Odisha Industrial Infrastructure Development Corporation Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Industrial Infrastructure Development Corporation - IDCO Tender

Works
Civil And Construction
Civil Works Others
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date9 Feb 2024
Closing DateCancelled
Tender Amount₹ 14,34,398 
Notes
Download

Costs

Summary

Construction Of 11kv Line And Installation Of 11/0.4

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply fabrication and installation of Fish plate 50 x 6mm 2.36kg/mtr each 0.280 mlength 16no's required=(16x2.36x0.306). Complete in all respect as per the specification and direction of EIC.

10.57

1311

124

... More
Supply fabrication and installation of Straight Cross Arm 100 x 50 x 6mm, 9.56 KG/Mtr., each channel length0.306 mtr,4no's channel required =( 4x9.56x0.306). Complete in all respect as per the specification and direction of EIC.

11.7

1135

97

... More
Supply and installation of Danger plate. Complete in all respect as per the specification and direction of EIC.

1

133

133

... More
Supply fabrication and installation of Back clamp for danger plate 25x3 mm flat, 0.59 kg/mtr , Flat of 0.510 mtr length 1 nos=(1x0.59x0.510). Complete in all respect as per the specification and direction of EIC.

0.3

37

124

... More
Supply and installation of GI barbed wire anticlimbing device(3Kg/ support). Complete in all respect as per the specification and direction of EIC.

3

399

133

... More
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr, Flat of 0.510mtr length 4 no's = (4x0.59x0.510). Complete in all respect.

1.2

149

124

... More
SITC of 11 KV pin insulator polymer (2nos for T-off). Complete in all respect as per the specification and direction of EIC.

5

1655

331

... More
supply and installation of HW fitting (B&S) 70KN, 3Bolt . Complete in all respect as per the specification and direction of EIC.

6

3480

580

... More
SITC of Disc insulator (B&S) 70KN (3nos for T-off). Complete in all respect as per the specification and direction of EIC.

6

11430

1905

... More
Supply ,installation & commissioning of Earthing of Support ( Coil Type ). Complete in all respect as per the specification and direction of EIC.

1

275

275

... More
Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the specification and direction of EIC.

0.26

32

124

... More
SITC of PG Clamp for 100 sqmm AAA Conductor as per the specification and direction of EIC.

6

5766

961

... More
SITC of PG Clamp for 55 sqmm AAA Conductor as per the specification and direction of EIC.

3

2385

795

... More
Supply and Stringing of 55 sqmm AAA Conductor as per the technical specification and direction of EIC.

0.03

1491

49700

... More
Supply and fixing of GI nut, bolt & washer of different size. As per the requirement.

7.43

958

129

... More
Supply and painting of Black paint as required and direction of EIC.

0.5

182

364

... More
Supply and painting of Yellow colour paint as required and direction of EIC.

2

550

275

... More
Part A- Cost of Civil & Service Work

-

-

-

... More
Mass concreting of pole, Concreting ratio 1:1.5:3 (500mmX500mmX1800mm)= 0.425Cu.Mtr

0.5

3282

6565

... More
Mass concreting and couping of Concreting ratio 1:1.5:3 (500mmX500mmX1800mm)= 0.425Cu.Mtr

0.1

656

6565

... More
Part B- Cost of Materials For 11KV DP with AB Switch.

-

-

-

... More
Supply and erection of 11mtr long 160 x 152 WPB pole (GI) (30.44KG/Mtr.). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the specification and direction of EIC.

2

72512

36256

... More
Supply and installation of Top G.I. Channel 100 x 50 x 6mm, 9.56 Kg/Mtr., each G.I. Channel length 3 mtr,2no's G.I. Channel required ( 2x9.56x3=57.36Kg) .Complete in all respect as per the technical specification and direction of EIC.

57.36

5563

97

... More
Supply fabrication and installation of Fish plate 50 x 6mm 2.36Kg/mtr each 0.280mtr length 6 no's required=(6x2.36x0.280) .Complete in all respect as per the technical specification and direction of EIC.

3.97

491

124

... More
Supply fabrication and installation of AB switch Mounting G.I. Channel 75x40x4.8 mm,7.14 Kg/Mr. each G.I. Channel length 3mtr 2 no's G.I. Channel required =(7.14x3x2) .Complete in all respect as per the technical specification and direction of EIC.

42.84

4155

97

... More
Supply and installation of MU Channel GI 75 x 40 x 4.8mm (3000 mm long) (7.14Kg/Mtr,2Nos)(Each2×3.000×7.14=42.84Kg).Complete in all respect as per the technical specification and direction of EIC.

57.36

5563

97

... More
Supply fabrication and installation Cantilever Support 75x40x4.8 mm,7.14 Kg/Mr. each G.I. Channel length 0.810mtr 2 no's G.I. Channel required =(7.14x2x0.810) as .Complete in all respect as per the technical specification and direction of EIC.

11.57

1122

97

... More
Supply fabrication and installation of 50 x 50 x 6mm G.I. Cantilever Support angle 4.5Kg/mtr length 1.282mtr 2 no's angle required =(4.5x1.282x2) .Complete in all respect as per the technical specification and direction of EIC.

11.54

1119

97

... More
Supply fabrication and installation of AB switch side support G.I. Channel 100x50x6 mm,9.56 Kg/mtr each G.I. Channel length 0.35mtr 2 no's G.I. Channel required =(9.56x2x0.35) .Complete in all respect as per the technical specification and direction of EIC.

13.38

1298

97

... More
Supply fabrication and installation of G.I. Channel support for down pipe 75x40x4.8 mm,7.14 Kg/mtr each G.I. Channel length 0.8mtr 1no's G.I. Channel required =(7.14x0.8x1).Complete in all respect as per the technical specification and direction of EIC.

5.71

554

97

... More
Supply fabrication and installation of Double pole bracing channel 75x40x4.8 mm,7.14 Kg/mtr each G.I. Channel length 3mtr 2 no's G.I. Channel required =(7.14x3x2) .Complete in all respect as per the technical specification and direction of EIC.

42.84

4155

97

... More
Supply fabrication and installation of GI bracing Angle 75x40x4.8 mm,4.5 Kg/mtr each G.I. Channel length 3.512mtr 2 no's G.I. Channel required =(4.5x3.512x2) .Complete in all respect as per the technical specification and direction of EIC.

31.61

3065

97

... More
Supply and installation of Danger plate

2

266

133

... More
Supply fabrication and installation of Back clamp for danger plate 25x3 mm flat, 0.59 Kg/mtr , Flat of 0.510 mtr length 2 nos=(92x0.59x0.510)

0.6

74

124

... More
Supply & installation of 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC insulated for jumpering.Complete in all respect as per the technical specification and direction of EIC.

15

1050

70

... More
supply of HT stay clamp 50×8mm flat,3.14kg/mtr,0.551mtr Length, 2no qty required (1Pair) as per the directioon pof EIC.

2

380

190

... More
Supply of HT stay set complete.

2

3196

1598

... More
Supply of HT stay insulator Type-C

2

152

76

... More
supply of 7/10SWG stay wire 15 Kg/stay

30

3420

114

... More
Supply of 40mm Nominal bore GI pipe (medium gauge) earthing divice with 3mtr long.

2

3196

1598

... More
Supply of 50×6mm GI flat for earthing , 2.36kg/mtr (12.5mtr for LA, 3Mtr for AB Switch body, 2.5mtr for mesh formation and 2.5mtr for raising)=20.5×2.36 as per the direction of EIC.

48.38

5999

124

... More
Supply and installation of GI barbed wire anticlimbing device.(3Kg/Pole) .Complete in all respect as per the technical specification and direction of EIC.

6

798

133

... More
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr, Flat of 0.510mtr length 8no's = (8x0.59x0.510).Complete in all respect as per the technical specification and direction of EIC.

2.41

298

124

... More
SITC of Lightening Arrester (12kv,10kA) (Station Class-2).Complete in all respect as per the technical specification and direction of EIC.

3

17643

5881

... More
SITC of AB switch(11 KV,200A,3pole,50 Hz). Complete in all respect as per the technical specification and direction of EIC.

1

12177

12177

... More
SITC of 11KV Pin insulator polymer. Complete in all respect as per the technical specification and direction of EIC.

3

993

331

... More
Supply installation and commisssioning of HW fitting (B&S) 70KN Polymer type, 3 Bolted.Complete in all respect as per the technical specification and direction of EIC.

6

3480

580

... More
SITC of Disc insulator (B&S) 70KN Polymer type..Complete in all respect as per the technical specification and direction of EIC.

6

11430

1905

... More
Supply,installation & commissioning of PG Clamp for 55sqmm AAA Conductor..as per the technical specification of TPCODL and direction of EIC.

6

4770

795

... More
Supply and fixing of GI nut, bolt & washer of different size.(13.718Kg Each DP with AB Switch). As required.

13.72

1769

129

... More
Supply and painting of Black paint as required and direction of EIC.

1

364

364

... More
Supply and painting of Yellow colour paint as required and direction of EIC.

2

550

275

... More
Part B- Cost of Civil & Service Work

-

-

-

... More
Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0,5Cum cement concrete foundation 1:2:4 size (500rnmx 500mmx 800rnm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X 500X1500 mm.). Complete in all respect as per the specification and direction of EIC.

2

4546

2273

... More
Mass concreting of pole, Concreting ratio 1:1.5:3 (500mmX500mmX1800mm)= 0.425Cu.Mtr

0.9

5908

6565

... More
Mass concreting and couping of Concreting ratio 1:1.5:3 (500mmX500mmX1800mm)= 0.425Cu.Mtr

0.23

1477

6565

... More
Construction Earthing chamber including installation of earthing pipe Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe ..Complete in all respect as per the technical specification and direction of EIC.

2

7474

3737

... More
Supply and Erection of GI Fencing With Gate. Complete uin all respect as per the TPCODL Specification.

20

72720

3636

... More
Part C- Construction of new 11/0.4kV,250kVA DSS

-

-

-

... More
Supply and erection of 11mtr long 160 x 152 WPB (GI) pole (30.44Kg/Mr.) With excavation of Pole pit in all Kind of soilComplete in all respect as per the technical specification and direction of EIC.

2

64826

32413

... More
Supply and installation of Top G.I. Channel 100 x 50 x 6mm, 9.56 Kg/Mtr., each G.I. Channel length 3 mtr,2no's(each DTR) G.I. Channel required =( 2x9.56x3) Complete in all respect as per the technical specification and direction of EIC.

57.36

5563

97

... More
Supply fabrication and installation of Fish plate 50 x 6mm 2.36Kg/mtr each 0.280mtr length 6(Each DTR) no's required=(6x2.36x0.280) Complete in all respect as per the technical specification and direction of EIC.

3.96

491

124

... More
Supply fabrication and installation of Double pole belting G.I. Channel 75x40x4.8 mm,7.14 Kg/mtr each G.I. Channel length 3mtr, 2 no's(each DTR) G.I. Channel required =(7.14x3x2) Complete in all respect as per the technical specification and direction of EIC.

42.84

4155

97

... More
Supply and installation of 50 x 50 x 6mm G.I. bracing angle 4.5Kg/mtr length 3.512mtr 2no's(each DTR) angle required =(4.5x3.512x2) Complete in all respect as per the technical specification and direction of EIC.

31.6

3065

97

... More
Supply fabrication and installation of AB switch Mounting G.I. Channel 75x40x4.8 mm,7.14 Kg/Mr. each G.I. Channel length 3mtr 2 no's(each DTR) G.I. Channel required =(7.14x3x2) as required as per direction of TPCODL.

42.84

4155

97

... More
Supply fabrication and installation of AB switch side support G.I. Channel 100x50x6 mm,9.56 Kg/mtr each G.I. Channel length 0.35mtr 2 no's(each DTR) G.I. Channel required =(9.56x2x0.35) Complete in all respect as per the technical specification and direction of EIC.

6.69

648

97

... More
Supply fabrication and installation of G.I. Channel support for down pipe 75x40x4.8 mm,7.14 Kg/mtr each G.I. Channel length 0.8mtr 1no's(each DTR) G.I. Channel required =(7.14x0.8x1) Complete in all respect as per the technical specification and direction of EIC.

5.71

553

97

... More
Supply fabrication and installation of HG/DO Fuse Mounting G.I. Channel 75x40x4.8 mm,7.14 Kg/Mr. each G.I. Channel length 3mtr 2 no's(each DTR) G.I. Channel required =(7.14x3x2) .Complete in all respect as per the technical specification and direction of EIC.

42.84

4155

97

... More
Supply fabrication and installation Cantilever Support 75x40x4.8 mm,7.14 Kg/Mr. each G.I. Channel length 0.810mtr 2 no's(each DTR) G.I. Channel required =(7.14x3x2) as required as per direction of TPCODL.

11.56

1121

97

... More
Supply fabrication and installation of 50 x 50 x 6mm G.I. Cantilever Support angle 4.5Kg/mtr length 1.282mtr 2 no's(each DTR) angle required =(4.5x1.282x2) .Complete in all respect as per the technical specification and direction of EIC.

11.53

1118

97

... More
Supply and installation of 50x6mm GI flat for earthing 2.36Kg/m (2.5x7 mtr For mesh formation, 1.2 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) (.Each 65.6x 2.36= 154.81 Complete in all respect as per the technical specification and direction of EIC.

154.81

19196

124

... More
Supply and installation of 400A LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S.Complete in all respect as per the technical specification and direction of EIC.

1

79521

79521

... More
Supply & installation of 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC insulated (50Mtr. Each Dtr).Complete in all respect as per the technical specification and direction of EIC.

50

3500

70

... More
SITC of 1 Cx 400 mm2 LT XLPE Cable(Lin-Armoured).as per the technical specification of TPCODL and direction of EIC.

120

49560

413

... More
SITC of AB switch(11 KV,200A,3pole,50 Hz) as required as per direction of TPCODL.

1

12177

12177

... More
SITC of HG Fuse(11 KV,200A,3pole) as required as per direction of TPCODL.

1

10139

10139

... More
Supply,installation & commissioning of PG Clamp for 55sqmm AAA Conductor..as per the technical specification of TPCODL and direction of EIC.

6

4770

795

... More
SITC of Disc insulator (B&S) 70KN Polymer type.as per the technical specification of TPCODL and direction of EIC.

3

5715

1905

... More
Supply installation and commisssioning of HW fitting (B&S) 70KN Polymer type, 3 Bolted.Complete in all respect as per the technical specification and direction of EIC.

3

1740

580

... More
SITC of Lightening Arrester (12kv,10kA) (Station Class-2) Complete in all respect as per the technical specification and direction of EIC.

3

17643

5881

... More
SITC of 11 KV Pin insulator polymer.

3

993

331

... More
supply of HT stay set complete.

2

3196

1598

... More
supply of HT stay clamp (1.9Kg)

2

380

190

... More
supply of HT stay insulator Type-C

2

152

76

... More
supplyof 7/10SWG stay wire 15 Kg/stay

30

3420

114

... More
Supply of 40mm Nominal bore GI pipe (medium gauge) earthing divice with 3mtr long.

7

11186

1598

... More
Supply and fixing of GI nut, bolt & washer of different size.(25Kg Each DSS DP)

25

3225

129

... More
Supply and installation of GI barbed wire anticlimbing device.(3Kg/Pole). Complete in all respect as per the specification of TPCODL.

6

798

133

... More
Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr, Flat of 0.510mtr length 8no's = (8x0.59x0.510).Complete in all respect as per the specification of TPCODL.

2.4

297

124

... More
Supply and installation of Danger plate

2

266

133

... More
Supply fabrication and installation of Back clamp for danger plate 25x3 mm flat, 0.59 Kg/mtr , Flat of 0.510 mtr length 2 nos=(92x0.59x0.510)

0.6

74

124

... More
Name Plate

1

133

133

... More
Supply and painting of Black paint.

2

550

275

... More
Supply and painting of Yellow colour paint.

1

364

364

... More
SITC of 250 KVA,11/0.4 KV (Cu) Transformer with Tap Changer BIS Eneroy level- II. As per the TPCODL estimate.

1

700665

700665

... More
Part C- Cost of Civil & Service Work

-

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0,450Cu.mtr

0.9

5908

6565

... More
Couping ratio 1:1.5:3 (500m mX500mmX450mm) = 0 .113Cu.mtr

0.23

1477

6565

... More
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .Complete in all respect as per the specification of TPCODL.

2

4546

2273

... More
Construction Earthing chamber including installation of earthing pipe Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

7

26159

3737

... More
Cnstruction of LTDB Plinth. as per the technical specification of TPCODL and direction of EIC.

1

3030

3030

... More
Construction of DTR Plinth .as per the technical specification of TPCODL and direction of EIC.

1

25250

25250

... More
Laying of 1 Cx 400 mm2 LT XLPE Cable. as per the technical specification of TPCODL and direction of EIC.

120

8760

73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.