Odisha Cooperative Tasar And Silk Federation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Cooperative Tasar And Silk Federation Limited Tender

Civil And Construction
Eprocure
Opening Date8 Jun 2022
Closing Date16 Jun 2022
Tender Amount₹ 57,73,435 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete

13.55

-

-

... More
Fly ash Brick Masonery in C.M ( 1:6) in F&Pwith cost, conveyance, royality etc complete

21.37

-

-

... More
Fly ash Brick Masonery in C.M ( 1:6) in S/Swith cost, conveyance, royality etc complete

31.87

-

-

... More
R.C.C work ( 1:1.5:3) with 12 mm size chips including cost, conveyance etc complete

-

-

-

... More
Column Footing

5.25

-

-

... More
Column

2.45

-

-

... More
Plinth Band

2.69

-

-

... More
Lintel

2.69

-

-

... More
Roof Beam

2.3

-

-

... More
Chhaja

2.09

-

-

... More
Staircase

1.98

-

-

... More
Roof Slab

5.51

-

-

... More
Cutting bending and binding of M.S or Tor rod and tying the Grills etc complete

23.19

-

-

... More
16 mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:4) over work including cost, conveyance, royality of all materials etc complete

90.11

-

-

... More
16mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:6) over work including cost, conveyance, royality of all materials etc complete.

146.32

-

-

... More
Supplying Fitting and fixingwindow grills , shutters etc complete

-

-

-

... More
Verandha Grill

266

-

-

... More
PVC Door

3.25

-

-

... More
Fixing Vitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles etc complete as per specification and direction of engineer in charge.

347.61

-

-

... More
Distempering two coats with putty any approved shade including cost conveyance royality etc complete as per direction of EIC

534

-

-

... More
Two coat Weather painting over one coat primmer with approved shade etc complete

421.29

-

-

... More
S/F/F of S.Steel railing in 3 rows (top 2" dia one row niddle 3/4" dia in row) with required balustrade & newel post)

9.7

-

-

... More
First Floor.

-

-

-

... More
Fly ash Brick Masonery in C.M ( 1:6) in S/Swith cost, conveyance, royality etc complete

153.47

-

-

... More
R.C.C work ( 1:1.5:3) with 12 mm size chips including cost, conveyance etc complete

-

-

-

... More
Column

6.18

-

-

... More
Lintel Band

8.64

-

-

... More
Roof Beam

18.45

-

-

... More
Chhaja

61.87

-

-

... More
Stairecase

1.43

-

-

... More
Roof Slab

40.02

-

-

... More
Cutting bending and binding of M.S or Tor rod and tying the Grills etc complete

84.61

-

-

... More
16 mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:4) over work including cost, conveyance, royality of all materials etc complete

614.33

-

-

... More
16mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:6) over work including cost, conveyance, royality of all materials etc complete.

689.94

-

-

... More
Providing and fixing of factory made duroplast UPVC 2-track sliding/3-track window (white colour) complete,comprising UPVC multi-chambered frame 60 mm of size 67x54 with wall thickness of 2.3mm having in built upvc roller track on top and upvc etc..

38.55

-

-

... More
Providing ,fitting & fixing of UPVC doors with amodissed UPVC section frame of vertical member,Top member and bottom & meddle member with 12mm thick prelaminated Nova pan Board fixed in Door frame with frame section 60 mm and tapered clip and the frame to be completed by means of jointing angle with 112 sach including all cost of labour & materials.

29.36

-

-

... More
Supplying Fitting and fixingwindow grills , shutters etc complete

-

-

-

... More
MS Grill and Window

1660

-

-

... More
MS Door (Head Room)

616

-

-

... More
Fixing Vitrified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles etc complete as per specification and direction of engineer in charge.

312.52

-

-

... More
Supplying & fixing of Granaite slab over a levelling course.

21.88

-

-

... More
Finishing wall Distempering 2 coats with putty Arcylic emulsion washable distemper over a coat of primer of approved shad.

689.94

-

-

... More
'Painting two coats of enamel paint over a coat of priming including all costs of labour ,Paint, primer, brushes and putty required for the work etc complete and as per direction of Engineer-in-charge.

96.99

-

-

... More
Two coat Weather painting over one coat primmer with approved shade etc complete

614.33

-

-

... More
25mm grading in C.C (1:2:2) using 4.7 mm size hbg cleaned bajri (Down graded chips) mixed with water proof compound-per 1Sqmt

312.2

-

-

... More
S/F/F of S.Steel railing in 3 rows (top 2" dia one row niddle 3/4" dia in row) with required balustrade & newel post)

22.73

-

-

... More
Dismentalling of the structure with clearing & transportion debris with a lead of 100 mtr.

104.05

-

-

... More
PH and Sanitary work

1

-

-

... More
Electrification work

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.