Odisha Industrial Infrastructure Development Corporation Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Industrial Infrastructure Development Corporation - IDCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date16 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 12,98,630 
Notes
Download

Costs

Summary

Shifting Of 11 Kv Line In Front Of Kala Bhumi, Gandamunda Under Electrical Section Khandagiri,bhubaneswar.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply & installation of Fish Plate 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the specification and direction of EIC.

7.93

124

985.3

... More
Supply & installation of AB switch Mounting Channel 75X40X4.8mm, 7.14KG/Mtr, each channel length 3 Mtr., 2 no's channel required =(7.14x3x2).Complete in all respect as per the specification and direction of EIC.

85.68

96

8298.11

... More
Supply & installation of AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =(9.56x2x0.35).Complete in all respect as per the specification and direction of EIC.

13.38

96

1295.85

... More
Supply & installation of Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr, each channel length 0.8 Mtr..1 no's channel required =(7.14x0.8x1).Complete in all respect as per the specification and direction of EIC.

11.44

96

1107.96

... More
Supply & installation of Double Pole Belting Channel 75X40X4.8mm.,7.14KG/Mtr.,each channel length 3.0 Mtr., 4 no's channel required = (7.14x3x4). Complete in all respect as per the specification and direction of EIC.

171.36

96

16596.22

... More
Supply and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr.,4 nos angle required = (4x4.5x 3.512).Complete in all respect as per the specification and direction of EIC.

126.43

96

12244.75

... More
Supply and installation of Danger Plate,2 no's. Complete in all respect as per the specification and direction of EIC.

4

132

530.12

... More
Supply and installation of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the specification and direction of EIC.

1.21

124

150.34

... More
Supply and installation of H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired .Complete in all respect as per the specification and direction of EIC.

4

190

760.72

... More
Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the specification and direction of EIC.

4

1597

6390.04

... More
Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the specification and direction of EIC.

4

76

304.28

... More
Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the specification and direction of EIC.

60

114

6846.6

... More
Supply & installation of Gi Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the specification and direction of EIC.

4

1597

6390.04

... More
Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36. Complete in all respect as per the specification and direction of EIC.

96.76

124

12022.43

... More
Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required. Complete in all respect as per the specification and direction of EIC.

12

132

1590.36

... More
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg /Mtr. Flat of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the specification and direction of EIC.

4.82

124

598.89

... More
Supply & installation of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the specification and direction of EIC.

6

5881

35287.26

... More
Supply & installation of AB Switch (11KV,400A, 3pole,50Hz). Complete in all respect as per the technical specification and direction of EIC.

2

19631

39263.26

... More
Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the technical specification and direction of EIC.

6

331

1988.04

... More
Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the specification and direction of EIC.

12

579

6958.08

... More
Supply & installation of Disc insulator (B&S) 70KN polymer.Complete in all respect as per the specification and direction of EIC.

12

1905

22862.16

... More
Supply & installation of PG Clamp for 100 sq. mm AAA conductor. Complete in all respect as per the specification and direction of EIC.

12

960

11530.44

... More
Supply & installation of Gl Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the specification and direction of EIC.

27.44

129

3545.8

... More
Supply and painting of Black paint as required and direction of EIC.

2

364

728.94

... More
Supply and painting of Yellow colour paint for background as required and direction of EIC.

4

275

1101.04

... More
Part A- Cost of Civil Works.

-

-

-

... More
Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mnm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.

4

2272

9090

... More
Concreting ratio 1:1.5:3 (500mmX500mm X1800mm) = 0.45Cu.mtr.Complete in all respect as per the direction of EIC.

1.8

6565

11817

... More
Couping ratio 1:1.5:3 with dimension (500X 500X450)= 0.1125 Cu mtr.Complete in all respect as per the direction of EIC.

0.45

6565

2954.25

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/50mm including welding of Gi flat around pipe as per the specification of TPCODL.

4

3737

14948

... More
Part B- Cost of Materials for 11KV Cut Point With 90 Degree Angle .

-

-

-

... More
Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel length 1.2 mtr, 4no's channel required =( 4x9.56x1.2). Complete in all respect as per the specification and direction of EIC.

45.89

96

4444.45

... More
Supply & installation of Fish Plate 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,16 no's required =(16x2.36x0.280).Complete in all respect as per the specification and direction of EIC.

10.57

124

1313.32

... More
Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr. 4no's channel required =(4x9.56x0.306). Complete in all respect as per the specification and direction of EIC.

11.71

96

1134.11

... More
Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the specification and direction of EIC.

6

331

1988.04

... More
Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the specification and direction of EIC.

9

579

5218.56

... More
Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the specification and direction of EIC.

9

1905

17146.62

... More
Supply & installation of PG Clamp for 100 sq.mm AAA conductor. Complete in all respect as per the specification and direction of EIC.

6

960

5765.22

... More
Supply & installation of H.T. Stay clamp. 50x8 mm. flat,3.14Kg/Mtr.,0.551 Mtr. Length, 2 no's qty.required. Complete in all respect as per the specification and direction of EIC.

2

189

379.18

... More
Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the specification and direction of EIC.

2

1597

3195.02

... More
Supply & installation of H.T. Stay Insulator Type-C. Complete in all respect as per the specification and direction of EIC.

2

76

152.14

... More
Supply & installation of 7/10 SWG Stay Wire 15kg/stay. Complete in all respect as per the specification and direction of EIC.

30

114

3423.3

... More
Supply & installation of GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole). Complete in all respect as per the specification and direction of EIC.

7.43

129

960.11

... More
Part B- Cost of Civil Works.

-

-

-

... More
Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mnm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.

2

2272

4545

... More
Part C- Cost of Materials for 11 KV Pin Points With WPB - 0.4CKM.

-

-

-

... More
Supply & installation of WPB (GI) Pole 160x152 (13Mtr. Long,30.44KG/Mtr).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.

9

41953

377582.22

... More
Supply & installation of 11KV V cross Arm (10.2 Kg. each). Complete in all respect as per the specification and direction of EIC.

9

1341

12077.19

... More
Supply & installation of Top bracket 100x50X6 mm Gl channel (2kg each).Complete in all respect as per the specification and direction of EIC.

9

248

2236.5

... More
Supply & installation of Danger Plate,1 no's. for each pole. Complete in all respect as per the specification and direction of EIC.

9

132

1192.77

... More
Supply & installation of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's =(1x0.59x0.510). Complete in all respect as per the specification and direction of EIC.

2.71

124

336.72

... More
Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support. Complete in all respect as per the specification and direction of EIC.

27

132

3578.31

... More
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr Iength 4 no's =(4x0.59x0.510). Complete in all respect as per the specification and direction of EIC.

10.83

124

1345.63

... More
Supply & installation of 11 KV pin insulator polymer, 3 Nos. required for each support. Complete in all respect as per the specification and direction of EIC.

27

331

8946.18

... More
Supply & installation of Earthing of Support Coil Type. Complete in all respect as per the specification and direction of EIC.

9

275

2475.09

... More
Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil. Complete in all respect as per the specification and direction of EIC.

2.36

124

293.23

... More
Supply & installation of GI Nut, Bolt & Washer of different sizes (1.45 Kg/ Pin Point). Complete in all respect as per the specification and direction of EIC.

13.05

129

1686.32

... More
Supply & Stringing of 145 mm2 AAAC conductor. Complete in all respect as per the specification and direction of EIC.

1236

135

167907.63

... More
Supply and painting of Black paint as required and direction of EIC.

9

364

3280.23

... More
Supply and painting of Yellow colour paint for background as required and direction of EIC.

18

275

4954.68

... More
Part C- Cost of Civil Works.

-

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mm X1800mm) = 0.45Cu.mtr.Complete in all respect as per the direction of EIC.

4.05

6565

26588.25

... More
Couping ratio 1:1.5:3 with dimension (500X 500X450)= 0.1125 Cu mtr.Complete in all respect as per the direction of EIC.

1.01

6565

6630.65

... More
Dismentaling of 11KV line

1200

6

7878

... More
Dismantling of 116x100 mm RS Joist

11

1394

15341.81

... More
Dismantling / Removal of V Cross arm from pole including loading, transportation, unloading and staking of dismantled material at a proper place in safe position at Site Store.

7

42

299.39

... More
Dismantling / Removal of MS Channel from pole including loading, transportation,unloading and staking of dismantled material at a proper place in safe position at Site store

120

8

960

... More
Part D- Cost of Materials for Line Protecting Guarding on double pole for Road Crossing - 1 No.

-

-

-

... More
Supply & installation of Guarding Channel 75x40 x4.8mm, 7.14 KG/Mtr., each channel length 3.5 mtr. 4 no's channel required =(4x7. 14x3.5) (For Double Pole).Complete in all respect as per the specification and direction of EIC.

99.96

96

9681.13

... More
Supply & installation of No-6 Gl wire (0.192 kg/mtr.) for Main String.. Complete in all respect as per the specification and direction of EIC.

30.72

124

3816.96

... More
Supply & installation of No-8 Gl wire (0.131kg /mtr.) for lacing. Complete in all respect as per the specification and direction of EIC.

6.55

124

813.84

... More
Supply & installation of Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.). Complete in all respect as per the specification and direction of EIC.

4

99

397.6

... More
Supply & installation of Gi Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the specification and direction of EIC.

2

1739

3479.02

... More
Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36. Complete in all respect as per the specification and direction of EIC.

50.51

124

6275.87

... More
Part D- Cost of Civil Works.

-

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/50mm including welding of Gi flat around pipe as per the specification of TPCODL.

2

3737

7474

... More
Part E- Cost of Materials for Line Protecting Guarding on single pole for Road Crossing- 1 No.

-

-

-

... More
Supply & installation of Guarding Channel 75x40 x4.8mm, 7.14 KG/Mtr., each channel length 2.2 mtr. 4 no's channel required =(4x7.14x2.2) (For Double Pole). Complete in all respect as per the specification and direction of EIC.

62.83

96

6085.09

... More
Supply & installation of No-6 Gl wire (0.192 kg/mtr.) for Main String.. Complete in all respect as per the specification and direction of EIC.

30.72

124

3816.96

... More
Supply & installation of No-8 Gl wire (0.131kg /mtr.) for lacing. Complete in all respect as per the specification and direction of EIC.

6.55

124

813.84

... More
Supply & installation of Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.). Complete in all respect as per the specification and direction of EIC.

4

99

397.6

... More
Supply & installation of Gi Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the specification and direction of EIC.

2

1739

3479.02

... More
Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36. Complete in all respect as per the specification and direction of EIC.

50.51

124

6275.87

... More
Part E- Cost of Civil Works.

-

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/50mm including welding of Gi flat around pipe as per the specification of TPCODL.

2

3737

7474

... More
Part F- Cost of Materials for LT Cable Line with (3x50 + 1x35 mm2) - 0.22 KM.

-

-

-

... More
Supply & installation of 9 Mtr. long 300 Kg. PSC Pole .Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.

7

5375

37630.25

... More
Supply & installation of LT Stay set Complete. Complete in all respect as per the specification and direction of EIC.

2

791

1582.3

... More
Supply & installation of 7/12 SWG GI stay wire Grade -2. Complete in all respect as per the specification and direction of EIC.

24

114

2738.64

... More
Supply & installation of LT stay Clamp 1.40Kg/pair). Complete in all respect as per the specification and direction of EIC.

2

167

334.72

... More
Supply & installation of LT Stay insulator. Complete in all respect as per the specification and direction of EIC.

2

45

91.28

... More
LT Accessories with Eye hook and and Clamp.

-

-

-

... More
Supply & installation of Pole clamp for EYE hook for XLPE Aerial bunched Cable. Complete in all respect as per the specification and direction of EIC.

10

331

3313.4

... More
Supply & installation of EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm). Complete in all respect as per the specification and direction of EIC.

4

99

397.6

... More
Supply & installation of Dead End Clamp suitable for messenger XLPE Aerial bunched Cable(25-70 sq.mm). Complete in all respect as per the specification and direction of EIC.

4

107

430.72

... More
Supply & installation of Suspension Clamp with EYE hook for ABC (25-70 sq.mm). Complete in all respect as per the specification and direction of EIC.

6

563

3379.62

... More
Supply & installation of 3x50 + 1x35 mm2 (LT AB Cable). Complete in all respect as per the specification and direction of EIC.

231

215

49750.47

... More
Supply & installation of Insulated piercing connector, Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm. Complete in all respect as per the specification and direction of EIC.

3

144

432.33

... More
Supply & installation of Gl Pipe Earthing (each 5th pole to earth). Complete in all respect as per the specification and direction of EIC.

1

1597

1597.51

... More
Supply & installation of Coil Earthing. Complete in all respect as per the specification and direction of EIC.

6

275

1650.06

... More
Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the specification and direction of EIC.

1.83

124

227.38

... More
Supply & installation of Danger plate (LT). Complete in all respect as per the specification and direction of EIC.

7

132

927.71

... More
Supply & installation of Back Clamp for danger Plate 25X3 mm. fliat, 0.59Kg/Mtr. Flat of 0.510mtr length 1no's = (1x0.59x0.510). Complete in all respect as per the specification and direction of EIC.

2.11

124

262.17

... More
Supply & installation of Gl barbed wire anticlimbing device 3 Kg, Per support. Complete in all respect as per the specification and direction of EIC.

21

132

2783.13

... More
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr Length 4 no's=(4x0.59x0.510). Complete in all respect as per the specification and direction of EIC.

8.43

124

1047.43

... More
Supply & Instalation of GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole). Complete in all respect as per the specification and direction of EIC.

3.5

129

452.27

... More
Supply and painting of Black paint as required and direction of EIC.

7

364

2551.29

... More
Supply and painting of Yellow colour paint for background as required and direction of EIC.

14

275

3853.64

... More
Part F- Cost of Civil Works.

-

-

-

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay piate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation,supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all iabour and material (Excavation of earth will be done of size 500X500X1500 mm.) .Complete in all respect as per TPCODL Drawing & Standard.

2

2272

4545

... More
Concreting ratio 1:1.5:3 (500mmx500mmX 1500mm) = 0.375Cu.mtr.Complete in all respect as per the direction of EIC.

2.63

6565

17265.95

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/50mm including welding of Gi flat around pipe as per the specification of TPCODL.

1

3737

3737

... More
Dismantling of LT ABC.Complete in all respect as per the direction of EIC.

220

22

5000.6

... More
Dismantling of 8 meter LT PSC pole.Complete in all respect as per the direction of EIC.

3

929

2789.46



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.