Odisha Industrial Infrastructure Development Corporation Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Industrial Infrastructure Development Corporation - IDCO Tender

Works
Electrical Cables And Wires
Electrical and Electronics
Eprocure
Opening Date2 Aug 2024
Closing Date9 Aug 2024
Tender Amount₹ 91,39,781 
Notes
Download

Costs

Summary

Construction Of 11kv Line Using 1cx630 Sqmm 3cx400 Sqmm 3cx95 Sqmm 11kv Xlpe Ug Cable With Rmu Arrangement And 11kv Dp Structure With Ab Switch And La Using Wpb Gi Pole For Ht Metering Unit For Power Supply To Kalinga Studio Bhubaneswar

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of materials for 11kV, 1Core, 630sqmm,Al, XLPE insulation armoured UG cable with accessories

-

-

-

... More
11kv 1C, 630sqmm cable(open trench): 50 mtr

-

-

-

... More
Supply of 11kV, 1Core, 630sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7KA and SC rating of Armour in kA- 15kA)

200

220250

1101.25

... More
Supply of indoor termination kits Heat Shrinkable type suitable for 11kV, 1Core,630sqmm, HT UG cable for 1Core

8

46110

5763.75

... More
Supply of materials for High Density Polyethylene (HDPE)Pipe pipe of 110mm diamete ,PE 80-PN8 (for 11kv U/G cable laying)

200

178270

891.35

... More
Laying, Commissioning, Testing of 11kV, 1core,630 sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method

-

-

-

... More
Laying, Commissioning, Testing of 11kV, 1core,630sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method.

50

4772

95.45

... More
Erection of indoor termination kits Heat Shrinkable type suitable for 11kV, 1Core, 630sqmm, aluminium UG cable kits for 3core (set)

8

15358

1919.81

... More
Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench.

200

60600

303

... More
Dismantling of existing 3C X 400 cables of PHD Feeder

50

1550

31

... More
PART-B

-

-

-

... More
Construction of 0.75KM of 11KV 3Core,400sqmm UG cable line Along with installation of 1No of 3-way -111kv- RMU

-

-

-

... More
Supply of materials for 11kV, 3Core, 400sqmm,Al, XLPE insulation armoured UG cable with accessories

-

-

-

... More
Length of 11kv3C, 400sqmm cable(open trench): 550 mtr

-

-

-

... More
Length of 11kv 3C,400sqmm cable(HDD): 200 mtr

-

-

-

... More
Supply of 11kV, 3Core, 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7KA and SC rating of Armour in kA- 15kA)

750

1952767

2603.69

... More
Supply of straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core

2

75667

37833.5

... More
Supply of indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core

5

71596

14319.25

... More
Supply of outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core

2

41556

20778.01

... More
Supply of HDPE PE 80-PN8 pipe of 160mm diameter (for 400sqmm HT cable laying)

534

475980

891.35

... More
Supply of 11kv RMU

-

-

-

... More
Supply of RMU 11KV 3 WAY 630A LLV(2ISO+1BKR)+AUXPT (at customer premises)

1

614999

614999.35

... More
Supply of 11KV RMU 11KV 4 WAY 630A LLVV(2ISO+2BKR)-RMU+FRTU+AUX PT(At customer premises PSS

1

1076313

1076313.06

... More
Earthing

-

-

-

... More
Earthing Conductor :50x6mm(2.4Kg./Mtr.)GI Flat for Equipment ,Structure etc.)

26.4

3280

124.25

... More
Pipe earthing 40mm GI Pipe

4

6276

1569.11

... More
Laying, Commissioning, Testing of 11kV, 3core,400 sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method

-

-

-

... More
Laying, Commissioning, Testing of 11kV, 3core, 400sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method.

550

52497

95.45

... More
Erection of straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core

2

4848

2424

... More
Erection of indoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core

5

9599

1919.81

... More
Erection of outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,400sqmm, HT UG cable for 3Core

2

3839

1919.81

... More
Installation,Laying, Commissioning, Testing of 11kV, 3core, 400sqmm, XLPE UG cable by HDD method.with HDPE Pipe (1600mm dia,PN8 PE80) including supply of HDPE Pipe

200

565600

2828

... More
Laying of 160mm dia PE 80-PN8, HDPE pipe inside open trench.

534

161802

303

... More
Erection,commissioning,wiring and Testing of 11KV RMU

-

-

-

... More
Erection of 11kv RMU 3 WAY ,2 Iso & 1brk 630A(LLV)

1

9735

9735.39

... More
Erection of 11kv RMU 4 WAY ,2 Iso & 2brk 630A(LLVV)

1

9735

9735.39

... More
Civil Work

-

-

-

... More
Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench

-

-

-

... More
Earth work excavation of soil

373.8

264276

707

... More
Earth work excavation of hard rock

160.2

278299

1737.2

... More
Back filling with excavated soil outside and above the trench

534

108946

204.02

... More
Damage of asphalt/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench (1mtr. width)

350

934538

2670.11

... More
Civil works for Prefabricated RCC Foundation with supply of all materials

-

-

-

... More
Prefabricated RCC foundation of 11kv RMU

2

46753

23376.75

... More
Supply of GI Fencing with gate around each RMU

20

72720

3636

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

4

14948

3737

... More
Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.)

16

23648

1478.03

... More
Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works

25

25553

1022.12

... More
PART-C

-

-

-

... More
Construction of 0.15KM of 11KV 3Core,95sqmm UG cable line (with spare cable)

-

-

-

... More
Supply of materials for 11kV, 3Core, 95sqmm, XLPE insulation armoured UG cable with accessories

-

-

-

... More
Length of 11kv 3C, 95sqmm cable(open trench): 150 mtr

-

-

-

... More
Supply of 11kV, 3Core,95sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 9KA and SC rating of Armour in kA- 9kA)

300

351411

1171.37

... More
Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core,95sqmm, HT UG cable for 3Core (Set)

4

65448

16362.09

... More
Supply of HDPE PE 80-PN8 pipe of 110mm diameter (for 95sqmm HT cable laying)

268

110166

411.07

... More
Laying, Commissioning, Testing of 11kV, 3core,95 sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method and HDD method

-

-

-

... More
Laying, Commissioning, Testing of 11kV, 3core,95sqmm, aluminium, XLPE insulation armoured (extruded type) UG cable by open trench method.

300

28635

95.45

... More
Erection of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 95sqmm, aluminium UG cable kits for 3core (set)

4

7679

1919.81

... More
Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench.

268

81204

303

... More
Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench

-

-

-

... More
Earth work excavation of soil

93.8

66316

707

... More
Earth work excavation of hard rock

40.2

69835

1737.2

... More
Back filling with excavated soil outside and above the trench

134

27338

204.02

... More
Damage of asphalt/tar road and other utilities and reconstructing to bring to its original shape after laying of cable in open trench (1mtr. width)

50

133505

2670.11

... More
Civil works for Prefabricated RCC Foundation with supply of all materials

-

-

-

... More
Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.)

32

47296

1478.03

... More
Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works

5

5110

1022.12

... More
Part-D

-

-

-

... More
Construction of 11KV DP with AB switch & LA using WPB GI Pole for HT metering unit

-

-

-

... More
SITC of following:

-

-

-

... More
Supply & installation of WPB 160x152 (11Mtr. Long, 30.44KG/Mtr.)(GI)

2

72512

36256.2

... More
Supply,& fixing of Top Channel GI 100 X 50 X 6 MM each channel length 3mtr,2nos channel required=(2x9.56x3)

57.36

7126

124.25

... More
Supply,& fixing of Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)(GI)

3.97

492

124.25

... More
Supply,& fixing of AB Switch Mounting Channel 75x40x4.8 mm (7.14Kg./Mtr.each channel length 3Mtr,2 nos channel required= 2x 3x 7.14)

42.84

5322

124.25

... More
Supply,& fixing of HT MU Mounting channel 100x50x6mm, 9.56kg/mtr,each channel length 3mtr,2 nos channel required= (9.56x3x2)

57.36

7126

124.25

... More
Supply,& fixing of Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14)

11.57

1437

124.25

... More
Supply,& fixing of Angle for cantilever arrangement for HT MU 50X50X6-1282mm each 2 nos (4.5kg per mtr)

11.54

1433

124.25

... More
Supply,& fixing of MU & AB Switch side support channel 100x50x6mm,9.56 KG/Mtr, each channel length 0.35mtr,4nos channel required=(9.56x4x0.35)

13.38

1662

124.25

... More
Supply,& fixing of Channel Support for down Pipe 75 X 40 X 4.8mm., 7.14KG/ Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1)(GI)

5.71

709

124.25

... More
Supply,& fixing of Double Pole bracing channel 75x40x4.8mm., 7.14KG/ Mtr., each channel length3 Mtr.,2 no's channel required =( 7.14x3x2)(GI)

42.84

5322

124.25

... More
Supply,& fixing of 50x50x6mm.GI Bracing Angle, 4.5Kg,/mtr each angle length 3.512 mtr. 2nos angle required . (4.5x3.512x 2)

31.61

3927

124.25

... More
Supply,& fixing of Danger plate 2nos

2

265

132.53

... More
Supply,& fixing of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/ Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

74

124.25

... More
Supply,& fixing of 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated for jumpering

15

1056

70.4

... More
Supply,& fixing of HT stay Clamp ,50x8 mm flat ,3.14kg/mtr,0.551mtr. Length, 2nos qty required(1pair)

2

373

186.8

... More
Supply,& fixing of HT stay set complete

2

3138

1569.11

... More
Supply,& fixing of HT stay insulator TYPE-C

2

149

74.72

... More
Supply,& fixing of 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)

30

3362

112.08

... More
Supply,& fixing of 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long

2

3138

1569.11

... More
Supply,& fixing of 50x6mm GI Flat for earthing ,2.36kg/mtr.(12.5mtr. For L.A ,3Mtr for AB switch Body, For mesh formation and 2.5 mtr. For raising)=20.5x2.36

48.38

6011

124.25

... More
Supply,& fixing of GI Barbed wire/Anticlimbing device (3Kg / support, 2nos qtyrequired=2x3kg

6

795

132.53

... More
Supply,& fixing of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

299

124.25

... More
Supply,& fixing of Lightning Arrester(12KV,10KA) Station Class 2

3

17643

5881.21

... More
Supply,& fixing of AB Switch(11KV,200A.3pole,50Hz)

1

12176

12176.58

... More
Supply,& fixing of GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP)

13.72

1772

129.22

... More
Supply,& making of Black Colour Paint for numbering

1

364

364.47

... More
Supply,& making of Yellow Colour Paint for Background

2

550

275.26

... More
Civil Work

-

-

-

... More
Fixing of complete 11kv line complete stay set includes 1) Turn Buckle Assembly 2) Stay rod and Stay plate 3) Stay insulator 4) Stay wire. 5) Stay clamps with nuts & bolts BA will done the excvation including excvation. supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard

2

4545

2272.5

... More
Concreting ratio 1:1.5:3 (500mm X 500mm X 1800mm) = 0.450Cu.mtr

0.9

5908

6565

... More
Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.1125Cu.mtr

0.23

1477

6565

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

2

7474

3737

... More
Supply and erection of GI Fencing Gate

20

72720

3636

... More
Part-E

-

-

-

... More
Construction of 11KV Line

-

-

-

... More
1) 0.01ckm of 11kv line using 55sqmm-AAA conductor 2) 0.02ckm of 11kv line using 100sqmm-AAA conductor & 3) 2no of DP with isolator arrangement for cable termination

-

-

-

... More
DP required with AB Switch

-

-

-

... More
SITC of following:

-

-

-

... More
Supply & installation of WPB 160x152 (11Mtr. Long, 30.44KG/Mtr.)(GI)

4

145024

36256.2

... More
Supply,& fixing of Top Channel GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg)

114.72

14253

124.25

... More
Supply,& fixing of Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)(GI)

7.93

985

124.25

... More
Supply,& fixing of AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long) (7.14Kg./Mtr., 2 No's.) (Each 2x 3.000x 7.14= 42.84 Kg)

85.68

10645

124.25

... More
Supply,& fixing of AB Switch Side Support Channel 100X50X 6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35)(GI)

13.38

1662

124.25

... More
Supply,& fixing of Channel Support for down Pipe 75 X 40 X 4.8mm., 7.14KG/ Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1)(GI)

11.42

1419

124.25

... More
Supply,& fixing of Double Pole Belting Channel 75X40X 4,8mm., 7,14KG/Mtr., each channel length 3 Mtr., 2 nos channel required =( 7,14x3 x 4)

171.36

21291

124.25

... More
Supply,& fixing of 50x50x6mm.GI Bracing Angle, 4.5Kg,/mtr each angle length 3.512 mtr. 4nos angle required . (4.5x3.512x 4)

126.43

15709

124.25

... More
Supply,& fixing of Danger Plate, 2 no's.

4

530

132.53

... More
Supply,& fixing of Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/ Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

1.2

149

124.25

... More
Supply,& fixing of HT stay Clamp , 50x8mm flat, 3.14kg/mtr, 0.551mtr length , 2 no's qty required (1pair)

4

747

186.8

... More
Supply,& fixing of HT stay set complete

4

6276

1569.11

... More
Supply,& fixing of HT stay insulator TYPE-C

4

298

74.72

... More
Supply,& fixing of 7/10 SWG stay wire (15Kg./ Set)

60

6724

112.08

... More
Supply,& installation of 40 mm GI pipe earthing device with 3 mtr .Long

4

6276

1569.11

... More
Supply,& fixing of 50x6mm GI Flat for earthing ,2.36kg/mtr.(12.5mtr. For L.A ,3Mtr for AB switch Body, For mesh formation and 2.5 mtr. For raising)=20.5x2.36

96.76

12022

124.25

... More
Supply,& installation of GI Barbed wire/Anticlimbing device (3kg per support, 2 no's qty required=(2x3kg)

12

1590

132.53

... More
Supply,& fixing of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

4.81

598

124.25

... More
Supply, installation, testing and commissioning of Lightning Arrester(12KV,10KA) Station Class 2

6

35287

5881.21

... More
Supply, installation, testing and commissioning of AB Switch(11KV,200A.3pole,50Hz)

2

39263

19631.63

... More
Supply,& fixing of 11KV pin insulator polymer

6

3479

579.84

... More
Supply,& fixing of H W fitting (B&S)70KN(3bolted)

6

11431

1905.18

... More
Supply,& fixing of Disc insulator (B&S)70 KN polymer

6

4771

795.21

... More
Supply & fixing of PG Clamp for 100 sq.mm AAA conductor

6

5765

960.87

... More
Supply,& fixing of GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch .

27.44

3545

129.22

... More
Supply & making of Black Paint

2

728

364.47

... More
Supply & making of Yellow Colour Paint for Background

4

1101

275.26

... More
CIVIL WORK

-

-

-

... More
Fixing of complete 11kv line complete stay set includes 1) Turn Buckle Assembly 2) Stay rod and Stay plate 3) Stay insulator 4) Stay wire. 5) Stay clamps with nuts & bolts BA will done the excvation including excvation. supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard

4

9090

2272.5

... More
Concreting ratio 1:1.5:3 (500mm X 500mm X 1800mm) = 0.450Cu.mtr

1.8

11817

6565

... More
Concreting ratio 1:1.5:3 with dimension(500mmX500mmX450mm) = 0.113Cu.mtr

0.45

2954

6565

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

4

14948

3737

... More
DP with AB Switch, no of cut point with 90degree angle & 11kv pin points with WPB

-

-

-

... More
Supply & fixing of Straight Cross Arm 100x50x6mm, 9.56 KG/Mtr, each channel length 1.2mtr,4 no's channel required=(4x9.56x1.2)

45.89

5701

124.25

... More
Supply & fixing of Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

10.57

1313

124.25

... More
Supply & fixing of Staright Cross Arm 100x50x6mm, 9.56 KG/Mtr, each channel length 0.306mtr,4 no's channel required=(4x9.56x0.306)

11.7

1453

124.25

... More
Supply & fixing of 11KV pin insulator polymer

6

1988

331.34

... More
Supply & fixing of H W fitting (B&S)70KN(3bolted)

6

3479

579.84

... More
Supply & fixing of Disc insulator (B&S)70 KN polymer

6

11431

1905.18

... More
Supply & fixing of PG Clamp for 55 sqmm AAA conductor

6

4771

795.21

... More
Supply & fixing of PG Clamp for 100 sqmm AAA conductor

6

5765

960.87

... More
Supply & fixing of H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr, 0.551 Mtr. Length, 2 no's qty, required (1 Pair)

4

747

186.8

... More
Supply & fixing of H.T, Stay set (Complete )

4

6276

1569.11

... More
Supply & fixing of H.T. Stay Insulator Type-C

4

298

74.72

... More
Supply & fixing of 7/10 SWG Stay Wire 15kg /stay

30

3362

112.08

... More
Supply & fixing of GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch .

14.87

1920

129.22

... More
Supply & laying of 55mm2 AAAC

0.03

1491

49700.33

... More
Supply& laying of 100mm2 AAAC

0.06

5467

91117.28

... More
CIVIL WORK

-

-

-

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard

4

9090

2272.5

... More
PART-F

-

-

-

... More
Dismantling of 55sqmm AAA Conductor,RSJ/WPB

-

-

-

... More
DISMANTLING PORTION

-

-

-

... More
Dismantling of 55sq.mm AAA Conductor

0.56

3642

6504.4

... More
Dismantling of RSJ/WPB

3

4184

1394.73

... More
N.B: The bidders are required to Quote their rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.