Odisha Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 9,74,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Bid Identification No. Occl-dgp/08/2020-21
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_OCCL_66645_1Bid Award Id
ViewTender No
e-procurement Notice No-33/OCCL/2020-21 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil with in lead of 3 km on properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layer to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights etc. complete including labour cess and royalty as per direction of Engineer in charge. (Measurement of the fill to be taken on the finished compacted section under OMC condition.)
18648.25
-
116
... More
Watering earth work up to OMC condition and compaction by sheep foot rollers or vibro roller and dozer or by any other mechanical means in layers not exceeding 22.5 cm to required density to achieve 95% compaction including hire and running charges of all machineries including cost of fuel and lubricants, with cost of mobilisation, demobilisation and all incidental charges, labour cess and royalty to complete the item of work as per direction of the Engineer-in-charge. (measurement to be taken on finished compacted section of the fill under O.M.C. condition)
18648.25
-
36
... More
Providing and placing in position Cement Concrete M20 grade PCC with 40 mm down graded crushed granite stone aggregate mixed in batching and mixing plant, transporting mixed concrete by mechanical means including cost of all materials, labour cess, royalty / taxes, labour and machineries, with required vibrating, finishing, curing , clearing the site with all leads, lifts and delifts for all materials as per approved drawings and specifications in sub–structure and super structure of the flared out walls etc of the Dam,/ Spillway/Head Regulator including cost of construction, maintenance and dismantling of Coffer Dam and dewatering etc complete as directed by the Engineer in charge.
1198.42
-
4838.5
... More
R.C.C work of M25 grade with 20 mm down graded crushed granite stone aggregate mixed in batching and mixing plant, transporting mixed concrete by mechanical means including cost of all materials, labour cess, royalty / taxes, labour and machineries, vibrating, finishing, curing , clearing the site with all leads, lifts and delifts for all materials as per approved drawings and specifications in sub –structure and super structure of the flared out walls etc of the Dam,/ Spillway/Head Regulator including construction, maintenance and dismantling of coffer dam and dewatering etc complete as directed by the Engineer in charge.
6554.27
-
5321.3
... More
Providing, straightening, cutting, bending, binding, laying and placing in position the uncoated HYSD ( Fe-415) grade reinforcement bars including lapping or welding higher diameter bars where necessary with cost, conveyance, labour cess, royalty / taxes of reinforcement bars, binding wire etc with all leads, lifts and delifts as per approved drawings and specifications including cost of construction , maintenance and dismantling of coffer Dam in Dam/ Spillway/Head Regulator etc complete and as directed by the Engineer in charge.
5678.06
-
7068.4
... More
Rough stone dry packing in aprons , revetments and slope to design thickness using 15 cm. to 30 cm. Size hard broken granite stone of approved quality from approved quarry free from weathered skin and any other deleterious materials including filling the interstices with small stones, spalls etc. and wedging with hammer and placing the surface to proper line and level, fixing key stones including dewatering, if any with cost, conveyance and with all leads, lifts and delifts, royalties, labour cess and taxes of all materials and labour, T&P etc complete in all respect as per approved drawing,specification and direction of the Engineer-in-Charge.
252.42
-
1544
... More
Providing weep holes in R.C.C Abutment, flanks, out walls and flank walls etc with 75 mm dia AC pipe extending through the full width of the structure with slope of 1 V: 20 H towards drawing face with non- return flap valves at wall face with its all taxes of all materials with al leads, lifts and delifts, labour cess and royalty etc. complete as per approved drawing, specification and as directed by the Engineer in charge.
110.3
-
103.9
... More
Back filling with sand behind abutment, wing wall and return wall complete including cost, conveyance, royalty and labour cess as per drawing and Technical Specification etc., complete as per direction of the Engineer-in-charge.
1142.63
-
783.9
... More
Rigid and smooth centering and shuttering at all heights of trough and road slab of aqueduct bridge deck slab and soffit slabs using required nos of pylons for vertical supports of scaffolding, centering and suttering with joist, N.G.Rails and channels and shuttering plates including welding, bolting, cost, conveyance, labour cess and all other taxes of all materials and cost of scaffolding, gangways etc. including cost of conveyance of dismantling and disposing debris clear of work site complete to receive reinforcement grills and concrete as per requirement as directed by Engineer-in-Charge.
460.46
-
555.72
... More
Providing form work for concrete with F2 finish for all permanantly exposed surface to public view such as in Concrete Dam , bridge, retaining walls, spillway, Head Regulators with steel shutters or ply wood shutter including supply or rigid tie and supports with all labour, materials, labour cess and T&P complete including finishing complete as directed by Engineer in charge.
8245.44
-
788.3
... More
Providing,fitting,fixing angle iron expansion joints with MS angle of size 75mm x75mm x 6mm thick M.S plate and 12mm dia HYSD bars, including all labour materials, labour cess and T&P complete as directed by Engineer in charge.
98.6
-
2959.78
... More
Providing & fixing 25mm Bitumenous board in construction joints including all labour, materials, labour cess & T&P complete as directed by Engineer in charge.
26.81
-
1334.4
... More
Providing PVC water stop for drainage gallery as per approved design including fixing in proper alignment joining with araldite etc including cost of PVC water stop and all labour, materials, labour cess & and T&P complete as directed by Engineer in charge as directed by the Engineer-in-charge.
237.5
-
1026.7
... More
Providing Tar paper/ Building paper in spillway including cost, conveyance, all taxes, all labour, materials and labour cess with all leads etc. complete. as per the specification drawing and direction of the Engineer-in-charge.
73.53
-
62.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements