Odisha Hydro Power Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Odisha Hydro Power Corporation Limited - OHPC Tender
Pipes and Pipe Related Activities
Eprocure
Opening Date23 Feb 2021
Closing Date15 Mar 2021
Tender Amount₹ 49,54,534 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 58,300Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
E-procurement Notice No. Bhep/15/2020-21 Dated 19.02.2021
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_OHPCL_66621_1Bid Award Id
ViewTender No
BHEP/15/2020-21 DATED 19.02.2021Tender Authority
Odisha Hydro Power Corporation Limited ViewPurchaser Address
-Website
http://http://ohpcltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of Concrete pavement along with pipe culvert with provision of retaining wall near Switchyard of BHEP, Balimela
Affidavit, undertakings and other documents as per DTCN
BOQ Items
... More
Construction of granular sub-base by providing close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision) as per direction of EIC.
417.9
-
2061.32
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth three wheel roller in stages to proper grade and camber, applying and brooming, crushable screening (morum and sand admixture) to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405 of MoRD & as per direction of EIC.
210
-
1469.85
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub-base with M43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per specification and as per Clause 602 of MoSRT&H Specifications for Road & Bridge works (4th Revision) as per direction of EIC.
485.1
-
5181.51
... More
Construction of retaining wall:
-
-
-
... More
Earth work in hard soil or gravelly soil with 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth complete as per direction of EIC.
543.75
-
182.8
... More
Filling Foundation and plinth with excavated stoney earth & hard soil etc. complete as per direction of EIC.
181.25
-
120.6
... More
Filling in Foundation and plinth with sand well watered and rammed including cost of labour,materials, royalty, conveyance etc. complete as per direction of EIC.
112.5
-
389.9
... More
Cement Concrete (1:3:6) with 4 cm size hard granite metal (HBG) including cost of labour, materials, royalty, conveyance etc. complete as per direction of EIC.
56.25
-
3950.9
... More
Random rubble H.G stone masonary in cement mortar (1:6) in foundation and plinth including cost of labour, materials, royalty, conveyance etc. complete as per direction of EIC.
421.88
-
3055.9
... More
12 mm thick plaster (1:6) for brick work including cost of labour, materials, royalty, conveyance etc. complete as per direction of EIC.
100
-
133.2
... More
R.C.C Pipe Culvert
-
-
-
... More
Providing and laying reinforced cement concrete NP-3 pipeof 1200 mm dia for culverts joint with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1100 of MoRD & as per direction of EIC.
11
-
2114.5
... More
Earth work in hard soil or gravelly soil with 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of EIC.
14.54
-
182.8
... More
Filling Foundation and plinth with excavated stoney earth & hard soil etc. complete as per direction of EIC.
4.85
-
120.6
... More
Filling in foundation and plinth with sand well watered and rammed including cost of labour, materials, royalty, conveyance etc. complete as per direction of EIC.
0.55
-
389.9
... More
Cement concrete (1:3:6) with 4 cm size hard granite metal (HBG) including cost of labour,materials,royalty, conveyance etc. complete as per direction of EIC.
0.83
-
3950.9
... More
Cement concrete (1:2:4) with 12 mm size hard granite metal (HBG) including cost of labour, materials, royalty, conveyance etc. complete as per direction of EIC.
1.63
-
5231.8
... More
Cutting, bending, binding and placing of HYSD bars in position including cost of HYSD bars and binding wire etc. complete as per direction of EIC.
1.53
-
6453.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements