Odisha Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Bid Identification No. Occl-smp/01/2022-23
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_OCCL_78512_1Bid Award Id
ViewTender No
E-procurement Notice No.05/OCCL/2022-23 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Preparation of bed foundationby wedging & barring in hard rock, removal of loose rock complete with all lifts and delifts and disposal of muck with all leads including dressing and levelling by mechnaical means including carriage, cess & other taxes etc complete with hire & running charges of all machineries, incidental charges, cost of T &P required for completion of the item in all respect
3000
-
1888.2
... More
Excavation of hard rock of all toughness in river bed by mechanical drilling and appropriate blasting (Controlled blasting) with all lifts and delifts, loading into and transportation by transport vehicle and depositing the excavated materials neatly in specified dump yard as directed by Engineer-in-charge and trimming of bed and slope to the design finished section by manually, if necessary including stacking of useful materials (Recovery of useful materials of all sizes will normally be 0.7 cum per cum of excavation measured in dump condition. In case of change of recovery due to rock condition, percentage is to be fixed by Chief Engineer-in-charge) and complete as per the direction of Engineer-in-charge.
4500
-
271.85
... More
Excavation of hard rock of all toughness in river bed by mechanical means (blasting prohibited) and appropriate blasting (Controlled blasting) with all lifts and delifts, loading into and transportation by transport vehicle and depositing the excavated materials neatly in specified dump yard as directed by Engineer-in-charge and trimming of bed and slope to the design finished section by manually, if necessary including stacking of useful materials. (Recovery of useful materials of all sizes will normally be 0.7 cum per cum of excavation measured in dump condition. In case of change of recovery due to rock condition, percentage is to be fixed by Chief Engineer-in-charge) and complete as directed by the Engineer-in-Charge.
38500
-
814.85
... More
Construction of Coffer Dam both side with sand bags with 0.60m thick including cost, conveyance, taxes, cess, royalty, empty cement bags, sand, earth, sewing and laying the sand bags in position in water and dismantling and removing the materials away from the work site after completion of work as per the direction of Engineer-in-Charge
7
-
10000
... More
Construction of Temporary Approach Road as per the specification as approved by the Engineer-in-Charge with cost of all materials, labour, labour cess, royalty, hire & running charges of Machineries et. Complete as per specification and direction of the Engineer-in-Charge.
5
-
20000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements