Odisha Industrial Infrastructure Development Corporation Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 6,13,137Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_IDCO_98564_1Bid Award Id
ViewTender No
PC/EST/E-162/2023-24Tender Authority
Odisha Industrial Infrastructure Development Corporation ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
SITC of Iron Members like a)100x50x6 mm b)75x40x6 mm c)50x50x6 mm equal angle with galvanisation
4396
-
-
SITC of 33 kV V cross Arm (G.I.) along with G.I. Back Clamp for V cross arm (33 KV )
319
-
-
SITC of 33 kV F Clamp.
319
-
-
SITC of 33 kV Fish plate 50x6mm
139
-
-
SITC of Disc Insulator (B & S) 120 kN Polymer
210
-
-
SITC of Hardware Fitting (B & S) 120 kN, 4 bolt
210
-
-
SITC of 33 kV Pin Insulator Polymer
1062
-
-
SITC of HT(33 kV) stay sets for overhead line including excavation & mass concreting of stay pit (ratio 1:3:6- (0.45 m x 0.45m x1.5 m using 4 cm size hard granite metal) , stay binding etc. complete with HT stay insulator, stay clamp & bow, stay plate ,stay rod,7/10 SWG G.I. Stay wire , Grade-2, thimble etc. complete as per technical specification and direction of E.I.C.
204
-
-
Supply & fixing of G.I Nut, Bolt & Washers as required.
759
-
-
Supply & Stringing of 232 mm2 AAAC conductor
55.76
-
-
Supply and Installation of PG Clamp for 232mm2 conductor
210
-
-
SITC of Aluminium Socket 70mm
140
-
-
SITC of GI Pipe Earthing 40 mm Dia medium Gauge 3 mtr Long including masonary work for earth pit, and cement plate cover including salt, Charcoal etc. as per technical specification and direction of E.I.C
70
-
-
Supply and fixing of 25 x 6 & 50x6 GI flat for earthing of different parts as required complete as per technical specification and direction of E.I.C.
1565
-
-
Supply and Installation of Anti-climbing device using GI Barbed wire -2Kg per support
778
-
-
Supply and installation of Danger Board
389
-
-
Construction of new 33 kV OH line with 232 mm sq. AAA conductor and 13 Mtr. Long RS Joist Pole (New junagarh 33kV line to IDCO PSS)-6.5Km
-
-
-
Supply & installation of all reqd. materials for 13 mtr. Long 150 x 150mm RS Joist Pole (34.6 Kg/m) with excavation of pole pit in all kind of soil (of depth 2.2 m) with Base plate , pole padding with 1:3:6 of size (0.7X0.7X0.1m), then erecting the pole and mass concreting of the pit with 1:3:6 of size (0.45x0.45x1.5 m) & coping of size (0.3x0.3x0.45m above GL) with 1:3:6 concrete by using 12mm HBG metal complete with curing as required complete & as per technical specification and direction of E.I.C.
143
-
-
SITC of coil type earthing as per technical specification and direction of E.I.C.
117
-
-
SITC of Iron Members like a)100x50x6 mm b)75x40x6 mm c)50x50x6 mm equal angle with galvanisation
1633
-
-
SITC of 33 kV V cross Arm (G.I.) along with G.I. Back Clamp for V cross arm (33 KV )
117
-
-
SITC of 33 kV F Clamp.
117
-
-
SITC of 33 kV Fish plate 50x6mm
52
-
-
SITC of Disc Insulator (B & S) 120 kN Polymer
78
-
-
SITC of Hardware Fitting (B & S) 120 kN, 4 bolt
78
-
-
SITC of 33 kV Pin Insulator Polymer
390
-
-
SITC of HT(33 kV) stay sets for overhead line including excavation & mass concreting of stay pit (ratio 1:3:6- (0.45 m x 0.45m x1.5 m using 4 cm size hard granite metal) , stay binding etc. complete with HT stay insulator, stay clamp & bow, stay plate ,stay rod,7/10 SWG G.I. Stay wire , Grade-2, thimble etc. complete as per technical specification and direction of E.I.C.
75
-
-
Supply & fixing of G.I Nut, Bolt & Washers as required.
280
-
-
Supply & Stringing of 232 mm2 AAAC conductor
20.48
-
-
Supply and Installation of PG Clamp for 232mm2 conductor
78
-
-
SITC of Aluminium Socket 70mm
52
-
-
SITC of GI Pipe Earthing 40 mm Dia medium Gauge 3 mtr Long including masonary work for earth pit, and cement plate cover including salt, Charcoal etc. as per technical specification and direction of E.I.C
26
-
-
Supply and fixing of 25 x 6 & 50x6 GI flat for earthing of different parts as required complete as per technical specification and direction of E.I.C.
582
-
-
Supply and Installation of Anti-climbing device using GI Barbed wire -2Kg per support
286
-
-
Supply and installation of Danger Board
143
-
-
Construction of 33kV four pole structure with 13m long RS Joist pol-4Nos
-
-
-
Supply & installation of all reqd. materials for 13 mtr. Long 150 x 150mm RS Joist Pole (34.6 Kg/m) with excavation of pole pit in all kind of soil (of depth 2.2 m) with Base plate , pole padding with 1:3:6 of size (0.7X0.7X0.1m), then erecting the pole and mass concreting of the pit with 1:3:6 of size (0.45x0.45x2.1 m) & coping of size (0.3x0.3x0.45m above GL) with 1:3:6 concrete by using 12mm HBG metal complete with curing as required complete & as per technical specification and direction of E.I.C.
16
-
-
SITC of coil type earthing as per technical specification and direction of E.I.C.
16
-
-
SITC of Iron Members like a)100x50x6 mm b)75x40x6 mm c)50x50x6 mm equal angle with galvanisation
2332
-
-
SITC of Disc Insulator (B & S) 120 kN Polymer
48
-
-
SITC of Hardware Fitting (B & S) 120 kN, 4 bolt
3
-
-
SITC of 33 kV Pin Insulator Polymer
3
-
-
SITC of HT(33 kV) stay sets for four pole structure including excavation & mass concreting of stay pit (ratio 1:3:6- (0.45 m x 0.45m x1.5 m using 4 cm size hard granite metal) , stay binding etc. complete with HT stay insulator, stay clamp & bow, stay plate ,stay rod,7/10 SWG G.I. Stay wire , Grade-2, thimble etc. complete as per technical specification and direction of E.I.C.
3
-
-
SITC of GI Pipe Earthing 40 mm Dia medium Gauge 3 mtr Long (01 no Isolator, 1 no. Earth Switch,1 no. for LA) including masonary work for earth pit, and cement plate cover including salt, Charcoal etc. as per technical specification and direction of E.I.C
3
-
-
Supply and fixing of 25 x 6 & 50x6 GI flat for earthing of different parts as required complete as per technical specification and direction of E.I.C.
200
-
-
Supply & fixing of G.I Nut, Bolt & Washers as required.
6
-
-
Supply and installation of Danger Board
6
-
-
Supply and Installation of GI Barbed wire (Anti climbing device @2Kg/support)
30
-
-
Supply and Installation of PG Clamp for 232mm2 conductor
24
-
-
SITC of 33 kV Fish plate 50x6mm
16
-
-
Construction of 33kV DP with isolator with 13m RS Joist Pole-3Nos
-
-
-
Supply & installation of all reqd. materials for 13 mtr. Long 150 x 150mm RS Joist Pole (34.6 Kg/m) with excavation of pole pit in all kind of soil (of depth 2.2 m) with Base plate , pole padding with 1:3:6 of size (0.7X0.7X0.1m), then erecting the pole and mass concreting of the pit with 1:3:6 of size (0.45x0.45x2.1 m) & coping of size (0.3x0.3x0.45m above GL) with 1:3:6 concrete by using 12mm HBG metal complete with curing as required complete & as per technical specification and direction of E.I.C.
6
-
-
SITC of coil type earthing as per technical specification and direction of E.I.C.
6
-
-
SITC of Iron Members like a)100x50x6 mm b)75x40x6 mm c)50x50x6 mm equal angle with galvanisation
716
-
-
SITC of Disc Insulator (B & S) 120 kN Polymer
18
-
-
SITC of Hardware Fitting (B & S) 120 kN, 4 bolt
18
-
-
SITC of 33 kV Pin Insulator Polymer
9
-
-
SITC of 33 kV Isolator 800A
1
-
-
SITC of HT(33 kV) stay sets for four pole structure including excavation & mass concreting of stay pit (ratio 1:3:6- (0.45 m x 0.45m x1.5 m using 4 cm size hard granite metal) , stay binding etc. complete with HT stay insulator, stay clamp & bow, stay plate ,stay rod,7/10 SWG G.I. Stay wire , Grade-2, thimble etc. complete as per technical specification and direction of E.I.C.
20
-
-
SITC of GI Pipe Earthing 40 mm Dia medium Gauge 3 mtr Long (01 no Isolator, 1 no. Earth Switch,1 no. for LA) including masonary work for earth pit, and cement plate cover including salt, Charcoal etc. as per technical specification and direction of E.I.C
9
-
-
Supply and fixing of 25 x 6 & 50x6 GI flat for earthing of different parts as required complete as per technical specification and direction of E.I.C.
176
-
-
Supply & fixing of 7/8 SWG G.I wire for earthing as required.
116
-
-
Supply & fixing of G.I Nut, Bolt & Washers as required.
60
-
-
Supply and installation of Danger Board
6
-
-
Supply and Installation of GI Barbed wire (Anti climbing device @2Kg/support)
12
-
-
Supply and installation of 240 mm aluminium socket
18
-
-
Supply and Installation of PG Clamp for 232mm2 conductor
18
-
-
SITC of 33 kV Fish plate 50x6mm
12
-
-
Construction of 33kV DP for road crossing-5Nos
-
-
-
Supply & installation of all reqd. materials for 13 mtr. Long 150 x 150mm RS Joist Pole (34.6 Kg/m) with excavation of pole pit in all kind of soil (of depth 2.2 m) with Base plate , pole padding with 1:3:6 of size (0.7X0.7X0.1m), then erecting the pole and mass concreting of the pit with 1:3:6 of size (0.45x0.45x2.1 m) & coping of size (0.3x0.3x0.45m above GL) with 1:3:6 concrete by using 12mm HBG metal complete with curing as required complete & as per technical specification and direction of E.I.C.
10
-
-
SITC of coil type earthing as per technical specification and direction of E.I.C.
10
-
-
SITC of Iron Members like a)100x50x6 mm b)75x40x6 mm c)50x50x6 mm equal angle with galvanisation
628
-
-
SITC of Disc Insulator (B & S) 120 kN Polymer
30
-
-
SITC of Hardware Fitting (B & S) 120 kN, 4 bolt
30
-
-
SITC of 33 kV Pin Insulator Polymer
15
-
-
SITC of HT(33 kV) stay sets for four pole structure including excavation & mass concreting of stay pit (ratio 1:3:6- (0.45 m x 0.45m x1.5 m using 4 cm size hard granite metal) , stay binding etc. complete with HT stay insulator, stay clamp & bow, stay plate ,stay rod,7/10 SWG G.I. Stay wire , Grade-2, thimble etc. complete as per technical specification and direction of E.I.C.
20
-
-
SITC of GI Pipe Earthing 40 mm Dia medium Gauge 3 mtr Long (01 no Isolator, 1 no. Earth Switch,1 no. for LA) including masonary work for earth pit, and cement plate cover including salt, Charcoal etc. as per technical specification and direction of E.I.C
10
-
-
Supply and fixing of 25 x 6 & 50x6 GI flat for earthing of different parts as required complete as per technical specification and direction of E.I.C.
219
-
-
Supply & fixing of G.I Nut, Bolt & Washers as required.
50
-
-
Supply and installation of Danger Board
10
-
-
Supply and Installation of GI Barbed wire (Anti climbing device @2Kg/support)
20
-
-
Supply and Installation of PG Clamp for 232mm2 conductor
30
-
-
SITC of 33 kV Fish plate 50x6mm
20
-
-
Supply, delivery, fabrication,erection of 100 x 50 x 6 mm MS Channel as required for guarding complete with galvanization & fixing of G.I back clamp,I Hook, No.8 & No.10 G.I. Wire as long lacing & cross lacing.
5
-
-
Construction of 33kV Railway crossing with UG Cable-2Nos
-
-
-
Supply & installation of all reqd. materials for 13 mtr. Long 150 x 150mm RS Joist Pole (34.6 Kg/m) with excavation of pole pit in all kind of soil (of depth 2.2 m) with Base plate , pole padding with 1:3:6 of size (0.7X0.7X0.1m), then erecting the pole and mass concreting of the pit with 1:3:6 of size (0.45x0.45x2.1 m) & coping of size (0.3x0.3x0.45m above GL) with 1:3:6 concrete by using 12mm HBG metal complete with curing as required complete & as per technical specification and direction of E.I.C.
8
-
-
SITC of coil type earthing as per technical specification and direction of E.I.C.
8
-
-
Supply, installation, testing & laying of 3C x 400 mm² 33kV XLPE Cable (Armoured), A2XFY
200
-
-
Construction of trenchless ducts for laying of 33kV Cable with 200mm dia HDPE pipe casing using HDD machine including supply of HDPE pipe as per IS 4984, PN4 class PE80 complete & as per technical specification and direction of E.I.C.
420
-
-
Supply, installation, testing & commissioning of Heat shrinkable jointing kit for 3Cx400 mm² 33KV XLPE Cable(outdoor type)
8
-
-
SITC of Iron Members like a)100x50x6 mm b)75x40x6 mm c)50x50x6 mm equal angle with galvanisation
670
-
-
SITC of Disc Insulator (B & S) 120 kN Polymer
12
-
-
SITC of Hardware Fitting (B & S) 120 kN, 4 bolt
12
-
-
SITC of 33 kV Pin Insulator Polymer
12
-
-
SITC of HT(33 kV) stay sets for four pole structure including excavation & mass concreting of stay pit (ratio 1:3:6- (0.45 m x 0.45m x1.5 m using 4 cm size hard granite metal) , stay binding etc. complete with HT stay insulator, stay clamp & bow, stay plate ,stay rod,7/10 SWG G.I. Stay wire , Grade-2, thimble etc. complete as per technical specification and direction of E.I.C.
16
-
-
SITC of GI Pipe Earthing 40 mm Dia medium Gauge 3 mtr Long (01 no Isolator, 1 no. Earth Switch,1 no. for LA) including masonary work for earth pit, and cement plate cover including salt, Charcoal etc. as per technical specification and direction of E.I.C
6
-
-
Supply and fixing of 25 x 6 & 50x6 GI flat for earthing of different parts as required complete as per technical specification and direction of E.I.C.
348
-
-
Supply & fixing of G.I Nut, Bolt & Washers as required.
40
-
-
Supply and installation of Danger Board
8
-
-
Supply and Installation of GI Barbed wire (Anti climbing device @2Kg/support)
16
-
-
Supply and Installation of PG Clamp for 232mm2 conductor
12
-
-
SITC of 33 kV Fish plate 50x6mm
16
-
-
SITC of 33 kV GI Riser
36
-
-
SITC of 33 kV HDPE Pipe 200mm dia as per IS 4984, PN4 class PE80 complete & as per technical specification and direction of E.I.C.
280
-
-
SITC of Red Oxide paint as required and as per the direction of EIC. (Rate taken from approved estimate of 33kV feeder at Reuna vide Letter No-20032 Dt.28/06/23 of G.M.Electrical)
300
-
-
SITC of Aluminium paint as required and as per the direction of EIC.(Rate taken from approved estimate of 33kV feeder at Reuna vide Letter No-20032 Dt.28/06/23 of G.M.Electrical)
300
-
-
SITC of Black paint as required and as per the direction of EIC.(Rate taken from approved estimate of 33kV feeder at Reuna vide Letter No-20032 Dt.28/06/23 of G.M.Electrical)
90
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements