Odisha Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 96,137Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
E-procurement Notice No. 09 /occl/2023-24 (on-line)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_OCCL_88895_1Bid Award Id
ViewTender No
09 /OCCL/2023-24 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Erection of Barrage Bay vertical fixed wheel gates of size: 9000mm x 3500mm. (06Nos) . including light test for proper sealing.
60.35
-
-
... More
Painting of Barrage Bay vertical fixed wheel gates of size: 9000mm x 3500mm. (06Nos) “after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less black Epoxy Paint applied at an interval of 24 hours between each coat. Each coat should give a minimum dry film thickness of 150 ± 5 microns. The total dry film thickness of all the coats including primer coating should not be less than 350 microns as per IS: 14177:1994 including compressor, paints, thinner, painting equipments, sand, labour, other machinery, scaffolding etc
840
-
-
... More
Erection, Commissioning and Testing of rope drum hoist pertaining to Barrage Bay vertical fixed wheel gates
32.48
-
-
... More
Painting of rope drum hoisting arrangements, hoist supporting structure & trestle(No of sets : 06) and hoist supporting structures & trestle for one double pier,“after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a total dry film thickness of 40 ± 5 microns as per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 micons per each coat. followed by two coats of synthetic enamel paint confirming to IS:2932:1974 to give dry film thickness of 25± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equipments, labour, other machinery, scaffolding etc. required for painting.
950
-
-
... More
Erection of hoist supporting structures & trestle
93.04
-
-
... More
Erection of hoist supporting structures & trestle for one double pier
6.3
-
-
... More
2nd stage concreting of gates, hoist supporting structures & trestle.
72
-
-
... More
Laying and Jointing PVC Pipe. Heading
-
-
-
... More
Erection of 1st stage embedded parts
1.72
-
-
... More
Erection of 2nd stage embedded parts for Under Sluice vertical fixed wheel gates of size: 9000mm x 4500mm. (02 Nos) .
8.17
-
-
... More
Erection of Under Sluice vertical fixed wheel gates of size: 9000mm x 4500mm. (02 Nos) . including light test for proper sealing.
26.98
-
-
... More
Painting of Under Sluice vertical fixed wheel gates of size: 9000mm x 3500mm. (02Nos) “after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less black Epoxy Paint applied at an interval of 24 hours between each coat. Each coat should give a minimum dry film thickness of 150 ± 5 microns. The total dry film thickness of all the coats including primer coating should not be less than 350 microns as per IS: 14177:1994 including compressor, paints, thinner, painting equipments, sand, labour, other machinery, scaffolding etc
360
-
-
... More
Erection, Commissioning and Testing of rope drum hoist pertaining to Under Sluice vertical fixed wheel gates
12.94
-
-
... More
Erection of hoist supporting structures & trestle
31.77
-
-
... More
Erection of Ladder-2Nos(1Set)
2.7
-
-
... More
Painting of rope drum hoisting arrangements, hoist supporting structure & trestle(No of sets : 02) and Ladder-2Nos(1Set),“after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a total dry film thickness of 40 ± 5 microns as per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 micons per each coat. followed by two coats of synthetic enamel paint confirming to IS:2932:1974 to give dry film thickness of 25± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equipments, labour, other machinery, scaffolding etc. required for painting.
398
-
-
... More
2nd stage concreting of gates, hoist supporting structures,trestle & ladder.
26
-
-
... More
Stoplogs for Barrage Bay & undersluice alongwith latch arrangements,( No of leaves:05 & No of Latch:08 )
-
-
-
... More
Erection of 1st stage embedded parts
6.6
-
-
... More
Erection of 2nd stage embedded parts
20.69
-
-
... More
Erection of stop logs for Barrage Bay & Under Sluice
24.1
-
-
... More
Erection of Latch arrangements
2.88
-
-
... More
Final painting of stoplog leaves for Barrage Bay & Under sluice gates. “after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less black Epoxy Paint applied at an interval of 24 hours between each coat. Each coat should give a minimum dry film thickness of 150 ± 5 microns. The total dry film thickness of all the coats including primer coating should not be less than 350 microns as per IS: 14177:1994 including compressor, paints, thinner, painting equipments, sand, labour, other machinery, scaffolding etc"
350
-
-
... More
2nd stage concreting of stoplog leaves.
75.04
-
-
... More
Lifting Beam for Stoplogs for Barrage Bay & undersluice & Monrail, Monorail supporting structure , monorail walkway etc.
-
-
-
... More
Erection of Lifting Beam
6.04
-
-
... More
Erection of Monrail, Monorail supporting structure
53.44
-
-
... More
Erection of Monrail Walkway
51.09
-
-
... More
Painting of Lifting Beam, Monrail, Monorail supporting structure, Monrail Walkway & latch arrangements after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a total dry film thickness of 40 ± 5 microns as per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 micons per each coat. followed by two coats of synthetic enamel paint confirming to IS:2932:1974 to give dry film thickness of 25± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equipments, labour, other machinery, scaffolding etc. required for painting.
230
-
-
... More
2nd stage concreting of Monorail supporting structure , monorail walkway etc.
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements