Odisha Lift Irrigation Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 78,642Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OLIC_101213_1Bid Award Id
ViewTender No
EE/OLIC/BGH-15/2023-24Tender Authority
Odisha Lift Irrigation Corporation Limited ViewPurchaser Address
-Website
http://http://www.odishalift.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cement concrete (1:4:8) with 4cm size h.g.b. crusher broken metal of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement T&P required etc. complete as per the direction of the Engineer-incharge.
11.39
66473
5836.14
Brick work with K.B. Brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / cm2 with dimensional tolerrance + 8% in cement mortar (1:6) in foundation & plinth etc. complete as per the Engineer-incharge.
a) In foundation and plinth
30.17
159454
5285.19
b) In Super Structure
16.33
88419
5414.57
RRHG Stone Masonary in C.M. (1:6)
8.47
38704
4569.59
Cement concrete (1:2:4) with 12mm size black h.g.b. crusher broken chips of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement T&P required etc complete as per the direction of the Engineer-incharge.
22.02
177183
8046.46
Rigid smooth centering & shuttering for R.C.C. works including false work & dismateling then after including cost of materials in ground floor complete an directed by the Engineer-incharge.
a) Plinth Bend
55
13022
236.78
b) Lintel
1.43
761
532.81
c) Chajah
1.04
704
677.37
d) Roof Slab
145.98
98882
677.37
R.C.C. work in C.C. (1:2:4) including hoisting & laying & curring for 28days using 12mm. Size clean black hard granite crusher broken chips of approve quality and from approve quarry including cost taxes conveyance charges of all materials to the worksite with supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge.
16.44
132283
8046.46
2.5mm thick A.S. flooring with C.C. (1:2:4) using 12mm size black hard granite crusher broken chips of approve quality for approve quorry including water and curring with cost taxes royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge.
49.76
18304
367.86
20mm cement plaster in cement mortar (1:4) finished smooth to stone work after racking out joints including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge.
2238.76
586353
261.91
12mm cement plaster in cement mortar (1:6) finished smooth to brick work after racking out joints including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge.
747.57
122608
164.01
Supplying, fitting and placing uncoated HYSD Bar rain for cement complete as per drawing and tachnical specification as per the direction of Engineer incharge.
28.79
230669
8012.15
Writing charges of required data on the wall of pump chamber/Transporency Pillar including supplying of approved paints and required material for writing etc. complete as per the direction of the Engineer-incharge.
2
2000
1000
Cement punning over plastering including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge.
314
11555
36.8
White washing 3 coat with approve good stone lime including cost conveyance charges of materials including supply of labour, gum, indigo etc. required for the work complete as directed by the Engineer-incharge.
15.48
196
12.69
Supply fitting and fixing of Iron Door with Choukat
2
8000
4000
Supply fitting and fixing of Iron Window with Choukat
5
15000
3000
Painting 2 coats with approved shade of paint after a coat of primer including all cost
23.85
4898
205.4
Distempering two coats to walls with distemper of approved shade on new work to give an even shade after 1 coat of white washing
290.84
22839
78.53
20mm thick cement plaster (1:4) for grading plaster
14.1
3692
261.91
Supply, fitting and fixing of skylight
6
2400
400
Removing old lime of cement plaster from walls including racking out joint 12mm deep and removing debries within 50 mtrs. lead.
214.27
9232
43.09
Dismantling and removing 2.5 cm thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50 mtrs. lead.
70.67
11385
161.11
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing debris within 50 mtrs. lead.
6.11
3885
635.92
Writing charges of required data on the wall of pump chamber
1
2000
2000
Replacement of asbestos sheet 45 sqm
45
9409
209.1
Fitting of un plasticised all dia PVC Pipe for all classes including jointing the pipe with solvent cement by non-head application method including fitting and fixing of required no. of PVC Tee for outlet and PVC Shaddle and PVC Riser nipple for fitting air valve, equal Tee etc. including cost of PVC Pipe, cost of Solvent Cement, Transportation of Pipe complete including conveyance pipe from village to worksite and testing of pipe line etc. complete as per the direction of the Engineer-incharge.
a) 315 mm Ø PVC pipe (Cl-II) 4 kgf/cm2
2334
3326836
1425.38
Filling the foundation and plinth with excavated material as directed by the Engineer-incharge.
a) Hard soil
2894.46
339230
117.2
Cost of 40 HP Submersible Pump of 7 cusec discharge & 15 mtr. head
2
832000
416000
Cost of Control Panel with 40 HP Starter
2
120000
60000
Repair of 40 HP existing old pump including rewiding etc.
1
45000
45000
Repair of 1 no. of Starter, replacement of 100mm cable, 3nos of Main swtich, wiring of pump chamber complete.
1
150000
150000
Cost of 400 Ampr Main Switch confirming to IS No.4064
3
36000
12000
Base Plate made of MS Channel and Flat with holes
2
20000
10000
Cost of 35mm2/ 50mm2 single core PVC Cable
150
37500
250
Electrical earthing
6
30000
5000
Dismentling and refitting of Pumps, Starters, Cable, N.R. Valve, Sluice Valve etc.
3
60000
20000
Cost of 400 mm Ø MS Pipe
24
120000
5000
Cost of 315 mm Ø PVC Bend
3
6300
2100
Cost of 400 mm Ø MS Flange
8
12000
1500
Labour Charges for Laying and Fitting of 400 mm Ø MS Pipe
24
10632
443
Repair of NR Valve, Sluice Valve etc.
3
60000
20000
Cost of Repair of Delivery Pipe including dismentling
1
20000
20000
Cost of 300 mm R.C.C. hum pipe (NP 3) as per specifications including laying & fitting
20
19060
953
Provision for Iron Shutter
1
2000
2000
Cost of Misc. Welding charges for "Z" joint, "S" bend, "Y" Joint etc.
1
6600
6600.56
Cost of Nut Bolt
20
1450
72.54
Cost of Rubber Insertion
20
1160
58
Cost of Outlet
40
10000
250
Labour charges for delivery and fitting including fitting of priming Tee, sluice Valve, NR Valve, air release valve and riser Tee etc and installation
3
15000
5000
Supply of small T&P kit comprising of hand gloves-1 pair,tester-1 no, 8 inch cutting plier -1 no, 12 inch sly wrench-1 no, 12 inch Screw driver-1 no. , 24/27 & 21/23 De spanner-2 nos., 24/27 & 21/23 Ring spanner- 2 Nos. (Taparia)
1
1500
1500
Cost of digitiliation of pre / post photo, display board in ACP sheets with informatary information as per guide line including fixing all.
1
3000
3000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements