Odisha Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 73,732Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
E-procurement Notice No41/occl/2023-24 (on-line)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_OCCL_95997_1Bid Award Id
ViewTender No
E-Procurement Notice No41/OCCL/2023-24 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Erection, Commissioning, Testing of 08(eight) sets of Barrage Bay Gates
54.22
-
-
... More
Erection, Commissioning, Testing of 08(eight) sets of rope drum hoist for 08(eight) sets of Barrage Bay Gates
31.66
-
-
... More
Erection,of Trestles & hoist supporting Structures for 08(eight) sets of rope drum hoist
59.72
-
-
... More
2nd stage concreting of embedded parts of 08(eight) sets of Barrage Bay Gates including hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates.
66.4
-
-
... More
Painting of 08(eight) sets of Barrage Bay Gates after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
720
-
-
... More
Painting of 08(eight) sets of rope drum Hoists for 08(eight) sets Barrage Bay Gates after blast cleaning process performed with as per requirements & class 'B' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint confirming to IS 2932 : 1974 to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
160
-
-
... More
Painting of Hoist supporting structure & Trestles for 08(eight) sets of rope drum Hoists for 08(eight) sets Barrage Bay Gates after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor,painting equiments, labour, other machinery, scaffolding etc. required for painting.
640
-
-
... More
STOPLOGS & LATCH ARRANGEMENTS
-
-
-
... More
Erection of 1 st stage Embedded Parts for 08(eight) Nos. of stoplog grooves for Barrage Bay.
3.88
-
-
... More
Erection of 2nd Stage Embedded Parts for 08(eight) Nos. of stoplog grooves for Barrage Bay.
13.7
-
-
... More
Erection of 03(three) sets of stoplog segments of size 10000mm x 930mm for Barrage Bay.
9.6
-
-
... More
Erection of latch arrangements for 08(eight) sets of Barrage Bay
2.68
-
-
... More
2nd stage concreting of embedded parts for 08(eight) Nos. of stoplog grooves for Barrage Bay by M25 grade concrete using 20mm and down grade agregates.
88
-
-
... More
Painting 03(three) sets of Stoplog segments of size 10000mm x 930mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
180
-
-
... More
Painting of 08(eight) sets of latch arrangements for 08(eight) Nos. of bay after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
64
-
-
... More
LIFTING BEAM, MONORAIL SUPPORTING STRUCTURE AND MONORAIL WALKWAY
-
-
-
... More
Erection of 01(one) set of Lifting Beam
2.39
-
-
... More
Painting of 01(one) set of Lifting Beam after blast cleaning process performed with as per requirements & class C or Class B of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 02 coats of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 microns. The interval between two coats should be 24 hours. The total dry film thickness of all coats including primer coat should not be less than 200 microns. The rate should include higher charges of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting
60
-
-
... More
Erection of 10(ten) set of Monorail supporting structures for 08 (eight) Nos. of Bay
51.25
-
-
... More
Painting of 10(ten) set of Monorail supporting structures after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
1000
-
-
... More
Erection of 08(eight) set of Monorail walkway for 08 (eight) Nos. of Bay
23.84
-
-
... More
Painting of 08(eight) set of Monorail walkway after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
320
-
-
... More
2nd stage concreting of Monorail supporting structures & Monorail walkway for Barrage Bay by M25 grade concrete using 20mm and down grade agregates.
11
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements