Odisha Hydro Power Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 18,047Document Cost
₹ 7,080Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OHPCL_99290_1Bid Award Id
ViewTender No
e-Tender-14/2023-24_UKHEPTender Authority
Odisha Hydro Power Corporation Limited ViewPurchaser Address
-Website
http://http://ohpcltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling and removing 2.5cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debries within 50mtr lead including all labour, T&P, sundries and labour cess etc complete and as per the directions of Engineer in charge.
38.4
3308
86.17
Dismantling and removing of M.S Gate (doors, windows and ventilators) including removal of fastenings & removing the debris within 50 mtr lead including all labour, T & P, sundries, and labour cess etc complete and as per the directions of Engineer in charge.
12
4125
343.76
Earth work in hard soil or gravelly soil within 50m intial lead & 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost of labour ,T&P sundries, and labour cess etc complete and as per the directions of Engineer in charge.
99.46
20565
206.77
Filling foundation & plinth with sand, well watered & rammed including cost, conveyance, royalty, T&P, sundries, lead, lift, delift and labour cess etc complete and as per the directions of Engineer in charge.
11.79
13341
1131.89
Cement concrete (1:3:6) with 40mm size HGCB metal including cost, conveyance, royalty, lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per the directions of Engineer in charge.
11.79
61279
5198.93
RCC work of M-20 grade with 20mm size and down grade black hard granite crusher broken stone chips including hoisting and laying including cost, coveyance, royalty,T&P, sundries, all lead, lift, delift, labour, labour cess and curing etc complete and as per the directions of Engineer in charge.
26.8
151854
5666.22
Supplying, fitting and placing uncoated HYSD bar TATA Tiscon Fe-500D/ SAIL ISI bar Reinforcement complete as per drawing and technical specification including cost, conveyance , all labour, T&P , sundries, labour cess etc complete and as per the directions of Engineer in charge.
28.65
255752
8926.46
Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost of all materials complete including all labour, T&P, sundries, lead, lift, delift and labour cess etc complete and as per the directions of Engineer in charge.
-
-
-
RCC foundation, plinth band and footing bases of cloumns , mass concrete and precast RCC slab etc
141.79
33168
233.93
R C C beams ,columns, girders and bressmers etc
98.88
99999
1011.32
RCC lintel.
6
3160
526.75
Random Rubble H.G. stone masonry in cement mortar(1:6) in foundation & plinth and superstructure including cost , conveyance, royalty, all labour,T&P, sundries, lead, lift, delift, labour cess and curing etc complete and as per the directions of Engineer in charge.
36.74
141208
3843.67
Brick work with fly ash brick 23cmx11cm x8cm size having crushing strength not less than 75kg/sqcm with dimensional tolerance ±2% in cement mortar (1:6) in foundation & plinth and superstructure including cost,conveyance, royalties, all labour,T & P, sundries, labour cess and curing etc complete and as per the directions of Engineer in charge.
54.23
278992
5144.33
Cement concrete (1:2:4) for P.C.C works with 12mm size HGCB chips including cost, conveyance , royalty, all labour, T&P, sundries, lead, lift, delift, labour cess and curing etc complete and as per the directions of Engineer in charge.
1.89
12586
6649.02
Fabrication and supply of 'Y'- shaped post with MS-angle 50*50*5 mm ISA with provision of fixing hooks of 8mm dia and 10cm long 4 nos per each post and fixing them in position with cement concrete (1:2:4) using 12 mm HGCB chips including cost of all materials, conveyance, all labour , T&P ,fabrication charges, sundries and labour cess and curing etc complete but excluding cost of cement concrete (1:2:4) and as per the directions of Engineer in charge.
51
33861
663.95
Providing and fixing Aluminum based Zal colour coated super razor punched barbed tape (SRPBT) Helix coil fencing of 1050mm dia (before stretch ) Zal (SRPBT) Helix coil specification 1. Diameter of coil unstretched 1050mm ii) No of spirals per running meter iii) weight of each coil with hesian pack -14 Kg (± 0.50 Kg) iv) central core wire made from 2.60 meter dia GI High tensile wire as per IS 4454 galvanized as per IS :2629 v) Razor punched strip- razor punched tape is CONSEC- ZAL steel comprising with Aluminum based with Zinc alloy 150gm/sqm confirming to ASTM-A -792 m with additional primer treatment of epoxy/ polyurethane and final paint top coat of coulifield green shade (BSL-139) by hot dipping process, barb tape length 23.5mm, barb width-18.60 mm , barb spacing-36mm, center width 7.4mm, colour- coulifield green, (BSL-139) up to 3 mtr height of wall with existing angle Iron Y-shaped placed 2.4m or 3 m apart with 3 horizontal ZAL SRPBT horizontal runner strands (Specification) (i) Central core - wire - made from 2.6mm dia spring steel core wire of 1670 N/Sqm tensile strength as per IS 4454 and galvanised as per IS 2629, Razor punched strip- Razor punched tape each CONSEC-ZAL steel comprising of Aluminum based with Zinc alloy @ 150gm/sqm confriming to ASTM-A-792/ A-792 m with additional primer treatment of epoxy/ ployurethane and final paint top coat of coulifield green shade (BSL-139) by hot dipping process, razor punched barbed tape -23.5mm, (barb width 18.60mm ) barb spacing-36mm core width 7.4mm, colour - coulifield green, BSL-139 strand tied with GI staples and GI clips to retain horizontal, including necessary bolts or GI barbed wire tied to Iron angle all complete as per the direction of the EIC (DAR-2016(Vol-II) item-16.53, P-1011 Unit = Per mtr
103.31
45876
444.07
Removing old lime or cement plaster from walls including racking out joints 12mm. deep and removing the debries within 50mtr lead including all labour, T & P, sundries,lead, lift, delift and labour cess etc complete and as per the directions of Engineer in charge.
254.5
10966
43.09
20 mm thick cement plaster (1:4) over stone work including cost, conveyance, royalty, all labour, T&P, sundries, labour cess and curing etc complete and as per the directions of Engineer in charge.
96.36
24014
249.22
16mm thick cement plaster in cement mortar (1:6) over brick work including Cost, conveyance, royalties, all labour, T&P, sundries , labour cess & curing etc complete and as per the directions of Engineer in charge.
800.32
180176
225.13
Providing, hoisting and fixing of double leaf M.S Gate of size 3.00 mtr x 2.00 mtr approximate weight 1.90 Qntl made up of MS angle & MS square bars and with 1 mm thick GP sheet body at the bottom portion of the Gate upto height of 1.00 mtr etc complete including all cost of materials, labour, fabrication charges, T & P, sundries, hoisting, fixing in position with cement concrete (1:2:4) using 12 mm size HGCB chips including lead, lift, delift and labour cess etc complete and as per the directions of Engineer in charge.
2
42234
21117.31
Priming one coat with red oxide primer of Asian / Berger / Shalimar make including cost of primer, brush, all labour, T&P, sundries, labour cess etc complete and as per the directions of Engineer in charge.
18
1098
61.05
Painting two coats with any approved enamel paint of Asian / Berger / Shalimar make including cost of paint, brush, all labour, T&P, sundries, labour cess etc complete and as per the directions of Engineer in charge.
18
2780
154.46
Priming one coat to walls with wall cement primer (ISI) including cost of primer water bound of Asian / Berger / Shalimar make including all labour, T&P, sundries, brush, scaffolding, putty and labour cess etc complete and as per the directions of Engineer in charge.
1061.68
72130
67.94
Painting two coats to out side walls surface with antifungal exterior weather coat paint of approved shade of Asian/Berger/Shalimar / Nerolac / Dulux or any equivalent make on new work to give an even shade at all height including cost of weather coat paint, brush, putty, all labour, T&P, sundries, scaffolding and labour cess etc complete and as per the directions of Engineer in charge.
1061.68
88140
83.02
Requirement and supply of M.S hollow section of cross section 50mm x50mm having 2.5 mm thick including cost, conveyance, lead, lift, delift, all labour, T &P, sundries and labour cess etc complete and as per the directions of Engineer in charge.
0.52
3012
5782.04
Hoisting joists & trusses & placing in position including all labour, T & P, sundries and labour cess etc complete and as per the directions of Engineer in charge.
1.36
1380
1014.37
Providing and fixing 0.47 mm thick TATA blue scope DURASHINE sheet in roof with 12 % over laps including drilling holes in wind ties including fixing of ridges , valleys, including cost of TATA blue scope sheet, J or L hook with bitumen washer , limpet washer etc complete including cost of all materials, labour, T&P, sundries & labour cess etc complete and as per the directions of Engineer in charge.
49
49301
1006.16
Providing, fitting & fixing of 80 mm thick paver block in floors of approved make laid on 20 mm thick cement mortar (1:4) (1 cement :4 course sand) and filling the joints with slurry including cost of all materials, conveyance, royalty, labour, T & P, sundries, lead, lift, delift, labour cess and curing etc complete and as per the directions of Engineer in charge.
38.4
36268
944.49
Filling in foundation & plinth with excavated materials including cost of labour, T &P, sundries and labour cess etc complete and as per the directions of Engineer in charge.
30.97
4268
137.85
Lifting of excavated earth & dismantled materials from the work site to out side of Bariniput Colony within 5 km away by any mechanical means & depositing the soil at a suitable dumping yard including cost of carriage, all labour, T& P, sundries and labour cess etc complete and as per the directions of Engineer in charge.
140.61
39198
278.77
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements