at his own cost.)

34

14180

482120

... More
Painting one coat with red oxide primer to iron surface including cleaning the surface by sand paper with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Red Oxide Primer should be of ICI/ Berger / Asian make) Ground Floor.

22.6

76

1722.12

... More
Providing and painting two coats with synthetic enamel paint to iron work of approved quality and approved shade confirmming to ISI on steel work to give an even shade in all floors at all height over a coat of primer of approved quality and shade including sand papering and making the surface smooth with cost, coveyance, loading and unloading, of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by Engineer-in-charge. Ground Floor

22.6

171

3866.86

... More
Painting one coat with red oxide primer to iron surface including cleaning the surface by sand paper with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Red Oxide Primer should be of ICI/ Berger / Asian make) 1st Floor.

37.4

78

2950.86

... More
Providing and painting two coats with synthetic enamel paint to iron work of approved quality and approved shade confirmming to ISI on steel work to give an even shade in all floors at all height over a coat of primer of approved quality and shade including sand papering and making the surface smooth with cost, coveyance, loading and unloading, of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by Engineer-in-charge. 1st Floor

37.4

175

6559.96

... More
Painting one coat with red oxide primer to iron surface including cleaning the surface by sand paper with cost of brush, scaffolding, staging charges with cost of all materials, cost of all labour, T&P etc required complete as directed by EIC. (Red Oxide Primer should be of ICI/ Berger / Asian make) 2nd Floor.

35.9

81

2933.03

... More
Providing and painting two coats with synthetic enamel paint to iron work of approved quality and approved shade confirmming to ISI on steel work to give an even shade in all floors at all height over a coat of primer of approved quality and shade including sand papering and making the surface smooth with cost, coveyance, loading and unloading, of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by Engineer-in-charge. 2nd Floor

35.9

179

6454.82

... More
Supplying, fitting, fixing up Alluminium system window (sliding type) made up aluminum Section 9778 as windows frame section No.4095,4096& 9777,3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc.complete as per direction of Engineer-incharge.

191.6

6000

1149600

... More
Providing and fixing in position WPC frames of size 125mmx65mm to doors fixed with MS hold fast of 35x5mm embedded in cement concrete blocks 15x10x10cm of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) complete with all materials, labours, T & P including cost, conveyance, loading, sundries required for the work etc. complete in all respect as directed by the Engineer-in-charge in all floor

6.3

1188

7489.44

... More
Providing and fixing in position WPC frames of size 100mm x 50mm to doors fixed with MS hold fast of 35x5mm embedded in cement concrete blocks 15x10x10cm of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) complete with all materials, labours, T & P including cost, conveyance, loading, sundries required for the work etc. complete in all respect as directed by the Engineer-in-charge in all floor

79.2

831

65815.2

... More
Supplying fitting and fixing in position 32mm thick flush doorshutter with approved quality of 30mm thick BWR block board pasted with 1mm thick sunmica on both side of approved design and quality including cost of all door fittings and fixtures & partly glazed like Godrej/Dorma make Mortice lock having model no 9168, Godrej/Dorma make floor spring, handle, tower bolt, stopper including cost of all materials, labour, all taxes, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. In all floor (Make- Ply & Lamination- Greenply/Archidply/Mayur)

4.5

10668

48008.75

... More
Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid board one side white color and other side of board laminted with PVC foil of minimum 14 micron thickness of approved design pasted with hot melt adhesive for cup boards, work stations and bathroom/kitchen cabinet etc. of required sizes comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel piano hinges/soft close clip on concealed hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In- Charge.

25.6

2807

71869.44

... More
Providing and laying water proofing treatment to vertical and horizontal surfaces of depressed portions of W.C., kitchen and the like consisting of: (i) Ist course of applying cement slurry @ 4.4 kg/sqm mixed with water proofing compound conforming to IS 2645 in recommended proportions including rounding off junction of vertical and horizontal surface. (ii) IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse sand) mixed with water proofing compound in recommended proportion including rounding off junction of vertical and horizontal surface. (iii) IIIrd course of applying blown or residual bitumen applied hot at 1.7 kg.per sqm of area. (iv) IVth course of 400 micron thick PVC sheet. (Overlaps at joints of PVC sheet should be 100 mm wide and pasted to each other with bitumen @ 1.7 kg/sqm).

267

534

142578

... More
Supplying all materials, labour, T&P and fixing Anti skid ceramic floor tile of 300mmx300mm size of approved brand and shade on 25mm thick cement mortar (1:4) (1 cement:4 sand)jointed with neat cement, slurry mixed with pigment to match the shed of tiles complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work..(Tiles should be of Kajari/ Somany / RAK / Johnson) 2nd floor

109.8

925

101641.86

... More
Supplying , fitting and Fixing DC/ Premium Matt vitrified tile flooring using vitrified tiles having thickness of 8mm to 10mm conforming to IS 13756 of 1200mm x 1200mm / 600mm x 600mm of approved quality of Somany / Kajaria or equivalent in all floors at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with epoxy grout with required quantities of pigments of approved marks to match the shades of the vitrified tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work, complete in all respect as per specification and direction of Architect / Engineer-in-charge. G.F

176.5

1183

208958.35

... More
Supplying , fitting and Fixing DC/ Premium Matt vitrified tile flooring using vitrified tiles having thickness of 8mm to 10mm conforming to IS 13756 of 1200mm x 1200mm / 600mm x 600mm of approved quality of Somany / Kajaria or equivalent in all floors at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with epoxy grout with required quantities of pigments of approved marks to match the shades of the vitrified tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work, complete in all respect as per specification and direction of Architect / Engineer-in-charge. 1st Floor

45.5

1197

54468.05

... More
Supplying , fitting and Fixing DC/ Premium Matt vitrified tile flooring using vitrified tiles having thickness of 8mm to 10mm conforming to IS 13756 of 1200mm x 1200mm / 600mm x 600mm of approved quality of Somany / Kajaria or equivalent in all floors at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with epoxy grout with required quantities of pigments of approved marks to match the shades of the vitrified tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work, complete in all respect as per specification and direction of Architect / Engineer-in-charge. 2nd Floor

57.1

1211

69148.1

... More
Providing Granite stone prepolished 20mm thick of area above 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties of all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor

14.2

2813

39953.12

... More
Providing Granite stone prepolished 20mm thick of area above 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties of all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. 1st Floor

79.5

2826

224730.6

... More
Providing Granite stone prepolished 20mm thick of area above 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties of all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. 2nd Floor

31.3

2840

88913.91

... More
Supplying all materials, labour, T&P and fixing ceramic wall tile of 300mmx600mm size of approved brand and shade in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement, slurry mixed with pigment to match the shed of tiles complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work. (Tiles should be of Kajari/ Somany/ RAK / Johnson) 1st Floor

110.4

1107

122228.26

... More
Supplying all materials, labour, T&P and fixing ceramic wall tile of 300mmx600mm size of approved brand and shade in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement, slurry mixed with pigment to match the shed of tiles complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work. (Tiles should be of Kajari/ Somany/ RAK / Johnson) 2nd floor

330.5

1128

372804

... More
Supplying all materials, labour, T&P for fitting & fixing and laying 50mm dia u-PVC pipes and fittings including supply of all jointing materials like gaskets, adhesive, solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Pipes of ORIPLAST/ Astral / Supreme)

70

484

33880

... More
Supplying all materials, labour, T&P for fitting & fixing and laying 25mm dia u-PVC pipes (Sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Pipes of ORIPLAST/ Astral / Supreme)

50

228

11415

... More
Supplying all materials, labour, T&P for fitting & fixing and laying 20mm dia c-PVC pipes (Sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Pipes of ORIPLAST/ Astral / Supreme)

100

233

23370

... More
Supplying all materials, labour, T&P for fitting & fixing and laying 20mm dia u-PVC pipes (Sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Pipes of ORIPLAST/ Astral / Supreme)

150

184

27630

... More
Supplying all materials, labour, T&P and fixing standard sized 15mm dia Long Body cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP long body bibcock with wall flage.Jaquar-CON-107KN

16

1094

17508.8

... More
Supplying all materials, labour, T&P and fixing standard sized Chromium Plated soap case complete with Chromium Plated brass brackets fixed to wooden plugs with Chromium Plated brass screws as per specification and direction of the Engineer in charge.Jaquar-ACN-113IN

16

971

15544

... More
Supplying all materials, labour, T&P and fixing standard sized Chromium Plated brass towel ring of complete with Chromium Plated brass brackets fixed to wooden plugs with Chromium Plated brass screws as per specification and direction of the Engineer in charge. Jaquar-ACN-1121BN

16

1332

21324.8

... More
Supplying all materials, labour, T&P and fixing standard sized Chromium Plated 150 mm dia Maze overhead Shower round shape with 300 mm long 20mm dia shower arm complete with Chromium Plated brass brackets fixed to wooden plugs with Chromium Plated brass screws as per specification and direction of the Engineer in charge.

16

2346

37545.6

... More
Supplying all materials, labour, T&P and fixing standard sized 15mm dia angular Stop cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP angle stop cock with wall flange ESSCO

16

729

11665.6

... More
Supplying all materials, labour, T&P and fixing standard sized porcelean laboratory sink of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Engg-in-charge. 24''x18''x10'' (CERA/NYCER/HINDWARE/PARRYWARE)

40

7766

310664

... More
Supplying all materials, labour, T&P and fixing standard sized SINK cock with wall flange of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge.Jaquar-FLR-5347N

40

2181

87276

... More
Supplying all materials, labour, T&P and fixing standard sized 15mm dia angular Stop cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP angle stop cock with wall flange ESSCO

5

729

3645.5

... More
Supplying all materials, labour, T&P and fitting and fixing U-PVC SWR soil waste ventilating pipes (type-A / ring fit type) with all PVC fittings as per IS 13592 to walls with nails, bobbins and laying in trenches including all pipe fittings, jointing materials, tools plant, labour & all material, earthwork in excavation in all kinds of soil and refilling of trenches as per specification and direction of the engineer in charge.75 mm dia PVC (SWR pipe Type-B)

90

362

32643

... More
Supplying all materials, labour, T&P and fitting and fixing U-PVC SWR soil waste ventilating pipes (type-A / ring fit type) with all PVC fittings as per IS 13592 to walls with nails, bobbins and laying in trenches including all pipe fittings, jointing materials, tools plant, labour & all material, earthwork in excavation in all kinds of soil and refilling of trenches as per specification and direction of the engineer in charge.110 mm dia PVC (SWR pipe Type-B)

162

519

84223.8

... More
Supplying all materials, labour, T&P and fitting and fixing U-PVC SWR soil waste ventilating pipes (type-A / ring fit type) with all PVC fittings as per IS 13592 to walls with nails, bobbins and laying in trenches including all pipe fittings, jointing materials, tools plant, labour & all material, earthwork in excavation in all kinds of soil and refilling of trenches as per specification and direction of the engineer in charge.160 mm dia PVC (SWR pipe Type-B)

40

905

36208

... More
Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia Nahini trap with S.S jally of appd. make including supply of all jointing materials like adhesive, solvent cement etc and fixing to floor with supply of all materials including scaffolding and testing etc as per PH specification and direction of the Engineer in charges.

4

246

985.6

... More
Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia C.P grating of appd. make including supply of all jointing materials like adhesive, solvent cement etc and fixing to walls including scaffolding and testing etc as per PH specification and direction of the Engineer in charges.110mm dia C.P grating

14

92

1289.4

... More
Supplying all materials, labour, T&P and fitting & fixing 25mm dia U.P.V.C ball valve/FW valve with supply of jointing materials complete as per specification and direction of the Engineer in charge.

5

401

2007

... More
Supplying all materials, labour, T&P and fitting & fixing 50 mm dia U.P.V.C ball valve/FW valve with supply of jointing materials complete as per specification and direction of the Engineer in charge.

7

1392

9748.9

... More
Supplying all materials, labour, T&P for fitting and fixing and laying 75mm dia P.V.C S.W.R Tee of appd. make including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding and testing etc as per PH specification and direction of the Engineer in charges

40

153

6120

... More
Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia P.V.C S.W.R Tee of appd. make including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding and testing etc as per PH specification and direction of the Engineer in charges

36

267

9622.8

... More
Supplying all materials, labour, T&P for fitting and fixing and laying 160mm dia P.V.C door bend of appd. make including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding and testing etc as per PH specification and direction of the Engineer in charges

6

457

2746.8

... More
Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia P.V.C door bend of appd. make including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding and testing etc as per PH specification and direction of the Engineer in charges

20

224

4496

... More
Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia P.V.C plain bend of appd. make including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding and testing etc as per PH specification and direction of the Engineer in charges

9

181

1631.7

... More
Electrical

-

-

-

... More
Recessed wiring to light point /fan point/ call bell point/ exhaust fan point /wall fan point with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic 1.6mm thick PVC conduit with 6 Amp, 250 V clip in type modular switch ISI marked and ceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size , with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection as per direction of Engineer in Charge.(length-4mtr) Primary Point.

40

1186

47440

... More
S/F of 2X 5 / 6 amp modular socket outlet with 2X6Amp, 250 V clip in type modular switch ISI marked mounted on separate G.I moular box with face plate & cover of suitable size including all accessories and connection on same switch board as per direction of Engineer in Charge for computer points.

15

706

10590

... More
Supplying and fixing of metal box (nominal size) on surface or in recess with suitable size of modular base and cover plate in front including providing and fixing 15 / 16 amps socket outlet and 15 / 16 amps modular type switch, connection, etc as required. as per direction of Engineer in Charge.

30

883

26490

... More
Recessed wiring to submain in 2x1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired including all accessories and connection as per direction of Engineer in Charge.

200

163

32600

... More
Recessed wiring to submain in 2x2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired including all accessories and connection as per direction of Engineer in Charge.

200

181

36200

... More
Supply and fixing of 18W LED batten type tube light including all accessories ,materials as required as per the direction of EIC.

342

449

153558

... More
Supplying and fixing of 1200 mm sweep BLDC fan without remote including all accessories and connection as per direction of Engineer in Charge.

164

4260

698640

... More
Supplying and fixing of 250 mm sweep plastic exhaust fan including all accessories and connection as per direction of Engineer in Charge.

10

3091

30910



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.