Odisha Hydro Power Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Hydro Power Corporation Limited - OHPC Tender

Education And Training Services
Opening Date29 Nov 2018
Closing Date10 Dec 2018
Tender Amount₹ 7,48,089 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismanling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nuts including stacking of the materials for reuse and removing the debris within 50m lead including labour, T&P, supervision, cess, overhead charges & contractor's profit, insurance etc. complete as per specification and direction of the Engineer-in-Charge.

43.2

2170

50.25

... More
Earth work in hard soil or gravelly soil in embankment road etc. with stone and boulders not exceeding 0.014 cum in Volume with all lead, lifts & delifts including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.30 M in depth including cost of all labour, T&P, supervision, overhead charges, taxes etc. complete as per specification & direction of the Engineer-in-Charge. (A). For Overhead Earth.

83.51

9352

112

... More
Filling in Foundation &Plinth with sand well watered and rammed for proper compaction including cost conveyance, royalty, & taxes of all materials, Labour, T&P, supervision , overhead chargeas, insurance, contractor profit & cess with all leads, lifts and delifts etc. complete as per specification and direction of the Engineer-in-Charge.

56.54

16632

294.2

... More
Cement Concrete(1:3:6) with 4cm. size hand broken H.G.metal for sharp edged of approved quality free from weathered coarse skin screened & washed coarse sand usuing 53 grade of (PPC) ISI brand cement including cost, conveyance, royalty, taxes of all materials labour, T&P , supervision,cess, overhead charges and contractor's profit insurance, watering, curing for specific period with all leads and lifts and all other connected operations etc. complete as per specification and direction of the Engineer-in- Charge.

28.27

96645

3419.15

... More
2.5 C.m. thick AS flooring with Cement concrete (1:2:4) including punning using 12 mm size hand broken hard granite chips usuing corse sand & 53 grade of ( PPC) ISI brand cement & mixing with concrete mixer machine including cost, conveyance, royalty, taxes of all materials, labour, T&P , . supervision,cess, overhead charges and contractor's profit, insurance, watering, curing for specific period with all leads and lifts and all other connected operations etc. complete as per specification and direction of the Engineer-in- Charge.

384.21

85640

222.9

... More
16 mm thick cement plaster (1:6) for brick masonry work usuing fine (Screened & washed ) sand & 53 grade of (PPC) ISI brand cement including cost, conveyance, royalty, taxes of all materials, T&P, supply of labour, supervision, overhead charges & C.P. insurance , watering, curing for specific period with all leads, lifts and all other connected operations etc. complete as per specification & direction of the Engineer-in-Charge.

602.24

82356

136.75

... More
6mm thick cement plaster (1:4) to RRC roof ceiling surfaces finished smooth including closed deep chipping and slurry treatment on roof ceiling usuing fine (Screened & washed ) sand & 53 grade of (PPC) ISI brand cement including cost, conveyance, royalty, taxes of all materials, labour charges, T&P, supervision, overhead charges, & C.P.insurance, labour cess, watering , curing for specific period with all leads, lifts & delifts and all other connected operations etc. complete in all respect as per specification and direction of the Engineer-in-Charge.

265.46

23904

90.05

... More
Brick work with C.B. bricks ( 23cm X 12 cm X 8 cm) having crushing strength not less than 35 Kg/Cm2 with dimensional tolerance ± 8% in cement mortar ( 1:6) in foundation and plinth including cost, conveyance, royalty, taxes of all materials, labour charges, T&P, GST, supervision, overhead charges & C.P., insurance, labour cess, watering, curing for specific period with all leads, lifts & delifts and all other connected operations etc. complete in all respect as per specification and direction of the Engineer-in-Charge.

1.53

4886

3196.15

... More
Fabricating and supplying M.S. steel Grill & shutters with frame including all materials, cost, conveyance to worksite, cess and all other taxes etc. complete as per specification and direction of the Engineer-in-Charge.

835.18

59046

70.7

... More
Labour for fitting the steel grill with M.S. window by welding and fitting in position including cost of fitting and fixing choukatha but including mending size of grooves in choukatha and size of shutters etc. complete as per direction of the Engineer-in-Charge. .

1

329

329

... More
Labour for fixing the steel window with frame in position including cost of fitting and fixing choukatha but including mending size of grooves in choukatha and size of shutters etc. complete as per direction of the Engineer-in-Charge.

110

18590

169

... More
Cement concrete (1:2:4) using 12mm size H.G.,hand broken chips free from weathered skin with sharp edged approved quality, coarse sand with washed & screened free from silt and cement 53 grade of ISI (PPC) brand specification including cost, conveyance royalty taxes of all materials, T & P, supply of labour, supervision, overhead charges, contractor's profit, Labour cess, insurance, watering,curing for specific perioe with all leads lifts & delifts with all other connected operations etc. complete as per specification and direction of the Engineer-in-Charge.

21.28

96209

4521.55

... More
Primer one coat with any approved primer ( red oxide) including cost, conveyance, royalty, taxes of all materials, labour, T&P, supervision, overhead charges & C.P., insurances, cess, watering, curing for specific period etc. Complete as per specification and direction of the Engineer-in-Charge.

37.79

1490

39.45

... More
Painting two coats with approved paint on old / New wood / steel work to give and even shade including cost of distemper, labour charges, T&P, supervision, overhead charges & C.P, insurance, labour cess etc. Complete as per specification and direction of the Engineer-in-Charge.

38.45

3629

94.4

... More
Primer one coat with any approved primer ( wall Primer) ISI brand including cost, conveyance, taxes of primer, labour charges T&P, supervision, overhead charges & C.P., Insurance, etc. complete in all respect as per direction of the Engineer-in-Charge.

1041.76

43806

42.05

... More
Distempering two coats to walls with distemper of approved quality on new work to give an even shade including cost, conveyance and taxes of material with all leads, lifts and delifts, labour, T&P, supervision, overhead charges & contractor's profit, cess, insurance etc. complete as per specification and direction of the Engineer-in-Charge.

858.19

39862

46.45

... More
Finishing walls with cement paint of approved quality on new work two coats to given an even shade including cost of paint, labour, T&P, supervision, overhead charges & C.P., insurance, labour cess, with all leads, lifts and delifts etc. Complete as per specification and direction of the Engineer-in-Charge.

183.57

4543

24.75

... More
Labour for fixing G.C.I. sheet in roof drilling hole in wind ties including fixing of ridges valley wind ties etc. including cost of fittings, labour cess with all leads, lifts & delifts etc. completes as per specification and direction of the Engineer-in-Charge.

43.2

4613

106.8

... More
Cost of fixing materilas for fixing and clamping G.C.I. sheet in position including drillings and all taxes, T&P, supervision, overhead charges & C.P., insurance, labour cess, with all leads, lifts and delifts etc. Complete as per specification and direction of the Engineer-in-Charge.

244

26779

109.75

... More
Painting two coats with approved Aluminum paint on new steel/ Old work to give and even shade including cost of materials, labour charges, T&P, supervision, overhead chartges & C.P., insurance, labour cess etc. complete as per specification and direction of the Engineer-in-Charge.

248.88

22797

91.6

... More
Cement punning including cost, conveyance and taxes of material, labour, T&P, supervision, overhead charges & C.P., insurance, watering curing for specific period with all leads and lifts and all other connected operations etc. complete as per specification and direction of the Engineer-in- Charge.

376.88

8329

22.1

... More
Dismentling and removing old tiles cladding from walls including racking out joints 12mm deep staking the useful materials for reuse and removing the debries within 50m leads including cost of labour charges, T&P, supervision, overhead charges & C.P., insurance, labour cess etc. Complete as per specification and direction of the Engineer-in-Charge.

38.4

1397

36.4

... More
Dismentling and removing old tiled flooring including removing the base coarse and stacking & then reuse and removing debris within 50m leads including cost of labour charges, T&P, supervision, overhead charges & C.P., insurance, labour cess etc. complete as per specification and direction of the Engineer-in-Charge.

9.63

674

70

... More
Earth work in foundation and plinth in hard soil or gravelly soil in embankment road etc. with all lead, lifts and delifts, including rough drssing and breaking clods to maximum 5 cm to 7cm laying in layers not exceeding 0.30m in depth with all other connected operations etc. complete in all respect as per direction of the Engineer-in-Charge. ( Foundation)

9.56

1284

134.4

... More
Fixing tiles in flooring treads or steps and landing on 25mm thick bed of cement mortor 1:1 jointed with neat cement slurry mixed with pigment to match the shades of tiles including rubbing and polishing complete including cost of precast tiles. ( inside Latrin & bath) including cost, conveyance, royalty, taxes of all materials, T & P, supply of labour, supervision, overhead charges & contractor's profit, Labour cess, insurance, with all leads, lifts & delifts with all other connected operations etc. complete as per specification and direction of the Engineer-in-Charge.

9.63

7571

785.9

... More
Fixing tiles dodas and rises of steps on 12mm thick cement slurry mixed pigment to match the shades of tiles in including rubbing and policing complet including cost of precast tiles. ( inside Latrin & bath) including cost, conveyance, royalty, taxes of all materials, T&P, supply of labour, supervision, overhead charges & contractor's profit, Labour cess, insurance, with all leads, lifts & delifts with all other connected operations etc. complete as per specification and direction of the Engineer-in-Charge.

38.4

30842

803.2

... More
Fixing granite tiles in flooring trades of staps and landing on 25mm thick bed of cement mortor 1:1 jointed with neat cement slurry mixed with pigment to match the shades of tiles including rubbing and polishing complete including cost of precast tiles. including cost, conveyance, royalty, taxes of all materials, T & P, supply of labour, supervision, overhead charges & contractor's profit, Labour cess, insurance, with all leads, lifts & delifts with all other connected operations etc. complete as per specification and direction of the Engineer-in-Charge.

3

6213

2071.1

... More
Providing laying and fixing PVC pipes confirming to IS 4985 of class IV of the following nominal bore and fittings including testing as per specification. including cost, conveyance royalty taxes of all materials, T & P, supply of labour, supervision, overhead charges & contractor's profit, Labour cess, insurance, GST , with all leads, lifts & delifts with all other connected operations etc. complete as per specification and direction of the Engineer-in-Charge. [I] 20mm ( 1/2") dia

22

2805

127.5

... More
(II) 25mm (1") dia

51

8537

167.4

... More
(III) 40mm ( 1.5") dia

9

1620

180.1

... More
Fitting and fixing of cowl including cost conveyance and all taxes of materials, labour, supervision etc. all complete as per direction of the Engineer-in-Charge.

2

121

60.6

... More
Fixing 12.50 Lt. capacity low level flushing cistern with a pairs of brackets complete with fittings such as symphonic arrangement 15mm nominal size brass/ PVC ball with polythene flot chromium plated brass handle, union and coupling for connection with inter outlet and over flowing, pipes, 40mm dia porcelain demanded flush bend, 12mm dia PVC inlet connection pipe including cutting holes and making good the same connecting the flushing bend with cistern and closset and connecting the Intel pipe with supply main etc. including cost, conveyance and all taxes of materials, labour, supervision etc. all complete as per direction of the Engineer-in-Charge.

2

4723

2361.85

... More
Fixing of wash Basin with hole for pillar, tapes with C.I. or M.S. brackets paints white including cutting holes in walls and making good the damages etc. including cost, conveyance and all taxes of materials, labour, supervision etc. all complete as per direction of the Engineer-in-Charge.

3

8686

2895.5

... More
Labour charges for fixing 15mm size Stop Cock, BB Cock, Consil stop cock, Reducer, Cross, Elbow, Shower, Telkom shower, Nipple, connecting pipe, T. stand, Sawar etc. complete as per specification & direction of the Engineer-in-Charge. ( Only labour charges) (a) B. B. Cock

3

88

29.65

... More
(b) West Water Pipe

3

88

29.65

... More
( c) Soap case

3

88

29.65

... More
(d) Angle stop Cock

3

88

29.65

... More
(e) Connecting Pipe

3

88

29.65

... More
(f) T. Stand

3

88

29.65

... More
(g) PVC U- Trappe.

3

88

29.65

... More
Cost of followingmaterials as per Sanctioned Estimate No. 97/2007-08. (a) B.B.Cock

3

1399

466.5

... More
(b) West Water Pipe

3

454

151.5

... More
( c) Soap case

3

151

50.5

... More
(d) Angle stop Cock

3

2269

756.6

... More
(e) Connecting Pipe

3

212

70.7

... More
(f) T. Stand

3

606

202

... More
(g) PVC U- Trappe.

3

757

252.5

... More
Supplying fitting and fixing of Mirror on the wall over Wash Basin including cost, conveyance and all taxes of materials, labour, supervision etc. all complete as per direction of the Engineer-in-Charge.

3

1212

404

... More
Fixing Gun Metal Check or Non- Return Valve Class-1 of the following nominal bore including cost, conveyance and all taxes of materials, labour, supervision etc. all complete as per direction of the Engineer-in-Charge. (1) 25mm (1") dia nominalbore

3

5024

1674.85

... More
(2) 40mm (1.5") dia nominalbore

2

5735

2867.5

... More
Fixing bowl pattern urinal including connecting the urinal waste pipe by means of white lead mixed with chopped hemp etc. supervision, insurance, labour cess all complete as per specification and direction of the Engineer-in-Charge.

4

10906

2726.5

... More
Fixing glazed earthenware squatting plate of size ( 600 x 350) mm with integral longitudinal flushing pipe including embedding the plate in 25mm cement mortar 1:8 laid over 150mm cement 1:5:10 using 40mm hard granite metal including all taxes, T&P, cost, conveyance and all taxes of materials, labour, supervision etc. all complete as per direction of the Engineer-in-Charge.

2

5589

2794.8

... More
Brick work with C.B. Bricks ( 23 cm X 11 cm X 8 cm) size in cement motar (1:4) in foundation and plinth per 1 cum including cost, conveyance, royalty, taxes of all materials, labour, T&P, supervision, overhead charges & C.P, insurance, cess, watering, curing for specfic period etc. complete as per specification and direction of the Engineer-in-Charge.

2.48

8377

3376.75

... More
Honey comb masonry with ( 23x11x8)cm C.B. brick having crushing strength not less than 75 Kg / cm2 in cement mortar ( 1:4) and plastered with 16mm thick cement mortar (1:6) including white washing two coats, including cost, conveyance, royalty, taxes of all materials, labour, T&P, supervision, overhead charges & C.P., insurance, cess, watering, curing for specific Period, etc. complete as per specification and direction of the Engineer-in-Charge.

4.53

3511

775.6

... More
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cutting, bending, tying, grills shifting to site with all leads, lifts & delifts, cost, conveyance of steel, labour charges, T&P, overhead charges & C.P., insurance, labour cess etc. complete in all respect as per drawing, design & specification by the Direction of the Engineer-in-Charge

0.58

3355

5794.5

... More
Rigid smooth centering shuttering for R.C.C. works including false works and dismantling them after casting for RCC foundation and plinth including cost of all materials, labour, T&P, supervision, overhead charges & C.P., insurance, labour cess, all taxes etc. complete as per specification and direction of the Engineer-in-Charge. ( A) R..C. C. Foundation and Pre-cast Slab.

64.82

5788

89.3

... More
Cement Concrete (1: 2:4) with 12mm size H.G hand broken Chips with sharp edged and free from weathered skin and screened & washed sand for R.C.C.works including hoisting and laying per one cum including cost, conveyance, royalty and taxes of all materials, labour, T&P, supervision, cess, overhead charges & Contractor's profit, insurance, watering, curing for a specific period with all leads and lifts and all other connected operations etc. all complete as per specification and direction of the Engineer-in-Charge.

1.6

7216

4521.5

... More
12mm thick cement plaster ( 1:4) for brick work with cement punning for skirting per one cum used sharp sand with washed and screened & free from silt and cement 53 grade of (PPC) ISI brand specification mixed with manually including cost, carriage, royalty of all materials, labour charges, T&P, supervision, overhead charges & C.P., insurance, labour cess, watering, curing for specfic period with all leads, lifts & delifts & all other connection operation etc. complete in all respect as per the direction of the Engineer-in-Charge.

9.05

1053

116.35

... More
C.B. brick khoa 4 cm size for soak-pit per 1 cum for A.S. flooring chips including cost, conveyance, royalty, taxes of all materials, labour, T&P, supervision, overhead charges & C.P., insurance, ces, etc. complete as per specification and direction of the Engineer-in-Charge.

2.72

1466

540.2

... More
Cleaning shrub jungles uprooting stumps and small bushes and trees below 1.00m girth on premeasurement and depositing the debris away from work site including cost of all labour, T&P, supervision, overhead charges & contractor's profit, insurance etc. all complete as per specification and direction of the Engineer-in- Charge.

1550

1162

0.75

... More
Taking out side the debris and excavated earth from office Premises within 5 Km by mechanical carriage with all other connected operations etc. complete as per specification and direction of the Engineer-in-Charge.

115.12

17399

151.15

... More
Supply, fitting and fixing of PVC S.W pipe including cost, conveyance and all taxes etc. complete as per specification and direction of the Engineer-in-Charge.

21

4392

209.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.