Odisha Construction Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Construction Corporation Limited - OCCL Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date19 Oct 2023
Closing Date2 Nov 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

E-procurement Notice No.39/occl/2023-24 (on-line)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection, Fabrication, commissioning, testing of new radial gates in bay No. 4 & 5 with its components in segmentation method including labour, hire charge of machinery, crane, equipments, tools & tackles etc, excluding welding rod, Oxygen, DA to be supplied by Corporation and as per direction of Engineer-in-charge

156.46

-

-

... More
Dismantling of existing trunnion hub assemblies and re-erection of the same after rectification, alignment, overhauling including labour, hire charge of machinery, crane, equipments, tools & tackles etc. and direction of Engineer-in-charge

12.6

-

-

... More
Re-erection of dismantled hoist bridge & hoisting arrangements in bay No. 4 & 5 with alignment, Fabrication, commissioning and testing, fitting of new wire rope assemblies, overhauling of hoisting arrangemnts, application of cardium compound in wire ropes, gear oil topping in worm reducerincluding labour, hire charge of machinery, crane, equipments, tools & tackles etc, excluding wire ropes, turn buckles, Grease, Cardium compound, gear oil, welding rod, Oxygen, DA to be supplied by Corporation and as per direction of Engineer-in-charge.

80

-

-

... More
Painting of 2 (Two) sets new radial gate and its components in bay No.4 & 5 after surface preparation by blast cleaning process, performed with sand as per requirements and class 'A' of IS : 14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris preferably by air blast with help of blower. Over the prepared surfaces two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less coal tar epoxy paint applied at an interval of 24 hours. Each coat should give a minimum dry film thickness of 150±5 microns. The total dry film thickness of all the coats including primer coating should not less than 350 ±5 microns as per IS: 14177:1994, including sand, labour, machinery, equipments, scaffolding etc.and as per direction of Engineer-in-charge

3000

-

-

... More
Arrest of leakage through stoplog segments (09 segments) in front of Radial gates in Bay No.4 & 5 to facilitate replacement of existing damaged gates & insertion of new Gates including supply of equipments, under water drivers with required license, cotton waste, gunny bags, rope & transportation charges of vehicle, manpower, taxes etc.of UIHEP, Dist-Nawarangpur (Odisha) complete in all respect & as per direction of Engineer-in-charge

2

-

-

... More
Insertion of Stoplog segments (09 segments) in up-stream side of Radial gates by operating Gantry crane to stop water flow including labour, equipments etc. & as per direction of Engineer-in-charge

2

-

-

... More
RADIAL GATES OF MURAN DAM (BAY NO. 4)

-

-

-

... More
Dismantling, removal and shifting of existing radial gates in bay No. 4 with its components to desiginated site provide by Deptt. by cutting into pieces including labour, hire charge of machinery, crane, equipments, tools & tackles etc, excluding Oxygen, DA to be supplied by Corporation and as per direction of Engineer-in-charge.

78.23

-

-

... More
Dismantling and removal of existing hoist bridge in bay No. 4 including hoisting arrangements, wire rope assemblies etc.including labour, hire charge of machinery, crane, equipments, tools & tackles etc, excluding Oxygen, DA to be supplied by Corporation and as per direction of Engineer-in-charge

40

-

-

... More
Erection, Fabrication, commissioning, testing of new radial gates in bay No. 4 with its components in segmentation methodincluding labour, hire charge of machinery, crane, equipments, tools & tackles etc, excluding welding rod, Oxygen, DA to be supplied by Corporation and as per direction of Engineer-in-charge

78.23

-

-

... More
Dismantling of existing trunnion hub assemblies and re-erection of the same after rectification alignment, overhauling including labour, hire charge of machinery, crane, equipments, tools & tackles etc. and as per direction of Engineer-in-charge

6.3

-

-

... More
Re-erection of dismantled hoist bridge & hoisting arrangements in bay No. 4 with alignment, Fabrication, commissioning and testing, fitting of new wire rope assemblies, overhauling of hoisting arrangemnts, application of cardium compound in wire ropes, gear oil topping in worm reducer etc. including labour, hire charge of machinery, crane, equipments, tools & tackles etc, excluding wire ropes, turn buckles, Grease, Cardium compound, gear oil, welding rod, Oxygen, DA to be supplied by Corporation and as per direction of Engineer-in-charge

40

-

-

... More
Painting of 2 (Two) sets new radial gate and its components in bay No.4 after surface preparation by blast cleaning process, performed with sand as per requirements and class 'A' of IS : 14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris preferably by air blast with help of blower. Over the prepared surfaces two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less coal tar epoxy paint applied at an interval of 24 hours. Each coat should give a minimum dry film thickness of 150±5 microns. The total dry film thickness of all the coats including primer coating should not less than 350 ±5 microns as per IS: 14177:1994, including sand, labour, machinery, equipments, scaffolding etc.and as per direction of Engineer-in-charge

1500

-

-

... More
Arrest of leakage through stoplog segments (09 segments) in front of Radial gates in Bay No.4 to facilitate replacement of existing damaged gates & insertion of new Gates including supply of equipments, under water drivers with required license, cotton waste, gunny bags, rope & transportation charges of vehicle, manpower, taxes etc.of UIHEP, Dist-Nawarangpur (Odisha) complete in all respect & as per direction of Engineer-in-charge

1

-

-

... More
Insertion of Stoplog segments (09 segments) in up-stream side of Radial gates by operating Gantry crane to stop water flow including labour, equipments etc. & as per direction of Engineer-in-charge

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.