Odisha Lift Irrigation Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 11,360Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_OLIC_63120_3Bid Award Id
ViewTender No
12 / OLIC (CTC) / Dt. 08/10/2020Tender Authority
Odisha Lift Irrigation Corporation Limited ViewPurchaser Address
-Website
http://http://www.odishalift.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Labour for drilling of perfect vertical bore hole of specified depth below ground level in alluvial soil strata by mud rotary rig drilling as required to sui the site condition as per the driction of Rngineeer-in - charge including supply of Rig with it's accessories, tools and plant and consumable etc.for lowering of finished bore for 450mm dia and suitable for lowering of 200mm dia PVC pipe for housing , fitted with socket with or without well screen as per the necessity for the soft , medium , hard and boulder formation ( GI/PVC casing popes if required by the contractor to prevent collabse of over bourden portion ) in cluding lower and withdraing of casing pipe after drilling 200mm to 450mm dia in over bourden portion up to 100mtr. o mtr to 100mtr.
(91 to 100 mtr)
24
-
1350
... More
Supply of all labour and T & P for lowering following size GI/PVC pipes with or without slotted pipes as per the necessity from ground level and fitting and fixed up in perfectly vertical position including cutting and threading pipe and slotted pipe and fixing all joint materials , tools and plants etc. complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entri to foreign materials from above excluding cost of fittings and jointing materials and packing gravels arount the casing in the annular space as per the driction of the Engineer, 0 to 100 mtr.
(0 mtr to 60 mtr)
285
-
85
... More
Providing of 200mm dia PVC well casing as per ASTM D 1785/2004 ( Schedule -80 ) blue in colour having specific gravity of the maaterials od the pipe 1.40 to 1.46 gms/cc straight length of 3 mtrs PVC pipe s including transportation to site etc. complete as per direction of site Engineer.
285
-
1415.9
... More
Cost of slotting charges of 200 mm dia PVC ( ASTM D) Sch -80 pipe
72
-
425
... More
Cost of bentonite drilling mud including transportation to site etc.
159
-
350
... More
Providing of Graded and washed gravel of B grade including transportion to site etc. completer as per direction of engineer _- in - charge.
36
-
3580
... More
Cost of 200mm dia PVC cone
3
-
1010
... More
Cost of 200mm dia PVC end cap
3
-
760
... More
Cost of 200mm dia PVC nipple
3
-
705
... More
Cleaning and developing the production well using own Air compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of the Engineer at site.
90
-
1225
... More
Excavation of mud pit, settling pit and fluid channel and back billing with preparation od approches to movement of rig and ancillaries etc. complete
3
-
8500
... More
Operation of 5HP water pump for filling of mud pit
60
-
75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements