Odisha Construction Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Construction Corporation Limited - OCCL Tender

Civil And Construction
Irrigation Work
Eprocure
Opening Date18 Jan 2022
Closing Date7 Feb 2022
Tender Amount₹ 46,09,70,536 
Notes
Download

Costs

Summary

Construction Of Under Ground Pipe Line Irrigation System (gravity Flow)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

39669.07

-

39.46

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DN 250mm

675.74

-

2655.58

... More
ii) DN 300mm

1059.13

-

3349.01

... More
iii) DN 350mm

2732.73

-

4076.67

... More
iv) DN 400mm

883.39

-

4882.23

... More
v) DN 600mm

283.04

-

8915.87

... More
vi) DN 700mm

260.83

-

15922.89

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
i) 110mm

113.06

-

296.11

... More
ii) 125mm

25842.42

-

378.46

... More
iii) 140mm

1720.16

-

474.19

... More
iv) 160mm

572.02

-

621.65

... More
v) 180mm

909.21

-

788.4

... More
vi) 200mm

2405.7

-

968.3

... More
vii) 225mm

1304.46

-

1223.14

... More
viii) 250mm

907.21

-

1507.54

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DN 250mm

675.74

-

114.3

... More
ii) DN 300mm

1059.13

-

134.4

... More
iii) DN 350mm

2732.73

-

184

... More
iv) DN 400mm

883.39

-

208.1

... More
v) DN 600mm

283.04

-

354.4

... More
vi) DN 700mm

260.83

-

679.5

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
i) 110mm

113.06

-

137.7

... More
ii) 125mm

25842.42

-

155.2

... More
iii) 140mm

1720.16

-

171.7

... More
iv) 160mm

572.02

-

199.3

... More
v) 180mm

909.21

-

274.3

... More
vi) 200mm

2405.7

-

274.3

... More
vii) 225mm

1304.46

-

305.3

... More
viii) 250mm

907.21

-

360.2

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

17.12

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

853

-

699.16

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

17.12

-

516.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

20

-

32917

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

15

-

33838

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

3

-

32702

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

5

-

31137

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

100

-

10800

... More
b) 1 Ha Outlet

76

-

7752

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 700mm

1

-

253458

... More
ii) 150mm

3

-

17239.4

... More
iii) 125mm

3

-

15522.25

... More
iv) 100mm

13

-

13805.1

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 100mm

1

-

36493.17

... More
ii) 80mm

8

-

28184.96

... More
iii) 50mm

6

-

24932.76

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150mm

1

-

21557.44

... More
ii) 50mm

2

-

7317.45

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

278

-

2855

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 700mm

1

-

12463.6

... More
ii) 150mm

3

-

1158.8

... More
iii) 125mm

3

-

840.7

... More
iv) 100mm

13

-

753.8

... More
Air Valves

-

-

-

... More
i) 100mm

1

-

622

... More
ii) 80mm

8

-

315.9

... More
iii) 50mm

6

-

315.9

... More
Sluice Valves

-

-

-

... More
i) 150mm

1

-

1158.8

... More
ii) 50mm

2

-

315.9

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

44

-

22720

... More
Construction of River/Nallah Crossing of the under ground pipe line with RCC lining of pipe &Thrust Block as per the Approved Drawing including cost of Earthwork, RCC, PCC, Reinforcement & Shuttering, including cost of diversion work, including restoration of the Nallah/stream, including dewatering of foundation pit, including cost of all materials, labour, T&P, carriage, including all leads, lifts and delifts, all taxes, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

3

-

65856

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

235.56

-

72.2

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

8.24

-

3836.53

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

85.56

-

4517.2

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

470.8

-

697.7

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

45.82

-

8629.56

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

137

-

31.26

... More
Construction of Horizontal Thrust Blocks at different location of the distribution network, as per approved Drawings and specifications including Excavation of foundation, dressing and levelling the bed, depositing the surplus excavated material after backfilling away from work site, including all PCC, RCC, reinforcements, shuttering and centering, , including cost of all materials, Carriage, Handling and rehandling, fixing the pipe line in proper position, including all leads, lifts and delifts,including all labour,T&P, machineries etc, including royalty, all taxes (excluding GST), including labour cess, . complete as per the specification and direction in Engineer-in-charge.

9

-

4977.59

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 297.05 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

297.05

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 168.52 Ha in Kalanda Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

19256.2

-

74.13

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

19256.2

-

45.19

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

19256.2

-

41.31

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DN 250mm

589

-

2655.58

... More
ii) DN 350mm

1401

-

4076.67

... More
iii) DN 400mm

983

-

4882.23

... More
iv) DN 450mm

59

-

5849.43

... More
v) DN 600mm

320

-

8915.87

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 225MM DIA

848

-

1223.24

... More
HDPE PN6 200MM DIA

3772

-

968.3

... More
HDPE PN6 180MM DIA

1863

-

788.4

... More
HDPE PN6 160MM DIA

2405

-

621.65

... More
HDPE PN6 140MM DIA

5677

-

474.19

... More
HDPE PN6 125MM DIA

1339.2

-

378.46

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DN 250mm

589

-

114.3

... More
ii) DN 350mm

1401

-

184

... More
iii) DN 400mm

983

-

208.1

... More
iv) DN 450mm

59

-

245.3

... More
v) DN 600mm

320

-

354.4

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 225MM DIA

848

-

305.3

... More
HDPE PN6 200MM DIA

3772

-

274.3

... More
HDPE PN6 180MM DIA

1863

-

274.3

... More
HDPE PN6 160MM DIA

2405

-

199.3

... More
HDPE PN6 140MM DIA

5677

-

171.7

... More
HDPE PN6 125MM DIA

1339.2

-

155.2

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

18.2

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

469

-

873.73

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

18.2

-

516.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

10

-

33648

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

6

-

34945

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

1

-

33462

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

17

-

31837

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

128

-

11121

... More
b) 1 Ha Outlet

40

-

8032

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 125mm

3

-

15522.25

... More
ii) 150mm

4

-

17239.4

... More
iii) 200mm

2

-

19023

... More
iv) 400mm

1

-

81096.3

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
ii) 100mm

2

-

36493.17

... More
ii) 80mm

3

-

28184.96

... More
iii) 50mm

1

-

24932.76

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150mm

1

-

21557.44

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

313

-

2855

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 125mm

3

-

841.2

... More
ii) 150mm

4

-

1159.7

... More
iii) 200mm

2

-

1487.7

... More
iv) 400mm

1

-

4550.81

... More
Air Valves

-

-

-

... More
i) 100mm

2

-

622

... More
ii) 80mm

3

-

315.9

... More
iii) 50mm

1

-

315.9

... More
Sluice Valves

-

-

-

... More
i) 150mm

1

-

1159.7

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

6

-

28687

... More
Construction of River/Nallah Crossing of the under ground pipe line with RCC lining of pipe &Thrust Block as per the Approved Drawing including cost of Earthwork, RCC, PCC, Reinforcement & Shuttering, including cost of diversion work, including restoration of the Nallah/stream, including dewatering of foundation pit, including cost of all materials, labour, T&P, carriage, including all leads, lifts and delifts, all taxes, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

1

-

66141.8

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing ,including loading,unloading and carriage within a lead of 1 km , with all leads, lifts and delifts , including cost of all labour, machinaries ,T&P including all taxes, labour cess , etc. (Excluding GST) complete as per the approved drawing, specification and the directions of the Engineer-in-Charge

183.05

-

77.87

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

4.12

-

4377.5

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

37.66

-

5058.17

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

226.61

-

697.7

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

20.41

-

8629.56

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

114.4

-

31.3

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 168.52 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

168.52

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 84.66 Ha in Jiranga Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

13732

-

72.19

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

13732

-

40.81

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

13732

-

40.47

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DI K7 500MM DIA

250.77

-

6854.48

... More
ii) DI K7 450MM DIA

71.42

-

5849.43

... More
iii) DI K7 400MM DIA

450.05

-

4882.23

... More
iv) DI K7 350MM DIA

214.86

-

4076.67

... More
v) DI K7 300MM DIA

798.67

-

3349.01

... More
vi) DI K7 250MM DIA

272.62

-

2655.58

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 225MM DIA

1636.25

-

1223.14

... More
HDPE PN6 200MM DIA

4676.68

-

968.3

... More
HDPE PN6 180MM DIA

1471.16

-

788.4

... More
HDPE PN6 160MM DIA

1570.16

-

621.65

... More
HDPE PN6 140MM DIA

1394.17

-

474.19

... More
HDPE PN6 125MM DIA

925.19

-

378.46

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DI K7 500MM DIA

250.77

-

264.1

... More
ii) DI K7 450MM DIA

71.42

-

245.3

... More
iii) DI K7 400MM DIA

450.05

-

208.1

... More
iv) DI K7 350MM DIA

214.86

-

184

... More
v) DI K7 300MM DIA

798.67

-

134.4

... More
vi) DI K7 250MM DIA

272.62

-

114.3

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 225MM DIA

1636.25

-

305.3

... More
HDPE PN6 200MM DIA

4676.68

-

274.3

... More
HDPE PN6 180MM DIA

1471.16

-

274.3

... More
HDPE PN6 160MM DIA

1570.16

-

199.3

... More
HDPE PN6 140MM DIA

1394.17

-

171.7

... More
HDPE PN6 125MM DIA

925.19

-

155.2

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

15.55

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

261

-

1045.95

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

15.55

-

516.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

8

-

33792

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

7

-

35208

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

25

-

31963

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

1

-

33606

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

30

-

11211

... More
b) 1 Ha Outlet

28

-

8185

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 500mm

1

-

106662.2

... More
i) 200mm

1

-

19023

... More
iii) 150mm

6

-

17239.4

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 80mm

4

-

28184.96

... More
ii) 50mm

3

-

24932.76

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150mm

1

-

21557.44

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

113

-

2855

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 500mm

1

-

6506.8

... More
ii) 200mm

1

-

1486.8

... More
iii) 150mm

6

-

1158.8

... More
Sluice Valves

-

-

-

... More
i) 150mm

1

-

1158.8

... More
Air Valves

-

-

-

... More
i) 80mm

4

-

315.9

... More
ii) 50mm

3

-

315.9

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

8

-

33979

... More
Construction of River/Nallah Crossing of the under ground pipe line with RCC lining of pipe &Thrust Block as per the Approved Drawing including cost of Earthwork, RCC, PCC, Reinforcement & Shuttering, including cost of diversion work, including restoration of the Nallah/stream, including dewatering of foundation pit, including cost of all materials, labour, T&P, carriage, including all leads, lifts and delifts, all taxes, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

1

-

56811.99

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

-

-

-

... More
(a) Excavation of AKS

91.38

-

46.9

... More
(b) Excavation of DI Rock

1.12

-

60.4

... More
(c) Excavation of hard rock

0.28

-

230.5

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

4.31

-

4282.81

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

61.18

-

4959.1

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

311

-

697.7

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

29.08

-

8613.46

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

43.2

-

31.3

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 84.66 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

84.66

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 293.57 Ha in Sankhabhanga Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

30161.4

-

70.93

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation more than 2.50m. including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

671.08

-

733.67

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

30832.48

-

30.03

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

30161.4

-

40

... More
b) In zones where depth of cutting is more than 2.5m

671.08

-

393.79

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DN 250mm

208.68

-

2725.69

... More
ii) DN 300mm

468.39

-

3436.64

... More
iii) DN 350mm

457.48

-

4193.51

... More
iv) DN 400mm

211.72

-

5022.44

... More
v) DN 450mm

908.39

-

6024.7

... More
vi) DN 500mm

736.17

-

7029.74

... More
vii) DN 800mm

712.96

-

16273.42

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 250MM DIA

449.64

-

1533.51

... More
HDPE PN6 225MM DIA

1225.63

-

1244.38

... More
HDPE PN6 200MM DIA

2821.09

-

985.4

... More
HDPE PN6 180MM DIA

4673.93

-

805.5

... More
HDPE PN6 160MM DIA

4402.21

-

632.44

... More
HDPE PN6 140MM DIA

6697.28

-

482.53

... More
HDPE PN6 125MM DIA

6858.91

-

385.07

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DN 250mm

208.68

-

114.3

... More
i) DN 300mm

468.39

-

134.4

... More
i) DN 350mm

457.48

-

184

... More
i) DN 400mm

211.72

-

208.1

... More
i) DN 450mm

908.39

-

245.3

... More
vi) DN 500mm

736.17

-

264.1

... More
vii) DN 800mm

712.96

-

679.5

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 250MM DIA

449.64

-

360.2

... More
HDPE PN6 225MM DIA

1225.63

-

305.3

... More
HDPE PN6 200MM DIA

2821.09

-

274.3

... More
HDPE PN6 180MM DIA

4673.93

-

274.3

... More
HDPE PN6 160MM DIA

4402.21

-

199.3

... More
HDPE PN6 140MM DIA

6697.28

-

171.7

... More
HDPE PN6 125MM DIA

6858.91

-

155.2

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

29.21

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

754

-

841.67

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

29.21

-

516.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

22

-

33668

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

8

-

34620

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

10

-

31847

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

1

-

33481

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

107

-

11037

... More
b) 1 Ha Outlet

41

-

7953

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 800mm

1

-

365142.1

... More
ii) 500mm

4

-

106662.2

... More
iii) 350mm

1

-

65556.8

... More
iv) 200mm

4

-

19023

... More
v) 150mm

9

-

17239.4

... More
vi) 125mm

3

-

15522.25

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150mm

1

-

64765.24

... More
ii) 100mm

1

-

36493.17

... More
iii) 80 mm

2

-

28184.96

... More
iv) 50 mm

4

-

24932.76

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150 mm

1

-

21557.44

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

265

-

2855

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 800 mm

1

-

17090

... More
ii) 500 mm

4

-

6455.9

... More
iii) 350mm

1

-

3398.5

... More
iv) 200 mm

4

-

1473.8

... More
v) 150mm

9

-

1146.2

... More
vi) 125mm

3

-

832.6

... More
Air Valves

-

-

-

... More
i) 150 mm

1

-

19115.3

... More
ii) 100 mm

1

-

11620.7

... More
iii) 80mm

2

-

9286.8

... More
iv) 50 mm

4

-

313.8

... More
Sluice Valves

-

-

-

... More
i) 150 mm

1

-

1146.2

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

18

-

34271

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

224.14

-

79.81

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

4.12

-

4146.1

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

37.88

-

4851.8

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

191.48

-

697.7

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

20.64

-

8585.95

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

141.8

-

31.3

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 293.57 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

293.57

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 522.34 Ha in Tileye Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

56073.6

-

77.77

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation more than 2.50m. including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

548.68

-

1069.08

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

56622.3

-

27.52

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

56073.6

-

43.09

... More
a) In zones where depth of cutting is less than equal to 2.5m

548.68

-

606.34

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DN 250mm

1390.27

-

2735.25

... More
ii) DN 300mm

482.22

-

3448.59

... More
iii) DN 350mm

642.5

-

4209.45

... More
iv) DN 400mm

1839.98

-

5041.56

... More
v) DN 450mm

577.87

-

6048.59

... More
vi) DN 500mm

1145.76

-

7053.64

... More
vii) DN 600mm

806.76

-

9181.42

... More
viii) DN 700mm

503.66

-

12877.95

... More
ix) DN 750mm

2902.45

-

14506.49

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 225MM DIA

506.55

-

1247.28

... More
HDPE PN6 200MM DIA

7296.56

-

987.73

... More
HDPE PN6 180MM DIA

5335.87

-

807.83

... More
HDPE PN6 160MM DIA

8023.73

-

633.91

... More
HDPE PN6 140MM DIA

12237.82

-

483.67

... More
HDPE PN6 125MM DIA

12929.99

-

385.98

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DN 250mm

1390.27

-

114.3

... More
ii) DN 300mm

482.22

-

134.4

... More
iii) DN 350mm

642.5

-

184

... More
iv) DN 400mm

1839.98

-

208.1

... More
v) DN 450mm

577.87

-

245.3

... More
vi) DN 500mm

1145.76

-

264.1

... More
vii) DN 600mm

806.76

-

354.4

... More
viii) DN 700mm

503.66

-

594.6

... More
ix) DN 750mm

2902.45

-

623.8

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 225MM DIA

506.55

-

305.3

... More
HDPE PN6 200MM DIA

7296.56

-

274.3

... More
HDPE PN6 180MM DIA

5335.87

-

274.3

... More
HDPE PN6 160MM DIA

8023.73

-

199.3

... More
HDPE PN6 140MM DIA

12237.8

-

171.7

... More
HDPE PN6 125MM DIA

12930

-

155.2

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

49.8

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

1341

-

808.33

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

49.8

-

516.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

39

-

33306

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

22

-

34227

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

17

-

31510

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

2

-

33089

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

192

-

11018

... More
a) 2 Ha Outlets

76

-

8048

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 700mm

4

-

253458

... More
ii) 400mm

2

-

81096.3

... More
iii) 250mm

2

-

41150.6

... More
iv) 200mm

1

-

19023

... More
v) 150mm

18

-

17239.4

... More
vi) 125mm

9

-

15522.25

... More
vii) 100mm

3

-

13805.1

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150mm

8

-

64765.24

... More
ii) 100mm

7

-

36493.17

... More
iii) 80mm

5

-

28184.96

... More
iv) 50mm

2

-

24932.76

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150 mm

1

-

19682.88

... More
ii) 50 mm

1

-

7317.45

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

477

-

2855

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 700 mm

4

-

12365.6

... More
ii) 400 mm

2

-

4505.6

... More
iii) 250 mm

2

-

2143.7

... More
iv) 200 mm

1

-

1473.2

... More
v) 150 mm

18

-

1145.5

... More
vi) 125 mm

9

-

832.2

... More
vii) 100 mm

3

-

745.6

... More
Air Valves

-

-

-

... More
i) 150 mm

8

-

749.5

... More
ii) 100 mm

7

-

617.8

... More
iii) 80 mm

5

-

313.8

... More
iv) 50 mm

2

-

313.8

... More
Sluice Valves

-

-

-

... More
i) 150 mm

1

-

1145.6

... More
ii) 50 mm

1

-

471.9

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

33

-

37105.64

... More
Construction of River/Nallah Crossing of the under ground pipe line with RCC lining of pipe &Thrust Block as per the Approved Drawing including cost of Earthwork, RCC, PCC, Reinforcement & Shuttering, including cost of diversion work, including restoration of the Nallah/stream, including dewatering of foundation pit, including cost of all materials, labour, T&P, carriage, including all leads, lifts and delifts, all taxes, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

2

-

82822

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

1010.93

-

85.1

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

8.49

-

4068.93

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

138.7

-

4790.04

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

338.65

-

697.7

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

46.69

-

8635.39

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

709.4

-

31.3

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 522.34 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

522.34

-

1955

... More
Execution of under ground pipe line (UGPL) system for a total CCA of 332.787 Ha in Phatatangar Minor Irrigartion Projects on percentage rate basis including pre construction survey, execution as per planning & design, testing of pipe materials, providing & laying with DI pipes (DI or = 250mm dia) Ductile Iron class- K7 and K9 as per relevant IS code as per approved Drawing , with suitable jointing materials for stiffness class 2500 N/M2 as per IS-12709 & IS-14402 and High Density Polyethylene (HDPE) pipes of class PE-100, PN 6,PN8,PN10 and PN12.5 as per Aproved Drawing , as per relevant IS code (HDPE pipe internal dia 250mm) having test pressure of approved standard for Pipe network as specified in technical specification, including D.I Air valves, , Butterfly valves, Sluice Valves, Reducers,Tee, Cross and Bend of matching materials, nuts & bolts of required sizes & specification and of approved make and quality and other construction materials including cost of all materials labour charges, all taxes, labour cess, Excluding GST, loading & unloading charges, transportation charges, cost of lowering, laying and jointing to proper allignment and position including earth work in excavation of trenches in all kinds of soils, D.I, Rock strata and with sand cushion of approved thickness for pipes and proper compaction of back filled earth and borrow earth in layers and including cost of Cement Concreting / R.C .C of approved grades, NP3 Hume Pipes of required diameter, Flush Structures and Turnout structures at required locations as per Approved Drawing etc. complete with all other ancillary works to complete the pipe network for providing irrigation at each ha. of CCA as per specification and direction of the Engineer-in-charge.

-

-

-

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation up to 2.50m.including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

36666.82

-

81.93

... More
Earthwork in excavation in Trenches by mechanical means for laying Ductile Iron (D.I )/ HDPE Pipes of different sizes in the UGPL Distribution Network in all kinds of Soil, including Stoney earth,gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) for depth of excavation more than 2.50m. including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per specification and the directions of the Engineer - in- charge.

125

-

474.72

... More
Filling the excavated trench with 150 mm thick sand free from silt and organic materials suitably spread to uniform thickness in rock & D.I. zone of the excavated trench for laying D.I./ H.D.P.E. Pipes over it with cost of all materials including royalties, labour cess, including cost of transportation, with all leads and lifts/delifts,including loading, un-loading , handling, rehandling and T&P etc.(excluding GST) complete as per specification and the directions of the Engineer- in - charge.

36791.82

-

32.87

... More
Backfilling the excavated trenches, after laying of D.I./H.D.P.E. Pipes, with suitable excavated materials(Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required ,including disposal of the surplus excavated earth away from work site with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

-

-

-

... More
a) In zones where depth of cutting is less than equal to 2.5m

36666.82

-

40.21

... More
a) In zones where depth of cutting is less than equal to 2.5m

125

-

207.41

... More
Procurement and supply of centrifugally cast (spun) Ductile Iron pressure pipes with Spigot and Socket ended class K7 Pipes suitable for (push on type) Rubber Gasket jointing conforming to IS:8329-2000 (latest Revision) with inside Factory- centrifugally-applied cement mortar lining ( Slag Cement) and external Zinc coating followed by a finishing layer of Bitumen coating duely ISI marked including cost of EPDM Gasket complete including cost of pipe, cost of testing, inspection charges etc. transportation to work site, stacking at site, loading, un-loading, handling, rehandling, labour cess, including all taxes , duties, insurance, etc. (excluding GST) complete as per the specification and directions of the Engineer-in -charge; for the following nominal diameters

-

-

-

... More
i) DI K7 800 mm dia

2709.44

-

16254.3

... More
ii) DI K7 600 mm dia

849.8

-

9136.81

... More
iii) DI K7 500 mm dia

875.29

-

7020.18

... More
iv) DI K7 450 mm dia

144.2

-

6015.14

... More
v) DI K7 400 mm dia

707.5

-

5014.79

... More
vi) DI K7 350 mm dia

654.2

-

4187.14

... More
vii) DI K7 300 mm dia

582.24

-

3431.86

... More
viii) DI K7 250 mm dia

603.18

-

2721.87

... More
Procurement and supply of High Density Polyethylene ( HDPE) pipes of material grade PE 100 with pressure rating PN 6 conforming to IS:4984-2016 ( latest Revision) duly ISI marked, of standard length, including cost of pipes , cost of testing, inspection charges, transportation to work site, stacking at site with local handling and rehandling, including loading and un- loading, labour cess, including all taxes, duties, insurance, etc. (excluding GST) complete in all respect as per the specification and directions of the Engineer-in-charge; for the following nominal diameters.

-

-

-

... More
HDPE PN6 225MM DIA

675

-

1243.22

... More
HDPE PN6 200MM DIA

5066.39

-

984.47

... More
HDPE PN6 180MM DIA

5588.43

-

787.3

... More
HDPE PN6 160MM DIA

4598.61

-

631.85

... More
HDPE PN6 140MM DIA

2188.64

-

482.08

... More
HDPE PN6 125MM DIA

11548.9

-

384.71

... More
Labour for laying D.I. pipes in the excavated trenches to required level and grade, with proper jointing, including cost of all materials, labour, machineries, T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc. (excluding GST) complete including all lifts and delifts, as per the specifications and directions of the Engineer- in-charge. For the following nominal Diameters;

-

-

-

... More
i) DI K7 800mm dia

2709.44

-

678.2

... More
ii) DI K7 600mm dia

849.8

-

353.5

... More
iii) DI K7 500mm dia

875.29

-

263.5

... More
iv) DI K7 450mm dia

144.2

-

244.6

... More
v) DI K7 400mm dia

707.5

-

207.6

... More
vi) DI K7 350mm dia

654.2

-

183.6

... More
vii) DI K7 300mm dia

582.24

-

134.1

... More
viii) DI K7 250mm dia

603.18

-

114

... More
Labour for fixing & laying H.D.P.E. pipes with its fittings & Specials including Ball valves in the excavated trenches, proper to required level and grade with proper jointing of pipes having electro fusion jointing systems, including cost of all materials, labour,machinaries, equipment,T&P, with all taxes, including transportation of pipes to worksite from the staking yard, handling, rehandling, loading, un-loading & labour cess, etc.(excluding GST) complete including all lifts and delifts, as per the specifications and directions of Engineer- in-charge. for the following nominal Diameters;

-

-

-

... More
HDPE PN6 225MM DIA

675

-

305.3

... More
HDPE PN6 200MM DIA

5066.39

-

274.3

... More
HDPE PN6 180MM DIA

5588.43

-

274.3

... More
HDPE PN6 160MM DIA

4598.61

-

199.3

... More
HDPE PN6 140MM DIA

2188.64

-

171.7

... More
HDPE PN6 125MM DIA

11548.9

-

155.2

... More
Supply of D.I. Pipe Fittings required for proper alignment of pipe lines as per approved drawing such as bends, Tees, reducers, Cross etc of required specification , at work site, including cost of materials, carriage, labour, all taxes ,labour cess & duties, loading, un- loading, handling, rehandling, etc.(excluding GST) complete as per the specification and directions of the Engineer-in charge.

45.11

-

14118.36

... More
Supply of H.D.P.E. Pipe Fittings required for proper alignment of pipe line as per approved drawing ,such as bends, Tees, Reducers, Cross etc of required specifications, at work site, including cost of materials, carriage, labour, all taxes , labour cess & duties, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge.

1477

-

526.54

... More
Labour for fitting & fixing of all D.I. pipe fittings such as Bends, Tees, Reducers, cross etc at required location of D.I. pipe line Network in the trenches as per the Approved specifications and Drawing including all machineries, sundries, T&P, carriage of fittings, loading, unloading, handling, rehandling, etc. at work site including all lifts and delifts, with all taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of the Engineer-in-charge.

45.11

-

500.5

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Butter Fly Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

35

-

33207

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Air Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

19

-

34159

... More
Construction of Precast RCC (M-25 Grade) Valve chambers for Sluice Valves, of different sizes, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

3

-

32989

... More
Construction of Precast RCC (M-25 Grade) Outlet chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard with RCC M25 grade, including cost of shuttering, reinforcement, all materials complete, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P, including all lifts and delifts, including royalties, taxes of all materials, labour cess, etc. (excluding GST) complete as per the specification and directions of the Engineer-in-charge.

-

-

-

... More
a) 2 Ha Outlets

50

-

10948

... More
a) 2 Ha Outlets

164

-

7786

... More
Supply of D.I. Double Flanged (short body) Butter Fly Valve with EPDM liner conforming to IS:13095-2020 (latest version) with Stainless Steel shaft and pin with manual operation & required specifications at work site including testing and inspection charges, including cost of materials & all fittings, Specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge For the following sizes.

-

-

-

... More
i) 125mm

8

-

15522.25

... More
ii) 150mm

21

-

17239.4

... More
iii) 200mm

6

-

19023

... More
Supply of D.I. Tamper Proof Combination Air Valve PN 1.0 conforming to IS:14845-2000( latest revision) as per mfg.std with isolating Sluice valve as per Sluice Valve specifications, at work site, including cost of materials, all fittings, specials, all taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 150mm

8

-

64765.2

... More
ii) 100mm

3

-

36493.2

... More
iii) 80mm

3

-

28185

... More
iv) 50mm

5

-

24932.8

... More
Supply of D.I. Double Flanged gland-less Sluice Valve of PN-1.0 (IS:14846- 2000 Latest version) with non rising Stainless Steel spindle and EPDM Liner stem seal of required specifications as Scour Valve at work site, including testing and inspection charges, including cost of materials, all fittings and specials, all insurance, taxes & duties, transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 300 mm

1

-

68180.1

... More
ii) 80 mm

2

-

10569.7

... More
Supply of HDPE Ball Valves of material PE100 pressure rating PN 6.0 of required specifications to site of work, including testing and inspection charges, including cost of materials, all fittings and specials, all taxes, insurances & duties, stacking at site transportation, loading, un- loading, handling, rehandling, etc. (excluding GST) complete as directions of the Engineer-in charge. For the following sizes.

-

-

-

... More
i) 125mm

31

-

2854.7

... More
ii) 110mm

233

-

2854.7

... More
Labour for fittings & fixing of different sizes of D.I. Butterfly valves, D.I. Air valves, D.I. Sluice valve, HDPE Ball valve as per the Approved specifications and Drawing at required designated location of the underground pipe line laid in the trenches including all materials, sundries, T&P,including all lifts and delifts, loading, unloading, handling, rehandling with all Taxes, duties, labour cess, etc. (excluding GST)complete as per the specification and directions of Engineer-in-charge for the following sizes.

-

-

-

... More
Buterfly valves

-

-

-

... More
i) 125 mm

8

-

828.4

... More
iI) 150 mm

21

-

1139.5

... More
iII) 200 mm

6

-

1467.1

... More
Air Valves

-

-

-

... More
i) 150 mm

8

-

1214.6

... More
iI) 100 mm

3

-

801.9

... More
iII) 80 mm

3

-

500

... More
iv) 50 mm

5

-

500

... More
Sluice Valves

-

-

-

... More
i) 300 mm

1

-

2841.4

... More
iI) 80 mm

2

-

500

... More
Construction of Road Crossing such as SH/MDR/ODR/VR etc. for the under ground pipe line with the pipe line laid inside RCC NP- 3 Hume Pipe of Diameter minimum 300mm larger than the outer Diameter of distribution pipe line, below the road as per the Approved Drawing with minimum 1.50m.earth cover above the top of RCC Hume Pipe up to the road surface, including cost of diversion of traffic, including cost of restoration of dismantled road work, with cost & carriage of RCC NP-3 Hume Pipe, all leads, lifts and delifts, including cost of excavation, all materials, carriage, handling, rehandling, laying and aligning of the RCC Hume Pipe including all taxes, labour cess, etc. (excluding GST) complete as per the specifications and directions of the Engineer-in-charge.

10

-

43051

... More
Construction of River/Nallah Crossing of the under ground pipe line with RCC lining of pipe &Thrust Block as per the Approved Drawing including cost of Earthwork, RCC, PCC, Reinforcement & Shuttering, including cost of diversion work, including restoration of the Nallah/stream, including dewatering of foundation pit, including cost of all materials, labour, T&P, carriage, including all leads, lifts and delifts, all taxes, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

1

-

72477

... More
Construction of Horizontal Thrust Blocks at different location of the distribution network, as per approved Drawings and specifications including Excavation of foundation, dressing and levelling the bed, depositing the surplus excavated material after backfilling away from work site, including all PCC, RCC, reinforcements, shuttering and centering, , including cost of all materials, Carriage, Handling and rehandling, fixing the pipe line in proper position, including all leads, lifts and delifts,including all labour,T&P, machineries etc, including royalty, all taxes (excluding GST), including labour cess, . complete as per the specification and direction in Engineer-in-charge.

26

-

5585.78

... More
Construction of Intake Well Chamber near the existing Diversion Weir to facilitate off taking of the Distribution network Main Pipe including cost of excavation of foundation by mechanical means, including all RCC work, PCC work, as per the Approved Drawing including cost of fixing the off taking pipe and silt excluder pipe, including cost of RCC Cover Slab of the intake Well Chamber with man-holes, including fixing of the Galvanised rungs all complete as per the Approved Drawings, including all materials, labour, T&P,HYSD Reinforcement, Shoring, Centring and Shuttering, including all leads, lifts and delifts, including disposal of surplus earth away from work site, levelling and finishing the work site, including all taxes, royalties, labour cess(excluding GST), with transportation, handling and rehandling of all materials, complete as per the specifications and direction of Engineer-in-charge (Payment to be made through following items of work)

-

-

-

... More
Excavation of Foundation of Intake well by mechanical means in all kinds of Soil, including Stoney earth, gravel,moorum, D.I. Rock, fractured rock, soft rock, laterite rock, Hard Rock, etc. with use of Rock Breaker or suitable machineries & equipment (blasting is not allowed) as per the approved drawing, including loading ,unloading and carriage within a lead of 1Km, with all leads, lifts and delifts,including cost of all labour, machineries, T&P including all taxes, labour cess, etc. (excluding GST) complete as per approved drawing, specification and the directions of the Engineer - in- charge.

891.52

-

71.01

... More
Providing PCC M15 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area , as per approved drawing, to proper level and thickness, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per the specification and direction of Engineer-in-charge.

4.43

-

4146.1

... More
Providing RCC M25 concrete with 20mm downgraded crusher broken hard granite chips and suitable sand free from silt and clay, cement 43 grade of approved manufacturer, properly mixed in a concrete mixer, laying in designated area to proper level and thickness, as per approved drawing, with proper compaction, including cost of all materials, carriage of all materials and royalty, entering, shuttering, dismantling the shuttering after specified period, including curing, including all leads, lifts, delifts, labours, including all taxes, labour cess (Excluding GST) etc complete as per approved drawing, the specification and direction of Engineer-in-charge.

142.63

-

4837.56

... More
Providing rigid and smooth centering and shuttering to all concrete works , PCC and RCC, as per approved drawings, for F1 finish of the concrete surfaces, for all heights, including cost of all shuttering and centering materials, including dismantling of the centering and shuttering after specified period, including carriage, handling and rehandling, all leads, lifts and delifts, all taxes, labour cess etc (excluding GST) complete as per approved drawing, specification and direction of Engineer-in-Charge.

420.36

-

697.7

... More
Providing HYSD bars for Reinforcement, cutting, bending and binding the reinforcement bars to proper grill as per the approved drawing, including cost and carriage of HYSD bars to work site, including cost of binding wire, all labour ,T&P etc, complete to receive the concrete, including all taxes, labour cess etc (excluding GST), including all leads, lifts and delifts, handling and rehandling as per the approved drawing, specification and Engineer-in- Charge.

35.29

-

8508.91

... More
Backfilling the excavated foundation, after completion of the intake structure, with suitable excavated materials (Top 0.6m depth shall be suitable for cultivation) in layers and compacting the same by rammers, including borrowing of earth wherever required , including disposal of the surplus excavated earth away from work site, finishing the site clean, with all leads, lifts and delifts, including all labour, carriage, cost of borrow earth, T&P, all taxes, labour cess, cost of transportation, loading, un-loading, handling, rehandling, etc. (excluding GST) complete as per the specification and directions of the Engineer- in- charge.

205.01

-

31.4

... More
Construction of Precast RCC (M-25 Grade) Lift Well Chambers, as per Approved Drawing including cost of excavation of chamber pit, cost of PCC (M- 15 Grade) for base of the chamber, cost and carriage of all materials, including precasting at casting yard, transporting the precast unit to designated work site and placing in position as per the Approved Drawing with all labour, T&P,including all lifts and delifts, including royalities, taxes of all materials, labour cess, etc. (excluding GST) complete as per the directions of the Engineer-in-charge.

7

-

31411

... More
Operation & maintenance cost for 5(five) years for UGPL irrigation network for providing smooth and uninterrupted irrigation to 332.787 ha. @ ` 1955.00 per Ha (Approved by DoWR for Lower Indra Irrigation Project.) (Excluding GST) including CAD network for Five kharif/five Rabi crop season which ever is later after commissioning UGPL Irrigation system including cost of all material, labour cess, all taxes etc. complete to provide successful irrigation to the ayacut area as directed by the Engineer-in-Charge.

332.79

-

1955



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.