Odisha Mining Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Odisha Mining Corporation Limited - OMC Tender
Civil And Construction
Eprocure
Opening Date30 Nov 2022
Closing Date14 Dec 2022
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_OMC_83770_2Bid Award Id
ViewTender No
NIT No. 48/OMC/CIVIL/2022Tender Authority
Odisha Mining Corporation Limited ViewPurchaser Address
-Website
http://https://omcltd.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supply of electro-mechanical equipment for 30 KLD STP as per design and as directed by Engineer-in-Charge.
1
-
-
Installation of all electro-mechanical equipment along with its fittings and fixtures all complete as per the design drawing/ as directed by Engineer in charge.
1
-
-
Supply, installation, completion of sewer pipeline ,Laying ( to level or slopes) conforming to IS 783-1959 and jointing with Cement Mortar (1:2) of Concrete pipes Class NP-2 , reinforced light duty non-pressure pipes conforming to IS:458-2003 with collars & butt ends prepared for Collar joints of the following internal diameter. Excavation in all kind of soil including hard rock & cutting the CC/BT road and excavation using machine and mending to its original state as required at site.
A. 150 mm dia NP 2 Hume pipe. or B. 150 mm dia PVC SWR pipe IS-13592 class -B of 6 kg /cm2 pressure rating with C.C (1:1.5:3) all round encasing as detailed on BID doc and as directed by EIC.
250
-
-
Supply, installation, laying & completion of sewer pipeline HDPE tubes of 10Kg/sqcm confirming to I.S No. 4984/1995 the following outer diameter & tube fittings including testing as per specification complete excluding earth work, excavation in all kind of soil including hard rock & cutting the CC/BT road and excavation using machine and mending to its original state as required at site.as per design drawing approx. (meter of size) as below:
A. 75 mm dia HDPE pipe (Grade-PE-63)
20
-
-
Dismantling, reconstruction and reconnection of new infra accessories for smooth operation of STP along with New Manhole as per the NIT for pumping as may be required at site with PVC SWR pipe IS-13592 class -B of 6 kg /cm2 pressure rating.
1
-
-
Initial 72 hrs Hydro test for all constructed civil structures and trial commissioning of STP.
1
-
-
Commission and trial run for 3 months with respective test reports fortnightly for outlet quality and monthly for inlet quality of raw sewage as below parameters:
A. pH
B.TSS
C. TDS
D.BOD
E.COD
F.Oil & Grease G.Ammonia
1
-
-
OMC for 3 years
Annual Operation & Maintenance of STP (Sewerage Treatment Plant) including repairs and replacements & periodical preventive maintenance of all pumps, equipments, accessories and other electro-mechanical units with supply of necessary manpower including supervisory staff and deployment of technical experts / skilled technicians as may be required for effective operation of the STP and with supply of necessary chemicals, lubricants, consumables / biomass culture etc. all complete for successful operation of the STP ( Excluding cost of power supply)
-
-
-
1st year
1
-
-
2nd year
1
-
-
3rd year
1
-
-
Evaluation Notes How It Works ?