Odisha Lift Irrigation Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Lift Irrigation Corporation Limited - OLICL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 26,95,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling in F&P with excavated materials including well watered and rammed.(60% of Pipe Line)

446.8

68

30525.38

... More
Filling F and P with sand, well watered and rammed

10.56

531

5610.84

... More
Cement concrete (1:4:8) with 4cm (1½”) size hard granite metal (Crusher Broken)

8.05

5537

44577.44

... More
RCC/Cement Concrete (1:2:4) with 12mm (½”) size hard granite chips (Crusher broken)

13.29

7878

104700.61

... More
FLY Ash Brick masonary in cm(1:6) in foundation and plinth (25cm X 12cm X 8cm size)

9.26

5724

53011.09

... More
FLY Ash Brick masonary in cm(1:6) in Superstructure work ( 25cm X 12cm X 8cm size )

10.03

5757

57750.13

... More
12mm thick Cement plaster in CM (1:6) over brick work

216.84

190

41388.25

... More
Cement punning over plastering

81.33

42

3452.46

... More
Rigid smooth centering shuttering for R.C.C. work including all cost etc. complete Roof slab, R.C.C. floor, Landing Balcony, Projection sun shed & Chajja, Sheles (Column Base)

89.45

144

12926.42

... More
(A) Column Base

10.8

144

1560.71

... More
(B) Columns

10.05

1016

10213.31

... More
( C ) Plinth Bend Floor Slab Beams and Roof Slab,cornice,Lintels , Chajjas.

10.7

659

7054.51

... More
Cost of 40 mm sige HG metal for spreading

1.38

1504

2076.27

... More
2.5 cm. thick A.S flooring with cement concrete (1:2:4) including punning using 12mm size C.B. chips including at cost etc. complete

7.15

400

2863.43

... More
Labour charge for M.S. reinforcement for R.C.C. work including cutting bending, binding & typing the grills & placing in position including cost of binding wire 18 to 20 guage per Qntl.

10.14

8574

86949.99

... More
Distempering two coats to walls with distemper of approved shade on new area

60.79

44

2682.66

... More
Painting two coats with enamel paint for priming over iron work indcluding (Door & Window)

5.16

73

378.49

... More
Labour charge for spreding of metal (Labour only)

1

1000

1000

... More
White washing 2 coats with shell lime.

85.2

15

1325.71

... More
Cost of 45mm Dia steel Pipe of Length 6mtr & cost of 4mm thick ( 1.2m x 0.9m ) 33.91 kg MS Plate inlcluding fitting , fixing , bracing & welding etc

1

7849

7849.88

... More
Cost of Stickering & Lettring with radium Boarder

1

1500

1500

... More
Cost of M.S. Pannel Iron door with M S Frame etc. (Size 1 x 1.00m x 1.80 m ) weight 63kg

1

7560

7560

... More
Cost of M.S. Pannel Iron Window with M S Frame etc. (Size 1 x 0.90m x 0.75 m ) weight 23.625 kg

1

2835

2835

... More
Cost of Pump Chamber wiring with all electrical materials like conduit pipe, switchs, holders, bulbs & board etc. including labour cost.

1

5000

5000

... More
Cost of M.S. fabricated gate including fitting and fixing charges etc. complete. (Size 1.5mx1.5m) for S/S Compound wall

1

5500

5500

... More
Provision for foundation nut bolt, Rubber insertion, including cost of cutting, threading & Fabrication etc

1

6000

6000

... More
Cost of 300 mm R.C.C. hum pipe( NP 3 )as per specifications including laying & fitting

9

953

8577

... More
Cost of 12.5 HP Centrifugal monoblock pumpset having 0.028 cumec discharge and 20 Mtr. head

1

41333

41333

... More
Cost of 15 HP Control Pannel with Auto star delta starter & MCB

1

15429

15429

... More
Cost of 63 Amp -400 Main Switch confirming to IS No.4064

1

3141

3141

... More
Cost of Base Plate for Motor Made of MS Channel

1

1004

1004

... More
Cost of Pannel Board with stand

1

3141

3141

... More
Cost of Base Frame for Pannel Board (0.4m x 0.2m)

1

993

993

... More
Cost of Motor Hood made out of 18mm gauge CR sheet

1

742

742

... More
Cost of 6 KVAR Capacitor

1

1819

1819

... More
Cost of 3x16mm2 T.D. cable

40

116

4640

... More
Cost of 4mm2 PVC Wire (Copper)

20

58

1160

... More
Cost of Electrical Earthing

2

4092

8185

... More
Cost of 100 mm Ø G.I. Pipe

24

1236

29676.72

... More
Cost of 100 mm Ø G.I. Bend (Medium duty)

4

826

3306.12

... More
Cost of 100 mm Ø G.I. Flange (Medium duty)

14

436

6109.74

... More
Cost of 100 mm Ø C.I. Foot Valve

1

1159

1159.34

... More
Cost of 100 mm Ø Sluice Valve

1

6897

6897.12

... More
Cost of 100 mm Ø C.I.Reflux Valve (NR)

1

9586

9586

... More
Cost of 200 mm Ø HDPE Pipe PN-4, PE-80 (Including cost of Pre & Post CIPET)

702

631

442997.1

... More
Cost of complete Jointing Charges of 200 mm dia HDPE pipe etc

702

12

8859.24

... More
Labour charges for laying , fitting & Fusion welding of 200 mm Ø HDPE Pipe PN-4/6, PE-80

702

425

298427.22

... More
Transportation Cost of 200 mm Ø HDPE Pipe PN-4, PE-80

702

34

24415.56

... More
Cost of 160 mm Ø HDPE Pipe PN-4, PE-80 (Including cost of Pre & Post CIPET)

504

405

204462.72

... More
Labour charges for laying , fitting & Fusion welding of 160 mm Ø HDPE Pipe PN-4, PE-80

504

308

155665.44

... More
Cost of complete Jointing Charges of 160 mm dia HDPE pipe etc

504

8

4087.44

... More
Transportation Cost of 160 mm Ø HDPE Pipe PN-4, PE-80

504

27

13638.24

... More
200 mm Slipon Flange

1

449

449.4

... More
200 mm HDPE End Cap

1

295

295.16

... More
160 mm HDPE End Cap

6

117

705.72

... More
160 mm HDPE Tail Piece

8

329

2636.48

... More
160x160x160 HDPE Equal Tee (Spigot Design)

3

973

2919.45

... More
200x200x160 HDPE Equal Tee (Spigot Design)

4

2658

10634.76

... More
Cost of 160mm Butterfly Valve

4

10252

41010.52

... More
Cost of 50 mm Ø Air release valve with saddle & Raiser pipe (KS)

3

7520

22561.32

... More
Cost of 160 mmx160mmx110 mm G.I.Tee with accessories & Outlet

12

4959

59509.92

... More
Cost of River Bank cutting & shaping for const. of P.F.

1

7500

7500

... More
Cost of 110 mm G.I Socket

1

1000

1000

... More
Cost of 100x100x25mm G.I. Tee with Plug for priming

1

750

750

... More
Cost of 200 mmx110 mm G.I./M.S. Reducer Socket

1

1354

1354

... More
Misc. Welding charges for "Z" joint, "S" bend, etc.

1

3500

3500

... More
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line

1

10780

10780

... More
Cost for Electrical Installation & energisation & Installtion of MB pump set with Trail run including fitting of Sluice Valve, NR valve, Butterfly Valve etc incluing labour cost and fitting materials.

1

12890

12890

... More
Cost of 11/0.4 KV 25 KVA Transformer (BIS Energy level -II) DPM S/S

1

340208

340208

... More
Cost of 3Ph.3 W 11 KV Line with 55 mm2 AAAC on 300 Kg 9 Mtr long PSC Pole having one taping point & two cut points (Span length-60Mtr)

0.2

448727

89745.4

... More
Cost for construction 3Ph 4W AB cable L.T. Line with 50mm2 cable, L.T. distribution box with accessories.

0.04

340786

13631.44

... More
11KV line single pole Cut point

1

30222

30222

... More
11KV Taping pole with all accessories

1

30222

30222



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.