Odisha Hydro Power Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Hydro Power Corporation Limited - OHPC Tender

Opening Date17 Jun 2019
Closing Date2 Jul 2019
Tender Amount₹ 1,00,61,236 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Procedure for online payment
NIT for Replacement of fire fighting pipelines of HHEP, Burla from Ashok Niwas water tank to SST bays and GT bays of Burla Power House
DTCN for Replacement of fire fighting pipelines of HHEP, Burla from Ashok Niwas water tank to SST bays and GT bays of Burla Power House
BOQ for Replacement of fire fighting pipelines of HHEP, Burla from Ashok Niwas water tank to SST bays and GT bays of Burla Power House
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
8" (200mm) dia GI pipes

1191

73770

61.94

... More
4" (100 mm) dia GI pipes

337

20873

61.94

... More
Earth work excavation of foundation in stony earth & gravels mixed with store and boulder not exceeding 0.014 cum. In volume including dressing and leveling the bed and deposing the excavated soil away from work site with all leads, lifts and de-lifts including cost of all laburs, T&P etc. complete as per direction of Engineer-in-charge.

189.37

46255

244.26

... More
Cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and deposing materials within 50 mtr initial lead and 1.5m initial lift including rough dressing as per direction of the Engineer-in-charge.

50.83

20181

397.04

... More
Dismantling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50 mtr lead etc complete as per direction of Engineer-in-charge.

67.11

39111

582.79

... More
Fabricating, supplying and erection of (Rafter Purlin) MS framed work including fitting and fixing of all materials with cost, conveyance, royalty, taxes an cost of all labours etc. complete as per direction of Engineer-in-charge (35 Nos. hanger frame made with MS angle of size 75 x 75 x 6mm)

8.81

48393

5495.5

... More
Filling in foundation and plinth with sand well watered and rammed including cost, conveyance, royalty of all materials and cost of all labour and T&P etc. complete as per direction of Engineer-in-charge.

19.37

11853

611.97

... More
Cement concrete (1:3:6) using 4cm size hard granite crusher broken metal of approved quality free from weathered skin and flake cost of all labours, T&P etc. complete as per direction of Engineer-in-charge.

19.37

86222

4451.32

... More
Rigid smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost of all materials and cost of all labours etc. complete in all respect in ground floor as per direction of Engineer-in-charge.

297.5

34218

115.02

... More
Supply, fitting and placing uncoated HYSD bar reinforcement complete including cost, conveyance, taxes of all materials and cost of all labours etc. complete as per direction of Engineer-in-charge.

-

-

-

... More
10mm dia rod center to center spacing (6") or 0.15 mtr

10.86

75095

6914.88

... More
08mm dia rod for cross bar

6.71

46398

6914.88

... More
Cement concrete (1:2:4) using 12mm size hard granite crusher broken chips of approved quality free from weathered skin and flakes including cost, conveyance, royalty and taxes of all materials and cost of all labours and T&P etc complete as per direction of Engineer-in-charge.

62.27

365246

5866

... More
Laying in trenches MS pipes of all classes confirming to IS 3589-2001 & IS 3601-2006 of the following outside diameter as per specification complete including painting as per direction of Engineer-in-charge.

-

-

-

... More
8" (200mm) dia MS pipe

184

668749

3634.51

... More
8" (200mm) dia (Laying for Labour only)

166

6807

41.01

... More
8" (200mm) dia GI pipe

1191

5557515

4666.26

... More
6" (150mm) dia GI pipe

3

8750

2916.98

... More
4" (100mm) dia GI pipe

340

666933

1961.57

... More
20" (500mm) dia MS pipe

10

133569

13356.95

... More
Fixing swing check type Reflux valves with double flanged ends confirming to IS-5312 (Part-I)-2004 for water works purpose for the following rating and nominal diameters as per direction of the Engineer-in-charge.

-

-

-

... More
8" valve

11

727658

66150.73

... More
4" valve

12

476122

39676.85

... More
6" valve

7

370964

52994.93

... More
Supply at work site and fixing in position pre-cast RCC slab in CM (1:2:4) using 12mm size hard granite chips including centering, shuttering, cutting, bending, binding, laying concrete and watering for required period with cost, conveyance, royalty and taxes of all materials and cost of all labours etc. complete as per direction of Engineer-in-charge.

-

-

-

... More
33 mtr and 15 mtr road crossing.

64

130049

2032.02

... More
15 mtr road (4") pipe line

20

18448

922.43

... More
55 mtr road crossing (Power house front)

73

98291

1346.46

... More
Filling in foundation and plinth with excavated materials etc.

63.12

8936

141.58

... More
Supply of 02 Nos. of air release valve

2

89600

44800

... More
Supply of 01 No. of 8" (200mm) strainer including labour and other accessories

1

78400

78400

... More
Supply of 01 No. 4" (100mm) strainer including cost of labour and other accessories

1

56000

56000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.