Odisha Industrial Infrastructure Development Corporation Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,53,427Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IDCO_101422_2Bid Award Id
ViewTender No
PC/EST/E-199/2023-24Tender Authority
Odisha Industrial Infrastructure Development Corporation ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, laying & testing of 1.1 KV grade 3CX1.5sqmm cu. Flexible cable with required termination to connect from base of the pole to the light fittings.
1200
-
-
... More
Supplying and making end termination with brass compression gland and aluminum lugs for following size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required and as per direction of Engineer-in-charge.
-
-
-
... More
3.5 core x 35 sqmm Aluminium armoured cable
6
-
-
... More
4 core x 10 sqmm Aluminium armoured cable
250
-
-
... More
Supply and Installation of 9mtr high galvanised Octagonal pole with coil earthing of double/single arm as per Site condition and direction of EIC(1.5 mtr to 2 mtr lenght to achive minimum lux of 25-30) with PU paint in shape shall be designed to withstand the maximum wind speed 200Km/Hr and as per IS 875. The top loading i.e. area and the weight of fixtures are to be considered to calculate maximum deflection of the pole and the same shall meet the requirement of BSEN 40-3-3:2003. Octagonal Poles made from HT Steel Conforming to grade S355 & having thicknessof 3mm.Top dia or more 85mm or more & Bottom dia 190mm or more single sharp welding with base plate dimension 300x300x20 mm or more & Base Plate must be Fe 410 conforming to IS 2062, foundation bolts must EN 8 grade terminal box with provision for connection of earth, including Coil earthing & neutral on 5mm thick fiber plate which will be kept in side the pole for termination of cable & wire,The pole shaft shall have octagonal cross section and shall be continuously tapered with single/double longitudinal welding with round Bracket Suitable for installing 1/2Nos 90W LED Street Light as required.Warrenty - 5 years Warrenty should be given by Manufacturer.
125
-
-
... More
supply & Fixing of 90W LED street light fixture having pressure aluminum housing, System lumen output of =10800 lumen by using high power SMD LED's, driver efficiency =90%, power factor=.95,surge protection 10KV ,THD10%, IP rating IP66,IK ating:IK07, heat resistance toughened glass with IK08 impact resistance, graduation disc for precise aiming of flood lights. The pole must withstand the wind speed at 200 km / hr. (Must provide structrural data) with the light fitting. luminaire , efficacy =120 lumen/Watt, correlated color temperature 5700K+-500K, color rendering index=70, lumen maintenance L90 at 50000hrs,THD10%. The luminaire designed to considering maximum uniformity and avarage lux of minimum 25-30 within the poles. Warrenty - 5 years on LED luminaire and Warrenty should be given by Manufacturer.
250
-
-
... More
SITC of foundation including excavation & refilling and secured with holding baseplate,bolts,nuts etc as required Including Side shuttering and grouting of foundation bolts and erection of pole as specified above including watering for curing/ ramrning it as per requirement including provision for passage of cables . 9 mtr Octagonal Poles suitable for wind speed as per IS 875 and = 200 KM/ Hr as per direction of EIC
125
-
-
... More
Supply delivery installation and testing of outdoor panel board made out of 3 mm thick CRCA sheet duly acid treated and painted as required with following accessories and fixing the board.
-
-
-
... More
I/C:- 63 Amps F.P MCB-01 no
O/G: (i) 32 amps 4P MCB-04 nos with Time switch, Contactor for automatic on / off of the lights with automatic on/off day night photo control sensor and suitable arrangements for 3.5 x 35 sq mm cable for entry & 3 phase indicating lamps etc. complete as per the site requirements.
3
-
-
... More
Supply and layng of 40 mm dia HDPE pipe for cable protection and road crossing.(Make:Ashirbad/Precision/sudhakar/Shaakya Polymer/Meil)
3600
-
-
... More
Sundries (Binding Wire, Insulating Tape,socket and cable accessories etc)
1
-
-
... More
Earthing with GI earth pipe 4.5 meter long,40mm dia incluiding accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc with charcoal/coke and salt as required.
6
-
-
... More
Providing and fixing 8 SWG GI wire on surface or in recess for loop earthing along with cables etc as required.
3600
-
-
... More
Providing and fixing 25 mm X 5mm GI strip on surface or in recess for connection etc as required.
200
-
-
... More
Construction of 2no 11/0.4KV, 25KVA S/S for Power supply to the street light.
2
-
-
... More
Plinth Mounted 25kVA, 11/0.4kV Substation. With 11mtr GI Joist Pole DP Structure.
-
-
-
... More
Supply and Erection of 150x150mm GI RS Joist (11Mtr long) (34.6kg/mtr) (SAIL / JINDAL/ TATA make) Including excavation of pole pit in all kind of soil 1/6th Depth of pole Height. Complete in all respect as per the specification and direction of EIC.
4
-
-
... More
Supply, fabrication and installation of 100 x 50 x 6 mm GI Channel (each 2.8 Mtr. Long (9.2kg/mtr.) * 2 no. Complete in all respect as per the specification and direction of EIC.
206.08
-
-
... More
Supply, fabrication and installation of 75 x 40 x 6 mm GI Angle (each 2.8 Mtr. Long 6.8kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC.
152.32
-
-
... More
Supply, fabrication and installation of 50 x 50 x 6 mm GI Angle (each 2.8 Mtr. Long 4.5kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC.
50.4
-
-
... More
SITC of AB Switch (11kV, 200A, 3pole, 50Hz). Complete in all respect as per the specificatioin and direction of EIC.
2
-
-
... More
SITC of H.G.Fuse( 11kV,200A ,3Pole)with P1. Complete in all respect as per the specificatioin and direction of EIC.
2
-
-
... More
SITC of Complete in all respect as per the specification and direction of EIC.
6
-
-
... More
SITC of 40 mm nominal bore GI Pipe ( medium gauge) Earthing Device (3 mtr. Long). Complete in all respect as per the specification and direction of EIC.
10
-
-
... More
SITC of 25 kVA,11/0.4kV (Al) Transformer BIS Energy level-II. Complete in all respect as per the specification and direction of EIC.
2
-
-
... More
SITC of LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 25 kVA S/S. Complete in all respect as per the specification and direction of EIC.
2
-
-
... More
Supply, laying, testing and commissioning of 3.5 Cx 35 mm2 LT PVC Cable(un armoured). Complete in all respect as per the direction and specification of EIC.
30
-
-
... More
SITC of HT stay set(complete). Complete in all respect as per the specification and direction of EIC.
4
-
-
... More
SITC of HT Stay insulator. Complete in all respect as per the specification and direction of EIC.
4
-
-
... More
Supply and installation of HT stay clamp(1.95kg/ pair). Complete in all respect as per the specification and direction of EIC.
4
-
-
... More
Supply and installation of 6/8 SWG Stay wire (10kg/stay). Complete in all respect as per the specification and direction of EIC.
40
-
-
... More
Supply and installation of 25x5 mm GI Flat for earthing. Complete in all respect as per the specification and direction of EIC.
50
-
-
... More
Supply and installation of Aluminium Cable Sockets 35 mm2.Complete in all respect as per the specification and direction of EIC.
20
-
-
... More
Supply and installation of GI Nuts & Bolts of Assorted Size. As per the site requirment complete in all respect.
60
-
-
... More
Supply and installation of all Earthing Materials with construction of earthing chamber including installation of earthing pipe including excavation, soil treatment, with bentonide powder, claculation of earth resistance. Complete in all respect as per the specification and direction of EIC.
10
-
-
... More
Sundries
2
-
-
... More
Civil works for S/S
-
-
-
... More
Material cost for Concreting and Couping of 11 Mtr RS Joist Pole 2.13mtnt 0.40mtrx0.40mtr =0.34 cum (PCC 1:3:6) @6500
4
-
-
... More
Material cost for Concreting of Stay (1.65mtrx0.30mtrx0.30mtr=0.15 cum - PCC 1:3:6)@6500
4
-
-
... More
Supply and installation of Boundary wall with Grill Gate, Metal & sand. As per the Drawing approval of TPNODL and direction of EIC.
2
-
-
... More
Construction of 11kV OH line with 100Sqmm insulated AAA Conductor (Un armourd)=2.0KM
-
-
-
... More
Supply and Erection of 150x150mm GI RS Joist (11Mtr long) (34.6kg/mtr) (SAIL / JINDAL/ TATA make) Including excavation of pole pit in all kind of soil 1/6th Depth of pole Height. Complete in all respect as per the specification and direction of EIC.
48
-
-
... More
Supply and installation of 11kV V-cross arrn(10.2Kg each). Complete in all respect as per the specification and direction of EIC.
38
-
-
... More
Supply and installation of 11kV F- Clamp 2.9 kg Each. Complete in all respect as per the specification and direction of EIC.
38
-
-
... More
Supply and installation of GI Back Clamp for V-cross arm (11kV) ( 0.85 kg each).Complete in all respect as per the specification and direction of EIC.
38
-
-
... More
Supply, installation, testing and commissioning of 11kV Pin Insulator (Polymer). Complete in all respect as per the specification and direction of EIC.
120
-
-
... More
Supply, installation, testing and commissioning of H W fitting(T&C)45KN. Complete in all respect as per the specification and direction of EIC.
60
-
-
... More
Supply, installation, testing and commissioning of Disc insulator (B&S)45 KN polymer. Complete in all respect as per the specification and direction of EIC.
60
-
-
... More
SITC of HT stay set(complete). Complete in all respect as per the specification and direction of EIC.
20
-
-
... More
SITC of HT Stay insulator. Complete in all respect as per the specification and direction of EIC.
20
-
-
... More
Supply and installation of HT stay clamp(1.95kg/ pair). Complete in all respect as per the specification and direction of EIC.
20
-
-
... More
Supply and installation of 7/10 SWG Stay wire (12kg/stay). Complete in all respect as per the specification and direction of EIC.
236
-
-
... More
Supply, paving and stringing of 11kV 1core, 100mm2 XLPE insulated AAA conductor (Unarmoured). Complete in all respect as per the specification and direction of EIC.
4.94
-
-
... More
Supply, fabrication and installation of 100 x 50 x 6 mm GI Channel (each 2.8 Mtr. Long (9.2kg/mtr.) * 2 no. Complete in all respect as per the specification and direction of EIC.
412.16
-
-
... More
Supply, fabrication and installation of 75 x 40 x 6 mm GI Angle (each 2.8 Mtr. Long 6.8kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC.
608.18
-
-
... More
Supply, fabrication and installation of 50 x 50 x 6 mm GI Angle (each 2.8 Mtr. Long 4.5kg/mtr.) with side angle. Complete in all respect as per the specification and direction of EIC.
403.2
-
-
... More
Supply and installation of GI Nuts & Bolts of Assorted Size. As per the site requirment and direction of EIC.
145.67
-
-
... More
SITC of Earthing support (coil type). Complete in all respect as per the specification and direction of EIC.
48
-
-
... More
Supply installation and Commissioining of Anti Climbing Device made of GI barbed wire,Clamping arrangement etc.(2kg Per Support). As per the direction of EIC.
96
-
-
... More
SITC of Road Cross Guarding. Including Pipe earthing on both side of guarding. Complete in all respect as per the specification and direction of EIC.
4
-
-
... More
Supply installation and commissioning of PG clamp for 100 mm2 AAA conductor. Complete in all respect as per the specification and direction of EIC.
60
-
-
... More
Sundries
6
-
-
... More
Civil works for 11Kv Line
-
-
-
... More
Material cost for Concreting and Couping of 11 Mtr RS Joist Pole 2.13mtnt 0.40mtrx0.40mtr =0.34 cum (PCC 1:3:6) @6500
48
-
-
... More
Material cost for Concreting of Stay (1.65mtrx0.30mtrx0.30mtr=0.15 cum - PCC 1:3:6)@6500
20
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements