Odisha Industrial Infrastructure Development Corporation Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Industrial Infrastructure Development Corporation - IDCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date18 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 49,74,987 
Notes
Download

Costs

Summary

A. Shifting Of 500kva 11 0.4kv Plinth Mounted Ss B. Const. Of Dp With Ab Switch C. Const. Of 11kv Ug Line With 4way Rmu D. Const. Of Lt Line E. Const. Of 11kv Ug Line F. Dismantling Work Image Campus Siripur Bbsr

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply, installation, testing & commissioning of Top Channel GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg)

57.35

96

5554.46

... More
Supply, installation, testing & commissioning of Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)(GI)

3.96

124

492.63

... More
Supply, installation, testing & commissioning of AB Switch Mounting Channel 75x40x4.8 mm GI Channel 7.14Kg./Mtr., each channel length 3 mtr 2 No's.channel require(Each 2x 3x 7.14= 42.84 Kg)

42.84

96

4149.14

... More
SITC of AB Switch Side Support Channel 100X50X 6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35)

6.69

96

648.13

... More
Supply, installation, testing & commissioning of channel support for down pipe 75x 40x 4.8 mm , 7.14 kg/mtr each channel length 0.8 mtr , 1 nos channel required= (7.14x0.8x1)

5.71

96

553.22

... More
Supply, installation, testing & commissioning of Double Pole Belting Channel 75X40X 4,8mm., 7,14KG/Mtr., each channel length 3 Mtr., 4nos channel required =( 7,14x3 x 4)

85.68

96

8298.27

... More
Supply, installation, testing & commissioning of 50x50x6mm.GI Bracing Angle, 4.5Kg,/mtr each angle length 3.512 mtr. 4nos angle required . (4.5x3.512x 4)

63.22

96

6122.59

... More
Supply, installation, testing & commissioning of Danger Plate, 2 no's.

2

132

265.06

... More
Supply, installation, testing & commissioning of Back Clamp for danger plate 25 x 3 mm. flat, 0.59Kg/ Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

124

74.77

... More
Supply, installation, testing & commissioning of HT stay Clamp , 50x8mm flat, 3.14kg/mtr, 0.551mtr length , 2 no's qty required (1pair)

2

186

373.6

... More
Supply, installation, testing & commissioning of HT stay set complete

2

1569

3138.22

... More
Supply, installation, testing & commissioning of HT stay insulator TYPE-C

2

74

149.44

... More
Supply, installation, testing & commissioning of 7/10 SWG stay wire (15Kg./ Set)

30

112

3362.38

... More
Supply, installation, testing & commissioning of GI pipe earthing 40 mm , 3 mtr .Long

2

1569

3138.22

... More
Supply, installation, testing & commissioning,2.36kg/mtr.(12.5mtr. For L.A ,3Mtr for AB switch Body, For mesh formation and 2.5 mtr. For raising)=20.5x2.36

48.38

124

6011.26

... More
Supply, installation, testing & commissioning of GI Barbed wire/Anticlimbing device (3kg per support, 2 no's qty required=(2x3kg)

6

132

795.21

... More
SITC of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

124

299.09

... More
Supply, installation, testing & commissioning of Lightning Arrester(12KV,10KA) Station Class 2

3

5881

17643.63

... More
Supply, installation, testing & commissioning of AB Switch(11KV,400A.3pole,50Hz)

1

19631

19631.63

... More
Supply, installation, testing & commissioning of 11KV pin insulator polymer

3

331

994.02

... More
Supply, installation, testing & commissioning of H W fitting (B&S)70KN(3bolted)

6

579

3479.04

... More
Supply, installation, testing & commissioning of Disc insulator (B&S)70 KN polymer

6

1905

11431.08

... More
Supply, installation, testing & commissioning of PG Clamp for 55sq.mm AAA conductor

6

795

4771.26

... More
Supply, installation, testing & commissioning of GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch .

13.72

129

1772.64

... More
Supply & Installation of Black Paint

1

364

364.47

... More
Supply & Installation Yellow Colour Paint for Background

2

275

550.52

... More
CIVIL & SERVICES.

-

-

-

... More
Fixing of complete 11kv line complete stay set includes 1) Turn Buckle Assembly 2) Stay rod and Stay plate 3) Stay insulator 4) Stay wire. 5) Stay clamps with nuts & bolts BA will done the excvation including excvation. supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard

2

2272

4545

... More
Concreting ratio 1:1.5:3 (500mm X 500mm X 1800mm) = 0.450Cu.mtr

0.9

6565

5908.5

... More
Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr

0.23

6565

1509.95

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

3737

3737

... More
Part-B

-

-

-

... More
11KV 3C, 400sqmm UG Cable along with 11 KV RMU

-

-

-

... More
Supply of materials for 11kV, 3Core, 400sqmm,Al, XLPE insulation armoured UG cable with accessories

-

-

-

... More
Length of 11kv3C, 400sqmm cable(open trench)

-

-

-

... More
Length of 11kv 3C,400sqmm cable(HOD)

-

-

-

... More
Supply of 11kV, 3Core, 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7KA and SC rating of Armour in kA- 15kA)

700

2241

1569110.31

... More
Supply of straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, Aluminium UG cable for 3Core

2

37833

75667

... More
Supply of indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core (set)

2

14319

28638.5

... More
Supply of outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core (set)

2

20778

41556.02

... More
Supply of HDPE PE 80-PN8 pipe of 160mm diameter (for 400sqmm HT cable laying)

684

891

609681.17

... More
Supply of 11kv RMU

-

-

-

... More
No. of 11 kv 3 Way RMU (LLV)

-

-

-

... More
No. of 11 kv 4 Way RMU (LLVV)

-

-

-

... More
No. of 11 kv 3 Way RMU (LLV+M)

-

-

-

... More
No. of 11 kv 4 Way RMU (LLVV+M)

-

-

-

... More
Supply of 11KV RMU 4 Way , 2 Iso & 2 Brk 630A LLVV

1

802023

802023.53

... More
Earthing

-

-

-

... More
Supply, installation, testing & commissioning Earthing Conductor :50x6mm(2.4Kg./Mtr.)GI Flat for Equipment ,Structure etc.)

13.2

124

1640.1

... More
Supply of Pipe earthing 40mm GI Pipe

2

1569

3138.22

... More
Erection Portion

-

-

-

... More
Laying, Commissioning, Testing of 11kV, 3core,400 sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method

-

-

-

... More
Laying, Commissioning, Testing of 11kV, 3core, 400sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method.

699.96

95

66811.51

... More
Erection of straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, Aluminium UG cable kits for 3Core (set)

2

2424

4848

... More
Erection of indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, Aluminium UG cable kits for 3Core (set)

2

1919

3839.62

... More
Erection of outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, Aluminium UG cable kits for 3Core (set)

2

1919

3839.62

... More
Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench.

684

303

207252

... More
Erection,commissioning,wiring and Testing of 11KV RMU

-

-

-

... More
Erection of 11kv RMU 4 WAY ,2 Iso & 2brk 630A(LLVV)

1

9735

9735.39

... More
CIVIL & SERVICES.

-

-

-

... More
Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench

-

-

-

... More
Earth work excavation of soil (1 mtr width x 1 mtr depth) Route Length

-

-

-

... More
Earth work excavation of soil

239.4

707

169255.8

... More
Earth work excavation of hard rock

102.6

1737

178236.72

... More
Back filling with excavated soil outside and above the trench

342

204

69774.84

... More
Civil works for Prefabricated RCC Foundation with supply of all materials

-

-

-

... More
Prefabricated RCC foundation of 11kv RMU

1

23376

23376.75

... More
Supply of GI Fencing with gate around each RMU

20

3636

72720

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

2

3737

7474

... More
Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.)

16

1478

23648.63

... More
Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works

12

1022

12265.44

... More
Part-C

-

-

-

... More
LT AB Cable Line Length with 33 mtr, Span using 4C x 95 mm2 (P) + 1C x 95 mm2 (M) + 1 C x 16 mm2 (Street Light)

-

-

-

... More
Supply, installation, testing & commissioning of 9 Mtr long 300 Kg PSC Pole

3

5375

16127.25

... More
Supply, installation, testing & commissioning of LT Stay set Complete

1

777

777.08

... More
Supply, installation, testing & commissioning of 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)

12

112

1344.96

... More
Supply, installation, testing & commissioning of LT Stay Clamp(1.40Kg/pair)

1

164

164.38

... More
Supply, installation, testing & commissioning of LT Stay insulator

1

44

44.83

... More
Supply, installation, testing & commissioning of LT Accessories with Eye hook and Clamp

-

-

-

... More
Supply, installation, testing & commissioning of Pole clamp for EYE hook for (XLPE Aerial bunched cable)

4

331

1325.36

... More
Supply, installation, testing & commissioning of EYE hook for XLPE Aerial bunched cable

2

99

198.8

... More
Supply, installation, testing & commissioning of Dead End Clamp suitable for messenger XLPE Aerial bunched cable

2

107

215.37

... More
Supply, installation, testing & commissioning of Suspension clamp with EYE hook for ABC

2

563

1126.54

... More
Supply, installation, testing & commissioning of 4C x 95 mm2 (P) + 1C x 95 mm2 (M) + 1C x 16 mm2 (Street Light) (LT AB Cable)

105

469

49327.23

... More
Supply, installation, testing & commissioning of Insulated piercing connector Type A main 50 to 150 sqmm & Tap -50 to 150 sqmm

2

144

288.22

... More
Supply, installation, testing & commissioning of GI pipe earthing ( each 5th pole earth)

1

1569

1569.11

... More
Supply, installation, testing & commissioning of Coil Earthing

2

275

550.02

... More
Supply, installation, testing & commissioning of No. 8 GI wire (Dia 4.6 mm) 0.131 KG/Mtr 2 Mtr for Connecting pole with coil earthing

0.8

124

99.4

... More
Supply, installation, testing & commissioning of Danger plate LT

3

132

397.59

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/ Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.9

124

111.83

... More
GI Barbed wire/Anticlimbing device (3Kg per support)

9

132

1192.8

... More
Supply, installation, testing & commissioning of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

3.61

124

448.54

... More
Supply, installation, testing & commissioning of GI Nut, Bolt & washer of different sizes (0.5 Kg/Pole)

1.5

129

193.83

... More
Supply & Installation Black Paint

3

364

1093.41

... More
Supply & Installation Yellow Colour Paint for Background

6

275

1651.59

... More
CIVIL WORK

-

-

-

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay Plate 3) Stay Insulator 4) Stay Clamps with Nuts & bolts, including excavation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mm x 500mm x 800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500x500x1500mm)

1

2272

2272.5

... More
Concreting ratio 1:1.5:3 (500mm X 500mm X 1500mm) = 0.375Cu.mtr

1.13

6565

7418.45

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

3737

3737

... More
PART-D

-

-

-

... More
Shifting of 500 KVA, 11/0.4 KV Plinth Mounted S.S with WPB Pole

-

-

-

... More
WPB pole160X152(11MTR,lomg,30.44kg /mtr

2

36256

72512.4

... More
9 Mtr long 300 Kg PSC Pole (For Raising of LT ABC)

1

5375

5375.75

... More
Pole clamp for EYE hook for (XLPE Aerial bunched cable)

2

331

662.68

... More
EYE hook for XLPE Aerial bunched cable

2

99

198.8

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched cable

2

107

215.37

... More
Top Channel GI 100 x 50 x 6mm,(3000mm long) 9.56 KG/Mtr,2 no's ) (Each 2x3.000x2 x 9.56 =57.36kg)

57.36

96

5555.43

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)

3.96

124

492.63

... More
Double Pole Belting Channel 75x40xx4.8 mm,7.14 KG/Mtr, each channel length 3.0 Mtr, 2 no's channel required=(7.14x3x2)

42.84

96

4149.15

... More
50x650x6mm GI Bracing Angle, 4.5 Kg/Mtr. Each abgle length 3.512 Mtr., 2 nos angle reequired= (4.5x3.512x2)

31.61

96

3061.31

... More
MU Channel GI 75 X 40 X 4.8mm., (3000 mm long) (7.14KG/ Mtr., 2 nos), (Each 2X3.000X7.14=42.84 Kg)

42.84

96

4149.13

... More
AB Switch mounting channel 75x40x4.80mm, 7.14kg/mtr each channel length 3 mtr 2 nos channel required=( 7.14x3x2=42.84kg)

42.84

96

4149.13

... More
AB Switch side support channel 100 x 50 x 6mm, 9.56 KG/Mtr, each channel length 0.35 mtr., 2 no's channel required =( 9.56 x 2 x 0.35)

6.69

96

647.94

... More
channel support for down pipe 75x 40x 4.8 mm , 7.14 kg/mtr each channel length 0.8 mtr , 1 nos channel required= (7.14x0.8x1)

5.71

96

553.02

... More
HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg)

42.84

96

4149.05

... More
Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg)

11.57

96

1120.59

... More
Cantilever Support Angle 50x50x6MM GI (1282 mm long) (4.5Kg./Mtr, 2Nos) (Each 2x1.282x4.5= 11.54Kg)

11.54

96

1117.67

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr, for Mesh formation,12 mtr for LA, and 2.5 mtr for raising , 11mtr for AB Switch , 2.8mtr for HG Fuse,5x2 mtr for DTR Nutral,(1.3+4.5)mtr. For DTR Body,0.500mtr for LTDB& AB Switch operating handle , 3 mtr for fencing)(Each 65.6x2.36=154.81kg),

154.82

124

19236.52

... More
55mm2 All alloy AluminiumConductor(AAAC)-PVC insulated(50mtr Each Dtr)

50

70

3519.8

... More
AB Switch(11KV,200A.3pole,50Hz)

1

12176

12176.58

... More
H.G.Fuse( 11KV.200A.3Pole)

1

10138

10138.87

... More
PG Clamp for 55 sq.mm AAA conductor

6

795

4771.26

... More
Disc insulator (B&S)70 KN polymer

3

1905

5715.54

... More
H W fitting (B&S)70KN(3bolted)

3

579

1739.52

... More
Lightning Arrester(12KV,10KA) Station Class 2

3

5881

17643.63

... More
11KV pin insulator polymer

3

331

994.02

... More
HT stay set complete

2

1569

3138.22

... More
HT stay Clamp (1.9Kg/pair)

2

186

373.6

... More
HT stay insulator TYPE-C

2

74

149.44

... More
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)

30

112

3362.4

... More
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long

7

1569

10983.77

... More
GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP)

25

129

3230.5

... More
GI Barbed wire/Anticlimbing device (3Kg /Pole)

6

132

795.21

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

124

299.07

... More
Danger plate 11kv

2

132

265.06

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/ Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

124

74.8

... More
name plate

1

132

132.53

... More
Structure Numbering and Marking

-

-

-

... More
Yellow Colour Paint for Background

2

275

550.55

... More
Black Colour Paint for numbering

1

364

364.47

... More
CIVIL WORK

-

-

-

... More
Concreting ratio 1:1.5:3 (500mm X 500mm X 1800mm) = 0.450Cu.mtr (for WPB Pole)

0.9

6565

5908.5

... More
Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr

0.23

6565

1483.69

... More
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay insulator.

2

2272

4545

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

7

3737

26159

... More
LTDB Plinth

1

3030

3030

... More
DTR Plinth upto 1000 KVA

1

30663

30663.6

... More
Laying of 1C X 400 mm2 LT XLPE Cable

180

72

13089.6

... More
Supply and Erection of GI Fencing with Gate

20

3636

72720

... More
Concreting ratio 1:1.5:3 (500mm X 500mm X 1500mm) = 0.375Cu.mtr (for PSC Pole)

0.38

6565

2461.88

... More
PART-E

-

-

-

... More
supplying & laying of 11kv 3C,95sqmm UG Cable along with 11 KV RMU

-

-

-

... More
Supply of materials for 11kV, 3Core, 95sqmm, XLPE insulation armoured UG cable with accessories

-

-

-

... More
Length of 11kv 3C, 95sqmm cable(open trench)

-

-

-

... More
Length of 11kv 3C, 95sqmm cable(HOD)

-

-

-

... More
Supply of 11kV, 3Core,95sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 9KA and SC rating of Armour in kA- 9kA)

80

853

68263.74

... More
Supply of Indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,95sqmm, HT UG cable for 3Core (Set)

4

10619

42476.56

... More
Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,95sqmm, HT UG cable for 3Core (Set)

4

16362

65448.36

... More
Supply of HDPE PE 80-PN8 pipe of 110mm diameter (for 95sqmm HT cable laying)

48

411

19731.44

... More
Erection Portion

-

-

-

... More
Laying, Commissioning, Testing of 11kV, 3core,95 sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method

-

-

-

... More
Laying, Commissioning, Testing of 11kV, 3core,95sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method.

80

95

7635.6

... More
Erection of Indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,95sqmm, Aluminium UG cable for 3Core (Set)

2

1919

3839.62

... More
Erection of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,95sqmm, Aluminium UG cable for 3Core (Set)

2

1919

3839.62

... More
Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench.

48

303

14544

... More
Civil Works

-

-

-

... More
Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench

-

-

-

... More
Earth work excavation of soil (1mtr. Width x 1 mtr. Depth)

-

-

-

... More
Earth work excavation of soil

16.8

707

11877.6

... More
Earth work excavation of hard rock

7.2

1737

12507.84

... More
Back filling with excavated soil outside and above the trench

24

204

4896.48

... More
Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.)

32

1478

47297.11

... More
Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works

1

1022

1022.12

... More
PART-F

-

-

-

... More
Dismantling Work

-

-

-

... More
Dismantling of 100KVA, 11/0.4KV DTR

1

3295

3295.27

... More
Dismantling of LTDB for 100KVA, 11/0.4KV DTR

1

555

555.5

... More
Dismantling of 500KVA, 11/0.4KV DTR

1

9298

9298.16

... More
Dismantling of LTDB for 500KVA, 11/0.4KV DTR

1

555

555.5

... More
Dismantling of channel

600.07

8

4908.6

... More
Dismantling of 11KV GI Pin Insulator

6

8

50.24

... More
Dismantling of 11KV Disc insulator

6

8

50.24

... More
Dismantling of LA

6

163

982.46

... More
Dismantling of Danger Board

4

13

54

... More
Dismantling of AB Switch

2

1212

2424

... More
Dismantling of HG/DO Fuse

2

1212

2424

... More
Dismantling of LT line

300

23

6975.06

... More
Dismantling of 11KV line

400.09

9

3720.84



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.