Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Bid Identification No. Occl-dgp/01/2021-22
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_OCCL_68530_1Bid Award Id
ViewTender No
e-procurement Notice No-02/OCCL/2021-22 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site within a lead of minimum 5 km from the place of excavation including cost of all labour, machineries, POL, T&P, taxes, cess etc. complete as per specification & direction of Engineer-in-Charge.
14131.66
-
119.75
... More
Excavation of Medium Hard Rock in Canal Slopes & other deep cutting by means of rock breaker with all lifts, delifts including trimming the side slopes to designed finished section, loading into & transportation by transport vehicles & dumping in the specified dump yard within all leads including cost of all labour, taxes, cess, T&P, incidental charges etc complete as directed by the Engineer-in-charge.
6781.54
-
416
... More
Filling of canal bed after removal of silt with sand of approved quality including watering and ramming with all cost, conveyance, royalty and taxes of all materials and labour, labour cess etc. complete as per direction of Engineer-in-charge.
1322.1
-
752.9
... More
Supplying 150 GSM Non woven geotextile for separation and filtration purpose below the CGCM, as per required specifications including all costs, labour, T&P, taxes, cess etc. complete as per site conditions as directed by the Engineer-in-Charge.
23865.6
-
35
... More
Supplying of double layer Cementious Geosythentic Concrete Mattress (CGCM) (minimum 100mm thick maximum 120mm thick after filling) with intermittent filter points in both directions (longitudinal & vertical) to release the pore water pressure made up of Polyster (PET) of mass 380 g/m² and tensile strength of ≥ 50 KN/m² and capacity to withstand the high UV resistance including cost of all materials, labour and track position etc, with all taxes, T&P, cess etc. Complete as per direction of Engineer-in-charge.
29354.69
-
1600
... More
Laying of 150 GSM Non woven geotextile for separation and filtration purpose below the CGCM, as per required specifications including all costs, labour, T&P, taxes, cess etc. complete as per site conditions as directed by the Engineer-in-Charge.
23865.6
-
15.15
... More
Laying of double layer (Cementious Geosythentic Concrete Mattress CGCM (minimum 100mm thick maximum 120mm thick after filling) with intermittent filter points in both directions (longitudinal & vertical) to release the pore water pressure made up of Polyster (PET) of mass 380 g/m² and tensile strength of ≥ 50 KN/m² and capacity to withstand the high UV resistance including cost of all materials, labour and track position etc, with all taxes, T&P, cess etc. Complete as per direction of Engineer-in-charge.
29354.69
-
252.5
... More
Providing and placing in position Plain Cement Concrete (PCC) M-25 grade with 10 mm & downgraded crusher broken hard granite chips mixed in batching and mixing plant, transporting mixed concrete by mechanical means with admixture @ 3.80 Kg/cum including cost of all materials, labour and machineries, finishing, curing , clearing the site with all leads, lifts and delifts for all materials as per approved drawings and specifications in canal bed & slope including cost of construction, maintenance and dewatering of seepage water with all incidental charges including royality, taxes, cess etc. complete with construction of cross bonds & ramps as per specification and as per the direction of Engineer-in-Charge.
2386.56
-
5139.2
... More
Providing and placing in position Plain Cement Concrete (PCC) M-15 grade with 20 mm & downgraded crusher broken hard granite chips mixed in batching and mixing plant, transporting mixed concrete by mechanical means with admixture @ 3.80 Kg/cum including cost of all materials, labour and machineries, finishing, curing , clearing the site with all leads, lifts and delifts for all materials as per approved drawings and specifications in canal bed & slope including cost of construction, maintenance and dewatering of seepage water with all incidental charges including royalty, taxes, cess etc. complete with construction of cross bonds & ramps as per specification and as per the direction of Engineer-in-Charge
1459.92
-
4299.95
... More
Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5 km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction with suitable manual method to all heights maintenance, watering and lighting of haul road and borrow area etc. including cost of labour, T&P, Royalty, taxes, cess etc. complete as per the direction of Engineer-in-charge.
8374.92
-
127.3
... More
Form work for concrete in canal structures with F-1 finish using steel shuttrer plates of approved specifications for all surface including supply of shutter plate and all other materials by mechanical/manual means and dismantling and finished complete with all cost for mobilisation, demobilisation, coffer dam, diversion road, approach road, site illumination & all taxes, royalties, B&OCWW cess, labour etc. and all costs incidental to the work as per drawing, specification and direction of the Engineer-in-Charge..
3772.8
-
684.85
... More
Providing & laying Maccaferri Galvanized PBC coated 2.00 M X 1.00 M X 1.00 M Gabion Bo with opening size 10 cm X 12 cm to proper line and level complete with rough stone packing including cost of all materials, labour, labour cess, royalty etc complete as per the direction of Engineer-in-Charge.
6930.29
-
2491.6
... More
Supplying of 7 (+) mm thickness Cementitious Composite Geo-synthetic Carpet, as per required specifications including all costs, labour, T&P, taxes, cess etc. complete as per site conditions as directed by the Engineer-in-Charge.
15555.6
-
2775
... More
Laying & Installation of 7 (+) mm thickness Cementitious Composite Geo-synthetic Carpet, as per required specifications including all costs, labour, T&P, taxes, cess etc. complete as per site conditions as directed by the Engineer-in-Charge.
15555.6
-
222.2