Odisha Construction Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Construction Corporation Limited - OCCL Tender

Civil And Construction
Eprocure
Opening Date13 Jun 2022
Closing Date27 Jun 2022
Tender Amount₹ 4,27,71,286 
Notes
Download

Costs

Summary

Bid Identification No. Occl-smp/01/2022-23

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Preparation of bed foundationby wedging & barring in hard rock, removal of loose rock complete with all lifts and delifts and disposal of muck with all leads including dressing and levelling by mechnaical means including carriage, cess & other taxes etc complete with hire & running charges of all machineries, incidental charges, cost of T &P required for completion of the item in all respect

3000

-

1888.2

... More
Excavation of hard rock of all toughness in river bed by mechanical drilling and appropriate blasting (Controlled blasting) with all lifts and delifts, loading into and transportation by transport vehicle and depositing the excavated materials neatly in specified dump yard as directed by Engineer-in-charge and trimming of bed and slope to the design finished section by manually, if necessary including stacking of useful materials (Recovery of useful materials of all sizes will normally be 0.7 cum per cum of excavation measured in dump condition. In case of change of recovery due to rock condition, percentage is to be fixed by Chief Engineer-in-charge) and complete as per the direction of Engineer-in-charge.

4500

-

271.85

... More
Excavation of hard rock of all toughness in river bed by mechanical means (blasting prohibited) and appropriate blasting (Controlled blasting) with all lifts and delifts, loading into and transportation by transport vehicle and depositing the excavated materials neatly in specified dump yard as directed by Engineer-in-charge and trimming of bed and slope to the design finished section by manually, if necessary including stacking of useful materials. (Recovery of useful materials of all sizes will normally be 0.7 cum per cum of excavation measured in dump condition. In case of change of recovery due to rock condition, percentage is to be fixed by Chief Engineer-in-charge) and complete as directed by the Engineer-in-Charge.

38500

-

814.85

... More
Construction of Coffer Dam both side with sand bags with 0.60m thick including cost, conveyance, taxes, cess, royalty, empty cement bags, sand, earth, sewing and laying the sand bags in position in water and dismantling and removing the materials away from the work site after completion of work as per the direction of Engineer-in-Charge

7

-

10000

... More
Construction of Temporary Approach Road as per the specification as approved by the Engineer-in-Charge with cost of all materials, labour, labour cess, royalty, hire & running charges of Machineries et. Complete as per specification and direction of the Engineer-in-Charge.

5

-

20000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.