Odisha Hydro Power Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Renovation Of Utility Sub Division
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_OHPCL_77139_1Bid Award Id
ViewTender No
CHEP-04/2022-23 (Sl. No.4)Tender Authority
Odisha Hydro Power Corporation Limited ViewPurchaser Address
-Website
http://http://ohpcltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2.5 cm A.S. flooring with C.C. (1:2:4) including punning using 12 mm size H.G. chips and including cost of materials, conveyance, royalty, taxes & cost of labour with T & P required etc complete as per direction of Engineer-in-charge
118.48
-
303.3
... More
Removing of cement plaster from walls including racking out joint to 12 mm deep and removing the debris away from work site with all leads and lifts as per direction of Engineer-in-charge.
171.43
-
39.3
... More
Earth work excavation for plinth & foundation in ordinary soil within 50 mtrs. initial lead and 1.5 mtrs. initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth & as per direction of Engineer-in-charge.
35.82
-
140.5
... More
Supply & filling in foundation and plinth with sand watered and rammed including the cost, conveyance, royalty, all other taxes and labour charges etc. complete.
17.41
-
500.2
... More
Cement concrete (1:3:6) with 4cm size hard granite metal including the cost, conveyance, royalty, all other taxes and labour charges etc. complete.
17.02
-
4463.1
... More
Cement concrete (1:2:4) to M 15 using 12 mm grade hard granite chips including lowering, laying concrete, watering and curing to required time etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T & P required for the work etc. complete as per direction of Engineer-in-charge.
8.4
-
5875.5
... More
Brick masonry in cement mortar (1:6) using Fly Ash bricks 25cmx12cmx8cm size having crushing strength not less than 75 Kg/Cm2 with dimensional tolerance of +/- 8% after immersing the bricks in water for six hours before using in superstructure including hoisting, placing in position, scaffolding splays, cutting circular moulding and curbelling, champering and similar such type of work, watering, curing to required time etc. including cost, conveyance and taxes of all materials and cost of all labour with T & P required for the work etc. complete as per direction of Engineer-in-charge.
9.04
-
4439.3
... More
16 mm thick cement plaster (1:6) in finished smooth to inside/outside rough surface of walls after racking out the joints including watering, curing to required time, cost, conveyance, royalties, taxes of all materials, cost of all labour with T & P required for the work complete etc. as per direction of Engineer-in-charge.
378.48
-
199.9
... More
Providing fitting and fixing of false ceiling with aluminium anodised T section no.3215 with 2'-0" centre to centre section no.1705 up to 15 micron on 4 walls to be fixed by means of steel screw and P.V.C plug and the Aluminium grid 2'-0" x 2'-0" suspended from ceiling etc. complete as per direction of Engineer-in-charge.
36.54
-
1337.2
... More
Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges up to 5mtr height.
97.4
-
7.2
... More
Priming one coat with any approved primer on Plastered surface after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T & P require for the work complete as per direction of Engineer-in-charge.
430.38
-
57
... More
Priming one coat with any approved primer on Iron work after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T & P require for the work complete as per direction of Engineer-in-charge.
8.64
-
54.2
... More
Distempering two coats with oil bound distemper of any approved shade over the interior surface of walls including cost, conveyance, royalties, taxes of all materials, cost of labour with T & P required for the work complete as per direction of Engineer-in-charge.
216.48
-
64
... More
Wall painting two coats with Weather seal coat Paint of any approved shade over the Exterior surface of walls including cost, conveyance, royalties, taxes of all materials, cost of labour with T & P required for the work complete as per direction of Engineer-in-charge.
213.9
-
71.7
... More
Painting two coats any approved shade of Enamel paint on wood / Iron work after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T & P require for the work complete as per direction of Engineer-in-charge.
51.13
-
135.1
... More
Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening an stacking the same for reuse and removing the debris away from work site with all leads and lifts as per direction of Engineer-in-charge.
17.69
-
315.6
... More
Dressed seasoned sal wood work framed and fixed (wrought and put up) in frame of doors and window etc.
0.15
-
56127.3
... More
32mm Piasal wood or local teack wood panelled shutters moulded panels with all labour, iron fittings and wooden hinged cleats etc fitted and fixed complete in all respect. But excluding cost of Iron fittings.
5.72
-
4384.5
... More
Taking out the door shutters and refixing them including screws as may be required.
6
-
109.5
... More
Taking out the window shutters and refixing them including screws as may be required.
5
-
66.7
... More
Iron work wrought and put up in trusses and record racks (labour only)
2.75
-
4695.7
... More
Supply of Materials
-
-
-
... More
MS Square tubes 80mm x 80mm 4.8mm
123.7
-
66.95
... More
MS Square tubes 49.5mm x 49.5mm x 4.5mm
151.73
-
58.47
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements