Odisha Hydro Power Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Hydro Power Corporation Limited - OHPC Tender

Services
Housekeeping Services
Eprocure
Opening Date20 Nov 2023
Closing Date5 Dec 2023
Tender Amount₹ 55,01,615 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Cleaning of Power House, Valve House, fire fighting building, Stores of BHEP, Balimela on Job Contract Basis for 02 (two) years
Additional Bid Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Daily cleaning (PH front, back, left & right side area & main road between 1st gate to 2nd gate)

2874435

574887

0.2

... More
Weekly cleaning (Garrage & front road of Store)

164970

32994

0.2

... More
For 2nd year

-

-

-

... More
Daily cleaning (PH front, back, left & right side area & main road between 1st gate to 2nd gate)

2874435

603631

0.21

... More
Weekly cleaning (Garrage & front road of Store)

164970

34643

0.21

... More
Valve House

-

-

-

... More
For 1st year

-

-

-

... More
Daily cleaning (VH & surge shaft)

441330

88266

0.2

... More
For 2nd year

-

-

-

... More
Daily cleaning (VH & surge shaft)

441330

92679

0.21

... More
Cleaning of floor with broom stick/phool jhadu /coir including cost of labour, conveyance, T&P charges etc. complete in all respect as per direction of EIC.

-

-

-

... More
Power House

-

-

-

... More
For 1st year

-

-

-

... More
Daily cleaning (Work shop & office, office room & DC room, compressor room, steps, TWS floor, water gallery area)

255667.79

51133

0.2

... More
Alternate cleaning (transformer cooler floor, 11 KV, passage, garrage, P&C, utility, maintenance, section offices area)

170508

34101

0.2

... More
Weekly cleaning (preservation store, general store area)

60801

12160

0.2

... More
For 2nd year

-

-

-

... More
Daily cleaning (Work shop & office, office room & DC room, compressor room, steps, TWS floor, water gallery area)

255667.79

53690

0.21

... More
Alternate cleaning (transformer cooler floor, 11 KV, passage, garrage, P&C, utility, maintenance, section offices area)

170508

35806

0.21

... More
Weekly cleaning (preservation store, general store area)

60801

12768

0.21

... More
Valve House

-

-

-

... More
For 1st year

-

-

-

... More
Daily cleaning

65104

13020

0.2

... More
For 2nd year

-

-

-

... More
Daily cleaning

65104

13671

0.21

... More
Cleaning of floor with broom stick /phool jhadu/coir brush and with long head mope/ waist cloth, surf, scented phenyl and water including cost of labours, conveyance, in all respects as per direction of EIC.

-

-

-

... More
For 1st year

-

-

-

... More
Daily cleaning (machine floor, control room & protection room, glass room,passage-I & II, 1st floor steps, verandah, passage, conference hall & offices, generator floor & PH canteen area)

584089.3

987110

1.69

... More
For 2nd year

-

-

-

... More
Daily cleaning (machine floor, control room & protection room, glass room,passage-I & II, 1st floor steps, verandah, passage, conference hall & offices, generator floor & PH canteen area)

584089.3

1033838

1.77

... More
Cleaning of latrine floor, latrine pan, urinal room with brush/ Broomstick, surf, Scented phenyl and water etc. as per direction of EIC.

-

-

-

... More
Power House

-

-

-

... More
For 1st year

-

-

-

... More
Daily cleaning (PH ground floor & 1st floor lavatory)

32552

219726

6.75

... More
Weekly cleaning (PH canteen back side area)

4160

28080

6.75

... More
For 2nd year

-

-

-

... More
Daily cleaning (PH ground floor & 1st floor lavatory)

32552

230793

7.09

... More
Weekly cleaning (PH canteen back side area)

4160

29494

7.09

... More
Valve House

-

-

-

... More
For 1st year

-

-

-

... More
Weekly cleaning (VH lavatory)

520

3510

6.75

... More
For 2nd year

-

-

-

... More
Weekly cleaning (VH lavatory)

520

3686

7.09

... More
Quaterly cleaningod spider net and dust from side walls and ceiling by using broom stick etc including cost of labour, conveyance, T & p charges etc complete in all respect as per direction of EIC

-

-

-

... More
Power House

-

-

-

... More
For 1st year

-

-

-

... More
Quaterly cleaning (machine floor, passage-I, workshop & office, control room & protection room, passage-II, office room & DC room, 1st floor, verandah, conference hall & offices, generator floor, transformer cooler floor, 11 KV, passage, compressor room & TWS area)

40952

69208

1.69

... More
For 2nd year

-

-

-

... More
Quaterly cleaning (machine floor, passage-I, workshop & office, control room & protection room, passage-II, office room & DC room, 1st floor, verandah, conference hall & offices, generator floor, transformer cooler floor, 11 KV, passage, compressor room & TWS area)

40952

72485

1.77

... More
Valve House

-

-

-

... More
For 1st year

-

-

-

... More
Quaterly cleaning (VH wall & ceiling)

5024

8490

1.69

... More
For 2nd year

-

-

-

... More
Quaterly cleaning (VH wall & ceiling)

5024

8892

1.77

... More
Cleaning of glass with surf, water, colin and cora cloth including cost of labours, conveyance, T & P charges etc. complete in all respect as per direction of EIC.

-

-

-

... More
Power House

-

-

-

... More
For 1st year

-

-

-

... More
Weekly cleaning (glass rooms, conference hall area)

40352

68194

1.69

... More
For 2nd year

-

-

-

... More
Weekly cleaning (glass rooms, conference hall area)

40352

71423

1.77

... More
Cleaning of drains (earthwork in slushy soil) using phenyl and bleaching power after cleaning and disposal of the same at suitable place etc. as per direction of EIC.

-

-

-

... More
Power House

-

-

-

... More
For 1st year

-

-

-

... More
Monthly cleaning (PH drain area)

645

114880

178.11

... More
Quaterly cleaning (garrage & store area)

160.2

28533

178.11

... More
Half yearly cleaning (AB-7 to tailrace)

62.5

11131

178.11

... More
For 2nd year

-

-

-

... More
Monthly cleaning (PH drain area)

645

120627

187.02

... More
Quaterly cleaning (garrage & store area)

160.2

29960

187.02

... More
Half yearly cleaning (AB-7 to tailrace)

62.5

11688

187.02

... More
Valve House

-

-

-

... More
For 1st year

-

-

-

... More
Monthly cleaning (VH drain)

504

89767

178.11

... More
For 2nd year

-

-

-

... More
Monthly cleaning (VH drain)

504

94258

187.02

... More
Disposal of garbage from back and adjunct area of power house, Valve house, store & switchyard at the suitable dumping yard/ landfill site within 5 km including cost of labours, conveyance, T & P charges etc. complete as per direction of EIC.

-

-

-

... More
For 1st year

144

45707

317.41

... More
For 2nd year

144

45707

317.41

... More
Cutting and cleaning of shrub jungle, uprooting of stumps and small brushes and trees within 1 m girth on pre-measurement basis and dumping in suitable hips at suitable places as per direction of EIC.

-

-

-

... More
Power House

-

-

-

... More
Quaterly cleaning (left & right side area of tailrace, PH periphery, PH main gate to 2nd gate, switchyard chowk to AB-7 road, general store, preservation store, garrage and switchyard surroundings, back side of switchyard to AB-7, both side of cable way road to VH at penstock side area)

-

-

-

... More
For 1st year

167199

51865

0.31

... More
For 2nd year

167199

51865

0.31

... More
Valve House

-

-

-

... More
Quaterly cleaning (VH & surge shaft periphery, Chitrokonda main road junction to VH road area)

-

-

-

... More
For 1st year

51168

15872

0.31

... More
For 2nd year

51168

15872

0.31

... More
Hiring of Dozer D-50,A-15/JCB for spreading, cutting and cleaning of debris and earth during occurrence of heavy land slide in rainy season at the connecting road from Chitrakonda-Valve House junction to surge shaft including cost of conveyance for distance about 23 km from Balimela to Vave house as per direction of EIC.

-

-

-

... More
For 1st year

21

59514

2834

... More
For 2nd year

21

59514

2834

... More
Consumable materials for cleaning works for 02 years (exclusive of GST)

-

-

-

... More
Phool jhadu

140

9800

70

... More
Khadika jhadu

140

9800

70

... More
Phenyl (black) 500 ml.

300

22500

75

... More
Phenyl(White) 500 ml.

300

22500

75

... More
Napthaline Ball

8

1600

200

... More
Bleaching powder 25 Kg/ pkt

30

45000

1500

... More
Odonil

30

1200

40

... More
Room freshner

12

2160

180

... More
Carbolic Acid

40

6000

150

... More
Harpic (500 ml)

30

2700

90

... More
Detergent Powder (Nirma/ Ghadi/ Tide/ Wheel)

120

7800

65

... More
Bucket (plastic of 20 lit capasity)

12

1800

150

... More
Colin (Big)

40

3600

90

... More
Cora cloth

100

6000

60

... More
Cotton waste

200

12000

60

... More
Waste cotton piece

200

12000

60



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.