Odisha Mining Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_OMC_81710_1Bid Award Id
ViewTender No
NIT No. 35/OMC/CIVIL/2022Tender Authority
Odisha Mining Corporation Limited ViewPurchaser Address
-Website
http://https://omcltd.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Conducting detailed design and engineering for all civil, PH, Electrical, Mechanical and instrumentation work for sprinkler system
-
-
-
Detail engineering of civil and PH works, Pump House / Control Room, Pipe Line, Sprinkler etc. for acceptance of OMC.
1
-
-
Detail engineering of mechanical and electrical works, like Pumps, control pannel / DG Set etc. for acceptance of OMC.
1
-
-
Detail engineering of instrumentation and control system. (PLC system) etc. for acceptance of OMC.
1
-
-
Supply of materials, equipments and accessories as per detailed design and specification. The material should be stacked at appropriate safe place for inspection.
-
-
-
Supply of HDPE pipes, sprinklers and accessories as per design requirement.
1
-
-
Supply of Gate valves, NR valves, solonoid valves and accessories as per design requirement.
1
-
-
Supply of monoblock pump / Pumps and accessories etc, as per design requirement.
1
-
-
Supply of control pannel, PLC system and accessories etc. as per design requirement.
1
-
-
Civil works
-
-
-
Equipment foundation for all equipments as per the design requirement
1
-
-
Construction of pump house / control panel room as per design requirement with electrification.
1
-
-
Structural support, Valve chamber, road crossing, Protecting structures ect as per design requirement.
1
-
-
Laying of HDPE pipe line in underground with back filling and installation of demarcation flag etc. as per design requirments.
1
-
-
Repair maintenance of 2 numbers of MS water tank of 5000 litre capacity each
1
-
-
Installation work
-
-
-
Installation of pumps, control pannel and PLC system (This includes both raw water pump for pumping from Dalko Nallah & sprinkling pump)
1
-
-
Installation of sprinkler, valves and accessories
1
-
-
Trial run and commissioning of automated water sprinkling system
-
-
-
Trial run and commissioning of automated water sprinkling system along with modification, rectification if any required complete in all respect
1
-
-
Operation and maintenance of water sprinkling system with DG Power installed and commissioned
-
-
-
1st year Operation and maintenance of this system as per scope of work.
1
-
-
2nd year Operation and maintenance of this system as per scope of work.
1
-
-
3rd year Operation and maintenance of this system as per scope of work.
1
-
-
4th year Operation and maintenance of this system as per scope of work.
1
-
-
5th year Operation and maintenance of this system as per scope of work.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements