Odisha Hydro Power Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 7,080Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_OHPCL_71646_1Bid Award Id
ViewTender No
HHEP-49/2021Tender Authority
Odisha Hydro Power Corporation Limited ViewPurchaser Address
-Website
http://http://ohpcltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Annexure-6-Procedure for online payment
BOQ Items
... More
Earth work excavation for plinth and foundation in ordinary soil within 50 mtrs initial lead and 1.5 mtrs initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth including mechanical carriage of 5Km and as per direction of Engineer-in-charge.
50
-
137.4
... More
Supply and filing in foundation and plinth with sand watered and rammed including the cost, conveyance, royalty, all other taxes and labour charges etc. complete.
5
-
490.3
... More
Cement concrete (1:3:6) with 4cm size hard granite metal including the cost, conveyance, royalty, all other taxes and labour charges etc. complete.
6
-
4589.5
... More
16mm thick cement plaster (1:6) after racking out the joints including watering, curing to required time, cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge.
200
-
196.8
... More
12mm thick cement plaster (1:4) over brick work with cement punning for skirting including watering, curing to required time, cost, conveyance, royalties taxes of all materials, cost of all labour with T&P required for the work complete etc. as per direction of Engineer-in-charge.
200
-
158.6
... More
First class Fly ash brick masonry in cement mortar (1:6) using fly ash brick having crushing strength not less than 75 Kg/Cm2 with dimensional tolerance of +/-8% after immersing the bricks in water for six hours before using foundation and plinth including hoisting, placing in position, watering, curing to required time etc including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-in-charge.
15
-
4266.2
... More
Cement concrete (1:2:4) with 12mm size hard granite chips including the cost, conveyance, royalty, all other taxes and labour charges etc. complete.
6
-
5987
... More
2.5cm AS flooring with C.C (1:2:4) including punning using 12mm size HG chips and including cost of materials, conveyance, royalty, taxes and cost of labour with T&P required etc complete as per direction of Engineer-in-charge.
200
-
303.3
... More
RCC work of (1:1.5:3) with 12mm and down grade black hard granite chips (crusher broken) including hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surface smooth, providing grooves or beds where necessary including cost of all materials (excluding cost of tor steel) and cost of all labour with T&P required as per direction of Engineer-in-charge.
4
-
6311.5
... More
Cutting, bending, binding and laying the grill of approved dia and placing in position of tor steel (Fe-500) for RCC works and using binding wire 18 to 20 gauge including cost, conveyance, taxes of all materials and labour complete as per direction of Engineer-in-charge.
4
-
8259.1
... More
Rigid and smooth centering and shuttering for RCC works including false works and dismantling them after casting including cost of material complete for foundation, plinth band and footings bases of columns mass concrete precast slabs.
20
-
104.7
... More
Distempering two coats with oil bound distemper of any approved shade over the interior surface of walls including cost, conveyance, royalties, taxes of all materials, cost of labour with T&P required for the work complete as per direction of Engineer-in-charge.
200
-
41.9
... More
Priming one coat with any approved primer on wood work after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge.
100
-
57.9
... More
Priming one coat with any approved primer on iron work after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge.
100
-
54.2
... More
Painting two coats any approved shade of paint on new wood work after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge.
100
-
132
... More
Painting two coats any approved shade of paint on new iron work after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge.
100
-
135.9
... More
Iron works wrought and put up in grated doors, windows and cage latrines including welding etc. complete.
200
-
823.6
... More
Labour for fitting and fixing of MS gates / wooden door with frame as per approved design including cost of all materials complete but excluding cost of MS gates/wooden door with frame and fittings.
20
-
139.8
... More
Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5 mtr height.
300
-
7
... More
Finishing wall surface with acrylic wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding sagging charges with cost of all materials, taxes, labour, T&P etc. complete.
50
-
71.4
... More
Priming one coat with any approved primer (water based) on plastered surface after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge.
300
-
59.7
... More
Wall painting two coats with weather seal coat paint of any approved shade over the exterior surface of walls including cost, conveyance, royalties, taxes of al materials, cost of labour with T&P required for the work complete as per direction of Engineer-in-charge.
200
-
80.09
... More
Painting two coats with aluminium paint on old iron work / plastered surface after cleaning the surface, sand papering etc. including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge.
100
-
132.69
... More
Wall painting two coats with plastic emulsion paint of any approved shade over the interior surface of walls including cost, conveyance, royalties, taxes of all materials, cost of labour with T&P required for the work complete as per direction of Engineer-in-charge.
300
-
80.1
... More
Removing old tarfelt from roof slab, cleaning the surface, working and removing the debris away from work site within 50 mtr lead.
300
-
67.3
... More
Providing and laying water proofs with polymeric bituminous membrance (plastic felt) Shaliplus 2045 (STP make) of 2.25 Km / Sqm and 1.5mm thickness consisting of layers having center core of 20 microns thermoplastic high molecular high density polyethylene HMHDPE film of grade 2504 including cleaning and priming the surface with Shalitex primer (oil based) of STP make @ 0.30 Kg/Sqm providing a coat of hot blown bitumen of 1.32 Kg/Sqm applying and laying plastic felt membrance with 10 cm overlap adhered to blown bitumen of 85/25 or 90/15 grade and covered with a layer of hot blown bitumen @ 1.2 Kg/Sqm etc. complete.
300
-
524.6
... More
Supplying, fitting, fixing up window (sliding type) made up powder coated aluminium section 9778 as windows frame, section No. 4095, 4096 and 9777, 3994 as shutter frame with 5mm thick aluminium cladded panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc comlete as per direction of Engineer-in-charge.
20
-
3718.1
... More
Providing, fitting, fixing of Al door with anodized Al. door section of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section No. 9221 and tapered clip No. 1855 including all cost of labour T&P, hire charges of drilling machine labour charges etc complete as shutter frame with 5mm thick Aluminium cladded panel fitted with rubber beading including locking arrangement includign all fitting including cost of materials all taxes labour, T&P etc. comlete as per direction of Engineer-in-charge.
40
-
5537.8
... More
Fixing of brass screw down bib cocks (Taps) polished bright conforming to IS: 781-1995 of the nominal sizes as per specification complete
150
-
29.17
... More
Fixing of brass push cock of nominal sizes as per specification complete
20
-
29.18
... More
Providing and fixing chlorinated polyvinyl chloride (CPVC) pipes confirming to IS-15778 having termal stability hot and cold water supply including all CPVC fittings. This includes jointing of pipes & fittings with one step CPVC refilling and testing of joints complete as per direction of Engineer-in-charge.
30
-
56.65
... More
Fixing of brass screw-down stop cocks conforming to IS: 781-1995 of the folloign nominal sizes as per specification.
30
-
44.2
... More
Providing and fixing to wall or eiling and floor PVC pipes class conforming to ASTM-D-1785/89 (Sch-80) and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling and floor all complete as per specification complete.
-
-
-
... More
15mm diameter
50
-
130.31
... More
20mm diameter
50
-
161.41
... More
25mm diameter
50
-
213.11
... More
32mm diameter
30
-
283.91
... More
40mm diameter
50
-
350.11
... More
50mm diameter
50
-
466.11
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements