Odisha Cooperative Tasar And Silk Federation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Odisha Cooperative Tasar And Silk Federation Limited Tender
Civil And Construction
Eprocure
Opening Date8 Jun 2022
Closing Date16 Jun 2022
Tender Amount₹ 57,73,435 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 59,094Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SERIF_78224_2Bid Award Id
ViewTender No
VI-30(14)/SERIFED/2022-23/ 656Tender Authority
Odisha Cooperative Tasar And Silk Federation Limited ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete
13.55
-
-
... More
Fly ash Brick Masonery in C.M ( 1:6) in F&Pwith cost, conveyance, royality etc complete
21.37
-
-
... More
Fly ash Brick Masonery in C.M ( 1:6) in S/Swith cost, conveyance, royality etc complete
31.87
-
-
... More
R.C.C work ( 1:1.5:3) with 12 mm size chips including cost, conveyance etc complete
-
-
-
... More
Column Footing
5.25
-
-
... More
Column
2.45
-
-
... More
Plinth Band
2.69
-
-
... More
Lintel
2.69
-
-
... More
Roof Beam
2.3
-
-
... More
Chhaja
2.09
-
-
... More
Staircase
1.98
-
-
... More
Roof Slab
5.51
-
-
... More
Cutting bending and binding of M.S or Tor rod and tying the Grills etc complete
23.19
-
-
... More
16 mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:4) over work including cost, conveyance, royality of all materials etc complete
90.11
-
-
... More
16mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:6) over work including cost, conveyance, royality of all materials etc complete.
146.32
-
-
... More
Supplying Fitting and fixingwindow grills , shutters etc complete
-
-
-
... More
Verandha Grill
266
-
-
... More
PVC Door
3.25
-
-
... More
Fixing Vitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles etc complete as per specification and direction of engineer in charge.
347.61
-
-
... More
Distempering two coats with putty any approved shade including cost conveyance royality etc complete as per direction of EIC
534
-
-
... More
Two coat Weather painting over one coat primmer with approved shade etc complete
421.29
-
-
... More
S/F/F of S.Steel railing in 3 rows (top 2" dia one row niddle 3/4" dia in row) with required balustrade & newel post)
9.7
-
-
... More
First Floor.
-
-
-
... More
Fly ash Brick Masonery in C.M ( 1:6) in S/Swith cost, conveyance, royality etc complete
153.47
-
-
... More
R.C.C work ( 1:1.5:3) with 12 mm size chips including cost, conveyance etc complete
-
-
-
... More
Column
6.18
-
-
... More
Lintel Band
8.64
-
-
... More
Roof Beam
18.45
-
-
... More
Chhaja
61.87
-
-
... More
Stairecase
1.43
-
-
... More
Roof Slab
40.02
-
-
... More
Cutting bending and binding of M.S or Tor rod and tying the Grills etc complete
84.61
-
-
... More
16 mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:4) over work including cost, conveyance, royality of all materials etc complete
614.33
-
-
... More
16mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:6) over work including cost, conveyance, royality of all materials etc complete.
689.94
-
-
... More
Providing and fixing of factory made duroplast UPVC 2-track sliding/3-track window (white colour) complete,comprising UPVC multi-chambered frame 60 mm of size 67x54 with wall thickness of 2.3mm having in built upvc roller track on top and upvc etc..
38.55
-
-
... More
Providing ,fitting & fixing of UPVC doors with amodissed UPVC section frame of vertical member,Top member and bottom & meddle member with 12mm thick prelaminated Nova pan Board fixed in Door frame with frame section 60 mm and tapered clip and the frame to be completed by means of jointing angle with 112 sach including all cost of labour & materials.
29.36
-
-
... More
Supplying Fitting and fixingwindow grills , shutters etc complete
-
-
-
... More
MS Grill and Window
1660
-
-
... More
MS Door (Head Room)
616
-
-
... More
Fixing Vitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles etc complete as per specification and direction of engineer in charge.
312.52
-
-
... More
Supplying & fixing of Granaite slab over a levelling course.
21.88
-
-
... More
Finishing wall Distempering 2 coats with putty Arcylic emulsion washable distemper over a coat of primer of approved shad.
689.94
-
-
... More
'Painting two coats of enamel paint over a coat of priming including all costs of labour ,Paint, primer, brushes and putty required for the work etc complete and as per direction of Engineer-in-charge.
96.99
-
-
... More
Two coat Weather painting over one coat primmer with approved shade etc complete
614.33
-
-
... More
25mm grading in C.C (1:2:2) using 4.7 mm size hbg cleaned bajri (Down graded chips) mixed with water proof compound-per 1Sqmt
312.2
-
-
... More
S/F/F of S.Steel railing in 3 rows (top 2" dia one row niddle 3/4" dia in row) with required balustrade & newel post)
22.73
-
-
... More
Dismentalling of the structure with clearing & transportion debris with a lead of 100 mtr.
104.05
-
-
... More
PH and Sanitary work
1
-
-
... More
Electrification work
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements