Odisha Construction Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Construction Corporation Limited - OCCL Tender

Civil And Construction
Irrigation Work
Eprocure
Opening Date8 Aug 2022
Closing Date29 Aug 2022
Tender Amount₹ 40,63,72,606 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

23656.2

-

45.49

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
DI K7 700 mm DIA

991.1

-

13033.9

... More
DI K7 600 mm DIA

1483

-

9285.38

... More
DI K7 500 mm DIA

891.7

-

7131.61

... More
DI K7 450 mm DIA

325.6

-

6126.56

... More
DI K7 400 mm DIA

434.6

-

5103.94

... More
DI K7 300 mm DIA

242.58

-

3487.57

... More
DI K7 250 mm DIA

597.75

-

2766.44

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 225 mm DIA

1065.46

-

1256.74

... More
HDPE PN6 200 mm DIA

8545.89

-

995.34

... More
HDPE PN6 180 mm DIA

3400.95

-

794.45

... More
HDPE PN6 160 mm DIA

2219.43

-

638.69

... More
HDPE PN6 140 mm DIA

1365.51

-

487.42

... More
HDPE PN6 125 mm DIA

2092.63

-

388.93

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
DI K7 700 mm DIA

991.1

-

512.4

... More
DI K7 600 mm DIA

1483

-

363.2

... More
DI K7 500 mm DIA

891.7

-

270.7

... More
DI K7 450 mm DIA

325.6

-

251.2

... More
DI K7 400 mm DIA

434.6

-

213.2

... More
DI K7 300 mm DIA

242.58

-

137.7

... More
DI K7 250 mm DIA

597.75

-

117.1

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 225 mm DIA

1065.46

-

314.5

... More
HDPE PN6 200 mm DIA

8545.89

-

282.5

... More
HDPE PN6 180 mm DIA

3400.95

-

282.5

... More
HDPE PN6 160 mm DIA

2219.43

-

205.3

... More
HDPE PN6 140 mm DIA

1365.51

-

176.9

... More
HDPE PN6 125 mm DIA

2092.63

-

159.9

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

30.03

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

952

-

624.9

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

30.03

-

516.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

23

-

35087

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

15

-

35933

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

1

-

34866

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

57

-

11739.6

... More
b) 1 Ha Outlet

74

-

8415

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
125 mm

1

-

15522.29

... More
150 mm

6

-

17239.45

... More
200 mm

15

-

19023.05

... More
400 mm

1

-

81096.28

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

5

-

17942.85

1

-

22563.3

... More
100 mm

2

-

28923.67

... More
150 mm

7

-

46105.74

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
250 mm

1

-

51768.1

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

87

-

2854.7

... More
ii) 110mm

101

-

2854.7

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
125 mm

1

-

801.6

... More
150 mm

6

-

1093

... More
200 mm

15

-

1427.1

... More
400 mm

1

-

4362.7

... More
Air Valves

-

-

-

5

-

489.5

1

-

489.5

... More
100 mm

2

-

776.2

7

-

1170.4

... More
Sluice Valves

-

-

-

1

-

2327.3

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

5

-

40037.9

... More
Construction of River/Nallah Crossing of the under ground pipe line with RCC lining of pipe &Thrust Block as per the Approved Drawing including cost of Earthwork, RCC, PCC, Reinforcement & Shuttering, including cost of diversion work, including restoration of the Nallah/stream, including dewatering of foundation pit, including cost of all materials, labour, T&P, carriage, including all leads, lifts and delifts, all taxes, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

4

-

68108.8

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

891.52

-

71.02

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

4.43

-

4128.7

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

142.63

-

4853.2

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

420.36

-

713

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

35.29

-

10144.32

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

205.01

-

31.3

... More
Construction of Horizontal Thrust Blocks at different location of the distribution network, as per approved Drawings and specifications including Excavation of foundation, dressing and levelling the bed, depositing the surplus excavated material after backfilling away from work site, including all PCC, RCC, reinforcements, shuttering and centering, , including cost of all materials, Carriage, Handling and rehandling, fixing the pipe line in proper position, including all leads, lifts and delifts,including all labour,T&P, machineries etc, including royalty, all taxes (excluding GST), including labour cess, . complete as per the specification and direction in Engineer-in-charge.

8

-

5963.26

... More
Construction of Precast RCC (M-25 Grade) Lift Well chambers , as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade,including cost of shuttering,reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

4

-

33216

... More
Operation & Maintenance for UGPL Irrigation Network for 217.195 Ha of CCA including CAD network for Five khariff/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material,labour cess, all taxes etc. complete to provide successful irrigation to ayacut 217.195 Ha. as directed by the Engineer-in-Charge.(excluding GST)

217.2

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 406.485 Ha in Junanijore Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

49755.38

-

76.54

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation more than 2.50m. including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

800

-

888.63

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

50555.38

-

18.22

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

49755.38

-

42.38

... More
b) In zones where depth of cutting is more than 2.5m

800

-

389.36

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
DI K7 900 mm DIA

1758.8

-

20933.11

... More
DI K7 750 mm DIA

761.39

-

14636.69

... More
DI K7 700 mm DIA

335.6

-

13008.15

... More
DI K7 600 mm DIA

679.4

-

9268.21

... More
DI K7 500 mm DIA

812.66

-

7118.73

... More
DI K7 400 mm DIA

1476.9

-

5093.63

... More
DI K7 350 mm DIA

311.1

-

4252.85

... More
DI K7 300 mm DIA

1232.33

-

3481.14

... More
DI K7 250 mm DIA

334.85

-

2761.3

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 225 mm DIA

927.24

-

1255.16

... More
HDPE PN6 200 mm DIA

13217.63

-

994.08

... More
HDPE PN6 180 mm DIA

1584.41

-

793.66

... More
HDPE PN6 160 mm DIA

3248.05

-

637.9

... More
HDPE PN6 140 mm DIA

4989.06

-

486.77

... More
HDPE PN6 125 mm DIA

18885.96

-

388.43

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
DI K7 900 mm DIA

1758.8

-

931.5

... More
DI K7 750 mm DIA

761.39

-

542.6

... More
DI K7 700 mm DIA

335.6

-

512.4

... More
DI K7 600 mm DIA

679.4

-

363.2

... More
DI K7 500 mm DIA

812.66

-

270.7

... More
DI K7 400 mm DIA

1476.9

-

213.2

... More
DI K7 350 mm DIA

311.1

-

188.6

... More
DI K7 300 mm DIA

1232.33

-

137.7

... More
DI K7 250 mm DIA

334.85

-

117.1

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 225 mm DIA

927.24

-

314.5

... More
HDPE PN6 200 mm DIA

13217.63

-

282.5

... More
HDPE PN6 180 mm DIA

1584.41

-

282.5

... More
HDPE PN6 160 mm DIA

3248.05

-

205.3

... More
HDPE PN6 140 mm DIA

4989.06

-

176.9

... More
HDPE PN6 125 mm DIA

18885.96

-

159.9

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

53.45

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

2079

-

537.5

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

53.45

-

516.45

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

41

-

34931

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

13

-

35777

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

20

-

34713

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

61

-

11680

... More
b) 1 Ha Outlet

256

-

8249

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 125mm

17

-

15522.25

... More
ii) 150mm

8

-

17239.4

... More
iii) 200mm

16

-

19023

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

3

-

17942.85

3

-

22563.3

... More
100 mm

2

-

28923.67

... More
150 mm

3

-

46105.74

... More
200 mm

2

-

100067.87

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
250 mm

1

-

51768.06

... More
150 mm

11

-

21557.44

... More
300 mm

1

-

68180.05

... More
500 mm

1

-

255185.03

... More
350 mm

2

-

108408.6

... More
400 mm

1

-

157483.14

... More
200 mm

3

-

36656.94

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
125mm

76

-

2854.68

302

-

2854.68

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 125mm

17

-

801.4

... More
ii) 150mm

8

-

1092.6

... More
iii) 200mm

16

-

1426.7

... More
Air Valves

-

-

-

3

-

489.4

3

-

489.4

... More
100 mm

2

-

776

... More
150 mm

3

-

1170.1

... More
200 mm

2

-

1581.7

... More
Sluice Valves

-

-

-

... More
250 mm

1

-

2326.7

... More
150 mm

11

-

1170.1

... More
300 mm

1

-

2795.5

... More
500 mm

1

-

7055.1

... More
350 mm

2

-

3681.7

... More
400 mm

1

-

4844.9

... More
200 mm

3

-

1581.7

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

17

-

44757

... More
Construction of River/Nallah Crossing of the under ground pipe line with RCC lining of pipe &Thrust Block as per the Approved Drawing including cost of Earthwork, RCC, PCC, Reinforcement & Shuttering, including cost of diversion work, including restoration of the Nallah/stream, including dewatering of foundation pit, including cost of all materials, labour, T&P, carriage, including all leads, lifts and delifts, all taxes, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

1

-

92359

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

891.52

-

71.02

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

4.43

-

4017

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

142.63

-

4736.4

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

420.36

-

713

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

35.29

-

10134.65

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

205.01

-

31.3

... More
Construction of Horizontal Thrust Blocks at different location of the distribution network, as per approved Drawings and specifications including Excavation of foundation, dressing and levelling the bed, depositing the surplus excavated material after backfilling away from work site, including all PCC, RCC, reinforcements, shuttering and centering, , including cost of all materials, Carriage, Handling and rehandling, fixing the pipe line in proper position, including all leads, lifts and delifts,including all labour,T&P, machineries etc, including royalty, all taxes (excluding GST), including labour cess, . complete as per the specification and direction in Engineer-in-charge.

22

-

5619

... More
Construction of Precast RCC (M-25 Grade) Lift Well chambers , as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade,including cost of shuttering,reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

19

-

33067

... More
Operation & Maintenance for UGPL Irrigation Network for 406.485 Ha of CCA including CAD network for Five khariff/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material,labour cess, all taxes etc. complete to provide successful irrigation to ayacut 406.485 Ha. as directed by the Engineer-in-Charge.(excluding GST)

406.49

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 33.334 Ha in Katagaon Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

3824.7

-

73.18

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation more than 2.50m. including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

125

-

433.93

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

3949.7

-

17.83

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

3824.7

-

36.88

... More
b) In zones where depth of cutting is more than 2.5m

125

-

226.5

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
DI K7 250MM DIA

111.88

-

2756.78

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 225MM DIA

395.5

-

1253.8

... More
HDPE PN6 200MM DIA

3442.32

-

992.98

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
DI K7 250MM DIA

111.88

-

117.1

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 225MM DIA

395.5

-

314.5

... More
HDPE PN6 200MM DIA

3442.32

-

282.5

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

0.88

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

133

-

781.44

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

0.88

-

516.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

4

-

35087

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

2

-

35933

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

5

-

33216

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

5

-

12687

... More
b) 1 Ha Outlet

16

-

8836

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
200mm

4

-

19023

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

1

-

17942.85

1

-

22563

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

31

-

2854.68

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
ii) 200mm

4

-

1427.1

... More
Air Valves

-

-

-

1

-

489.5

1

-

489.5

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

891.52

-

71

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

4.43

-

4128.8

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

142.63

-

4853.2

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

420.36

-

713

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

35.29

-

10144.32

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

205.01

-

31.3

... More
Operation & Maintenance for UGPL Irrigation Network for 33.334Ha of CCA including CAD network for Five khariff/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material,labour cess, all taxes etc. complete to provide successful irrigation to ayacut 406.485 Ha. as directed by the Engineer-in-Charge.(excluding GST)

33.33

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 463.981 Ha in Baghia Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

50585

-

82.81

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation more than 2.50m. including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

1516.49

-

715.59

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

52102

-

21.29

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

50585

-

45.08

... More
b) In zones where depth of cutting is more than 2.5m

1516.49

-

427.34

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DN 250

812.22

-

2698.85

... More
ii) DN 300

784.81

-

3403.1

... More
iii) DN 350

546.92

-

4148.78

... More
iv) DN 400

618.78

-

4968.76

... More
v) DN 450

3604.65

-

5957.6

... More
vi) DN 500

2366.91

-

6962.65

... More
vii) DN 600

2079.36

-

9060.09

... More
viii) DN 700

1691.8

-

12695.96

... More
ix) DN 750

962.88

-

14324.5

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 110 MM DIA

642.55

-

299.27

... More
HDPE PN6 125 MM DIA

6206.1

-

382.54

... More
HDPE PN6 140 MM DIA

6879.01

-

479.34

... More
HDPE PN6 160 MM DIA

7095.13

-

628.31

... More
HDPE PN6 180 MM DIA

6237.29

-

788.68

... More
HDPE PN6 200 MM DIA

9237.5

-

978.85

... More
HDPE PN6 225 MM DIA

432.34

-

1236.25

... More
HDPE PN6 250 MM DIA

1904.01

-

1523.57

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DN 250

812.22

-

117.1

... More
ii) DN 300

784.81

-

137.7

... More
iii) DN 350

546.92

-

188.6

... More
iv) DN 400

618.78

-

213.2

... More
v) DN 450

3604.65

-

251.2

... More
vi) DN 500

2366.91

-

270.7

... More
vii) DN 600

2079.36

-

363.2

... More
viii) DN 700

1691.8

-

512.4

... More
ix) DN 750

962.88

-

542.6

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 110 MM DIA

642.55

-

141.9

... More
HDPE PN6 125 MM DIA

6206.1

-

159.9

... More
HDPE PN6 140 MM DIA

6879.01

-

176.9

... More
HDPE PN6 160 MM DIA

7095.13

-

205.3

... More
HDPE PN6 180 MM DIA

6237.29

-

282.5

... More
HDPE PN6 200 MM DIA

9237.5

-

282.5

... More
HDPE PN6 225 MM DIA

432.34

-

314.5

... More
HDPE PN6 250 MM DIA

1904.01

-

370.8

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

121.84

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

1351

-

777.04

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

121.84

-

532.6

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

39

-

35380

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

43

-

36240

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

7

-

35159

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

4

-

33497

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

176

-

11785.18

... More
b) 1 Ha Outlet

76

-

8596.05

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 700 mm

1

-

253458

... More
ii) 600 mm

1

-

178400.48

... More
iii) 500 mm

1

-

106662.17

... More
iv) 400 mm

2

-

81096.28

... More
v) 250 mm

1

-

41150.55

... More
vi) 200 mm

5

-

19023.05

... More
vii) 150 mm

23

-

17239.45

... More
viii) 125 mm

5

-

15522.29

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150mm

5

-

46105.74

... More
ii) 100 mm

9

-

28923.67

... More
iii) 80 mm

11

-

22563.3

... More
iv) 50 mm

18

-

17942.85

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150 mm

6

-

21557.44

... More
ii) 200 mm

1

-

36656.94

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

437

-

2854.68

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 700 mm

1

-

12698.3

... More
ii) 600mm

1

-

10333.5

... More
iii) 500mm

1

-

6623.4

... More
iv) 400mm

2

-

4623.06

... More
v) 250mm

1

-

2199.2

... More
vi) 200mm

5

-

1511

... More
vii) 150mm

23

-

1174.9

... More
viii) 125mm

5

-

845.1

... More
Air Valves

-

-

-

... More
i) 150 mm

5

-

763.1

... More
ii) 100 mm

9

-

631.2

... More
iii) 80 mm

11

-

320.2

... More
iv) 50 mm

18

-

320.2

... More
Sluice Valves

-

-

-

... More
i) 150 mm

6

-

1174.9

... More
i) 200 mm

1

-

1511

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

25

-

41094

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

444.44

-

80.9

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

8.62

-

4272.37

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

117.54

-

5102.88

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

213.12

-

713

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

47.48

-

10134.94

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

299.4

-

31.3

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 463.981 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

463.98

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 145.93Ha in Kandaposi Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

6567

-

99.69

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

6567

-

37.65

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

6567

-

56.37

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DN 450

1

-

5893.23

... More
ii) DN 400

197

-

4917.27

... More
iii) DN 350

281

-

4105.87

... More
iv) DN 300

276

-

3370.91

... More
v) DN 250

632

-

2673.11

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 110 MM DIA

38.44

-

297.39

... More
HDPE PN6 125 MM DIA

1786.88

-

380.11

... More
HDPE PN6 140 MM DIA

193.95

-

476.27

... More
HDPE PN6 160 MM DIA

112.04

-

624.35

... More
HDPE PN6 180 MM DIA

992.58

-

783.83

... More
HDPE PN6 200 MM DIA

1690.83

-

972.57

... More
HDPE PN6 225 MM DIA

266

-

1228.45

... More
HDPE PN6 250 MM DIA

98.48

-

1514.03

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DN 450

1

-

251.2

... More
ii) DN 400

197

-

213.2

... More
iii) DN 350

281

-

188.6

... More
iv) DN 300

276

-

137.7

... More
v) DN 250

632

-

117.1

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 110 MM DIA

38.44

-

141.9

... More
HDPE PN6 125 MM DIA

1786.88

-

159.9

... More
HDPE PN6 140 MM DIA

193.95

-

176.9

... More
HDPE PN6 160 MM DIA

112.04

-

205.3

... More
HDPE PN6 180 MM DIA

992.58

-

282.5

... More
HDPE PN6 200 MM DIA

1690.83

-

282.5

... More
HDPE PN6 225 MM DIA

266

-

314.5

... More
HDPE PN6 250 MM DIA

98.48

-

370.8

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

9.76

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

477

-

827.18

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

9.76

-

532.6

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

13

-

34841

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

4

-

35843

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

2

-

34625

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

42

-

11841.57

... More
b) 1 Ha Outlet

51

-

8484.29

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 400 mm

1

-

81096.28

... More
ii) 250 mm

1

-

41150.6

... More
iii) 150 mm

9

-

17239.44

... More
iv) 125 mm

1

-

15522.29

... More
v) 100 mm

1

-

13805.1

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 100 mm

2

-

28923.67

... More
ii) 80 mm

2

-

22563.3

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 80 mm

2

-

10569.65

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

136

-

2854.68

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 400 mm

1

-

4622.9

... More
ii) 250 mm

1

-

2199.1

... More
iii) 150 mm

9

-

1174.9

... More
iv) 125 mm

1

-

853.7

... More
v) 100 mm

1

-

764.9

... More
Air Valves

-

-

-

... More
i) 100 mm

2

-

635.4

... More
ii) 80 mm

2

-

322.3

... More
Sluice Valves

-

-

-

... More
i) 80 mm

2

-

514.9

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

2

-

27696

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

207.26

-

55.07

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

8.62

-

4240.3

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

115.64

-

5002.3

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

576.68

-

694

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

55.22

-

10083.03

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

114

-

31.3

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 145.93 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

145.93

-

1955



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.