Odisha Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Bid Identification No. Occl-mbgp/02/2021-22
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_OCCL_74970_1Bid Award Id
ViewTender No
e-procurement Notice No-15/OCCL/2021-22 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Collecting and stacking at site for premeasurement conveying from stacks and admixing of sand & moorum in proportion (sand 40% & moorum 60%) and laying sub-base in layers not exceeding 100mm thick, watering and compacting to the required density in O.M.C. with slope compactor including cost and conveyance of sub-base materials etc complete. including cost of all labour, labour cess and hire charges of T&P materials required for the work as directed by the Engineer-in-charge.
21340.8
-
888.7
... More
Supplying & Laying 150 GSM non woven geo textile, for separation & filtration purpose below the CGCM, as per the required specifications including all cost of all materials, labour, T&P etc Complete as per site conditions as directed by the Engineer - In - Charge. (The rate includes supply of all hardware materials, pegging, stitching/ Zipping & all other consumables equipments for laying of such material.)
51760.8
-
50.15
... More
Supplying & Laying of Double Layer (Cementious Geo-synthetic Concrete Mattress) CGCM (minimum 100mm thick maximum 120mm thick after filling) with intermittent filter points in both directions, (longitudinal & vertical) to release the pore water pressure made up of Polyester (PET) of mass 380g/m2 and tensile strength of ≥ 50KN/M2 and capacity to withstand the high UV resistance including cost of all materials, labour and track position etc. T&P etc. Complete as per direction of Engineer - In - Charge. The rate of above item includes supply of all hardware materials, pegging, stitching/Zipping & all other consumables equipments for laying of such material excluding cost concrete. (Pre measurement shall be made after layout of mattress at site and actual measurement shall be taken after filling of concrtete inside CGCM after that payment shall be made with allowable maximum shrinkage of 29.35% or as per actual which ever is less)
63764.4
-
1852.5
... More
Providing in position, Plain Cement Concrete (PCC) M-25 gradeinside the CGCM mattress laid through pumping method and the concrete shall be as per Annexure-J of Amendment N0-3 to IS456-2000 (Self Compacting Concrete) with with 10 mm & downgraded crusher broken hard granite chips mixed in batching and mixing plant, transporting mixed concrete by mechanical means including required quantity of mineral admixture by mass of cementitious materials and super plasticizer for workability including cost of all materials, labour and machineries, finishing, curing , clearing the site with all leads, lifts and delifts for all materials as per approved drawings and specifications in canal bed & slope, including cost of construction, maintenance and dewatering of seepage water with all incidental charges including royalty, labour cess etc. complete with construction of cross bonds & ramps as per specification and as per the direction of Engineer-in-Charge. (The measurement shall be made as per actual finished surface area covered with CGCM alongwith concrete with average thickness of 100mm throughout.)
5816.92
-
4573.9
... More
Filling with coarse sand the pannel spaces upto bottom of concrete lining in bed and slope to design level and grade to provide a suitable sand drain below lining, well watered and rammed whereever necessary as per specification and direction of Engineer-in-Charge.
16906.2
-
400.95
... More
Earthwork in all kinds of soil in excavation of foundation trenches with initial lead and lift including rough dressing in layers not exceeding 0.3 mt in depth and the earth transported by transport vehicle including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with initial lead and lifts including dressing and levelling the bed sides upto required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T & P for shoring, shuttering, dewatering if required, T & P etc including cost of labour, labour cess as required for the work complete as directed by the Engineer-in-Charge.
2198.7
-
140.5
... More
Providing and laying Cement Concrete M20 for cut off wall for canal work with 20mm down graded hard granite crusher broken chips from approved quarry free from weathered skin dust and other deleterious materials including mixing in concrete mixer, hoisting and laying concrete with all lead, lifts and delifts and placing over scientifically approved surface, compaction by vibration of concrete by mechanical means supplying T&P including watering and curing for specified days with cost of all materials, carriage, royalty, labour, labour cess etc. hire and running charges machineries dewatering by suitable means, construction of coffer dams/approach roads, diversion roads, diverting the water away from the structure including quality control tests etc. as per the specification and direction of Engineer-in-charge.
2557.85
-
4275.45
... More
Providing and laying cement concrete of grade M15 with 20mm.down graded granite coarse aggregate for concrete lining to the bed of canal with sleeper beams, keys etc.in pannels including supply of all materials, labour and machineries compacting with vibrator by mechanically & manually finishing the concrete surface including trimming and dressing of canal bed including cutting trenches for sleeper beam, keys and drainage etc.including watering and compaction of bed complete as directed by the Engineer-in-charge.
4426.25
-
4260.35
... More
Rigid and smooth centring and shuttering for R.C.C. works including false work and dismantling the same after the required period of casting including cost of all materials, labour, labour cess etc. complete in ground floor. (a) R.C.C. foundation and plinth band, footings, bases of columns mass concrete pre-cast slab etc.
14093
-
105.2
... More
Providing form work for concrete with F1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, labour cess, materials and T & P etc complete as directed by the Engineer-in-charge.
3842.45
-
700.4
... More
Supplying and spreading 20mm down graded granite chips satisfying filter criteria in horizontal filter zones and filter blankets to proper thickness including surface dressing below canal lining etc. complete within initial lead as directed by the Engineer-in-Charge.
1077.11
-
2096.3
... More
Supplying and spreading 40mm to 20mm down graded granite metal filter in horizontal filter zones and filter blankets including levelling etc.complete within initial lead as directed by the Engineer-in-Charge.
756.83
-
1858.7
... More
Providing, fitting & fixing pressure relief valves (PRV) in position with 750mm long x 40mm dia with 5mm thick proforated PVC pipes/stainer (6mm dia perforation) with Neoprene rubber flap in longitudinal drains, cross drains and in pockets of canal slopes and bed at specified locations to release hydrostatic pressures as per approved drawings, specification and direction of Engineer-in-Charge with all leads, lifts and delifts including cost of labour, labour cess, carriage etc complete.
756
-
881.3
... More
Supplying, laying and fixing 160mm dia UPVC drainage pipe including cost, carriage, royalty and taxes of all material etc complete as per direction of the Engineer-in charge.
748.8
-
443.54
... More
Supplying, fitting and fixing protection fencing each of panel 2.50mtr. long and 1.70mtr height vertical above supporting wall top and 300mm inclined at 45 degree made of 2nos 50x50x8mm verical angle posts of 2.50mtr length and 500mm embedded in supporting wall, 3nos. 35x35x5mm horizontal angle (one 200mm above wall top, one at bend point and another at inclied end), 3Nos vertical / inclined flat 35x5mm fitted and welded with 11 gauge 25x25mm square wire mesh with all labour, labour cess, materials and T & P etc complete as directed by the Engineer-in-charge.
6264
-
1792.8
... More
Priming 1 coat (on plastered surface) with any approved primer including cost of primer, labour, labour cess etc. complete.
1872
-
63
... More
Painting two coat with any approved paint (on plastered surface) work including cost of paint and all labour, labour cess etc complete.
1872
-
81.05
... More
Priming 1 coat (on steel surface) with any approved primer including cost of primer, labour, labour cess etc. complete.
3300
-
55.1
... More
Painting two coat with any approved paint on new wood / iron work including cost of paint and all labour, labour cess etc complete.
3300
-
137.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements