Odisha Industrial Infrastructure Development Corporation Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Industrial Infrastructure Development Corporation - IDCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date25 Mar 2025
Closing Soon3 Apr 2025
Tender Amount₹ 7,67,288 
Notes
Download

Costs

Summary

Supply Installation Testing And Commissioning Of 11kv Oh And Ug Line For Power Supply To Workers Hostel At Somnathpur Iid Under Electrical Section Balasore Odisha.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and installation of 11 KV Back clamp for V Cross Arm. Complete in all respect as per the specification of TPNODL and direction of EIC.

1

170

170.65

... More
Supply and installation of 11 KV Pole top F Clamp. Complete in all respect as per the specification of TPNODL and direction of EIC.

1

511

511.94

... More
Supply and installation of 11 kv Pin Insulator (Polymer). Complete in all respect as per the specification of TPNODL and direction of EIC.

6

426

2559.72

... More
SITC of HW fitting (T&C) 45KN. Complete in all respect as per the specification of TPNODL and direction of EIC.

6

277

1663.8

... More
Suply and Stringing of Disc insulator (T&C)45 KN polymer. Complete in all respect as per the specification of TPNODL and direction of EIC.

6

1834

11006.82

... More
Suply and installation of HT stay set(complete). Complete in all respect as per the specification of TPNODL and direction of EIC.

2

2239

4479.52

... More
Suply and installation of HT Stay insulator. Complete in all respect as per the specification of TPNODL and direction of EIC.

2

106

213.32

... More
Suply and installation of HT stay clamp(1.95kg/ pair). Complete in all respect as per the specification of TPNODL and direction of EIC.

2

266

533.28

... More
SITC of 7/10 SWG Stay wire 10kg/stay. Complete in all respect as per the specification of TPNODL and direction of EIC.

20

159

3199.6

... More
SITC of 11KV 1 core, 100mm2 XLPE insulated AAA conductor (Unarmoured). Complete in all respect as per the specification of TPNODL and direction of EIC.

0.03

191979

5951.36

... More
SITC of GI Pipe Earthing 40 Dia Medium gage 3 mtrs. Long. Complete in all respect as per the specification of TPNODL and direction of EIC.

2

2239

4479.52

... More
SITC of Earthing Materials. Complete in all respect as per the specification of TPNODL and direction of EIC.

2

4031

8063.14

... More
Supply, fabrication and installation of 100 x 50 x 6 mm GIChannel (each 2.8 Mtr. Long (9.2kg/mtr) 2 no.. Complete in all respect as per the specification of TPNODL and direction of EIC.

51.52

159

8242.17

... More
Supply, fabrication and installation of 75 x 40 x 6 mm GI Channel (each 2.8 Mtr. Long). Complete in all respect as per the specification of TPNODL and direction of EIC.

38.08

159

6092.04

... More
Supply, fabrication and installation of 50 x 50 x 6 mm GI Angle (each 2.8Mtr. Long). Complete in all respect as per the specification of TPNODL and direction of EIC.

25.2

159

4031.5

... More
SITC of PG clamp for 100 mm2 AAA conductor. Complete in all respect as per the specification of TPNODL and direction of EIC.

6

1237

7423.2

... More
Supply and fixing of GI Nuts & Bolts of Assorted Size. Complete in all respect as per the specification of TPNODL and direction of EIC.

10

166

1663.8

... More
SITC of Earthing support (coil type). Complete in all respect as per the specification of TPNODL and direction of EIC.

3

354

1062.3

... More
SITC of Danger plate. Complete in all respect as per the specification of TPNODL and direction of EIC.

3

170

511.95

... More
SITC of Anti Climbing Device made of GI barbed wire. Complete in all respect as per the specification of TPNODL and direction of EIC.

6

170

1023.9

... More
SITC of Sundries. Complete in all respect as per the specification of TPNODL and direction of EIC.

1

6399

6399.31

... More
Part A- Cost of Civil Work.

-

-

-

... More
Material cost for Concreting of lI Mtr RS Joist Pole 2.13 mtr 0.40 mtrx0.40 mtr =0.34 cum (PCC 1:3:6) @6S00. Complete in all respect as per the specification of TPNODL and direction of EIC.

3

2640

7920.24

... More
Material cost for Concreting of Stay(1.65mtrx0.30mtrx0.30mtr-0.15 cum -PCC1:3:6)@6500. Complete in all respect as per the specification of TPNODL and direction of EIC.

2

1150

2300.18

... More
Part B- Construction of 11KV 3Cx120 sqmm UG XLPE Cable-60Mtrs

-

-

-

... More
Supply and installation of 3Cx 120 mm2 11KV XLPE Cable(Armoured), A2XFY.Complete in all respect as per the specification of TPNODL and direction of EIC.

60

1405

84343.2

... More
SITC of Heat shrinkable jointing kit for 3Cx 120mm2 11 KV XLPE Cable (indoor type).Complete in all respect as per the specification of TPNODL and direction of EIC.

4

18142

72568.16

... More
SITC of Heat shrinkable jointing kit for 3Cx 120mm2 11 KV XLPE Cable(outdoor type).Complete in all respect as per the specification of TPNODL and direction of EIC.

4

25076

100307.04

... More
SITC of HDPE Pipe, 8", 10 Mtr, (Spec PE80-PN8, 160MM dia).Complete in all respect as per the specification of TPNODL and direction of EIC.

16

3807

60921.44

... More
SITC of Cable Laying in the Cable Trench with removable Cover. Complete in all respect as per the specification of TPNODL and direction of EIC.

30

1778

53358.9

... More
SITC of 10 Core 2.5 sqmm Cu Control Cable (Armoured). Complete in all respect as per the specification of TPNODL and direction of EIC.

12

703

8447.04

... More
SITC of 16 mm GI Bolt & Nuts with Washer. Complete in all respect as per the specification of TPNODL and direction of EIC.

20

166

3327.6

... More
SITC of AIl. Cable lug of different size. Complete in all respect as per the specification of TPNODL and direction of EIC.

30

110

3327.6

... More
SITC of 40 mm nominal bore GI Pipe (medium gauge)Earthing Device (3 mtr. Long). Complete in all respect as per the specification of TPNODL and direction of EIC.

2

2239

4479.52

... More
SITC of Earthing Materials. Complete in all respect as per the specification of TPNODL and direction of EIC.

2

4036

8072.34

... More
SITC of 25x6 mm GI Flat for earthing. Complete in all respect as per the specification of TPNODL and direction of EIC.

20

159

3199.6

... More
SITC of Lightning Arrester (12KV,10KA) Station Class. Complete in all respect as per the specification of TPNODL and direction of EIC.

3

7572

22717.56

... More
SITC of Sundries. Complete in all respect as per the specification of TPNODL and direction of EIC.

1

4266

4266.21

... More
Part B- Cost of Civil Work.

-

-

-

... More
Cost of Cubicle room(12' x 12' x 10') . Complete in all respect as per the specification of TPNODL and direction of EIC.

1

71508

71508



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.