Odisha Construction Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 17,35,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Bid Identification No. Occl-jgp/02/2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OCCL_102749_1Tender No
E-Procurement Notice No.67/OCCL/2023-24 (on-line)Tender Authority
Odisha Construction Corporation Limited ViewPurchaser Address
-Website
http://https://odishaconstruction.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation of drain in both wet & dry condition by mechanical means in all kinds of soil including slushy soil requiring the aid of pans. and vessels, rough dressing and leveling the excavated canal / drain slopes and bed to design section and depositing the excavated materials in spoil bank or in any other specified area to proper section with all leads, lifts, delift, handling, rehandling and dewatering etc. complete with all taxes, T&P, Cess etc. including mobilization and 'demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer-in-Charge. (Bed width within 8 mtr.)
117685.16
4189591
35.6
... More
Desiltation by dredging from river / nallah for depths varying from 1.00 m to 3.00m including fixing of pipelines, floaters and floating pipelines for disposing of water slurry consisting silt and sand etc upto a distance of 1500m. The rate shall include the cost of labour, materials, consumables, POL, spare parts and accessories required to keep dredger in running condition, maintenance of dredgers, T&P etc including building in the island by providing geo tubes and accessories or by tin sheets for formation of bund for dumping of dredged material with all lead and lift including all taxes etc. as per the direction of the Engineering – in – charge. The job includes all pre and post dredging surveys for payment purpose.
241941.31
59154649
244.5
... More
(B) CONSTRUCTION OF STRUCTURES
-
-
-
... More
Earth work Excavation of foundation in ordinary soil with one extra lift over the initial lead of 50 m and 1.5m initial lift includind dressing the slope, breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth as per direction of the Engineer-in-charge
10588.08
1875148
177.1
... More
Excavation of any approved type of soil in approved borrow area by mechanicals means loading into and transportation by mechanical means and unloading the soil with 5 KM lead on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of houl road and borrow area etc. complete as per the direction of Engineer-in-charge.
5760.91
622178
108
... More
Reinforcement Cement Concrete M-20 grade with 20 mm and down graded crusher broken hard granite chips and mixing by concrete mixture and compacting with vibrator with initial lead of 50m and lift of 1.5m including all cost, royalty and conveyance of materials complete as directed by the Engineer-in-Charge.
3380.48
23197191
6862.1
... More
Providing cast-in-situ double under reamed R.C.C pile of 375mm dia driving to a depth of 5.0 M long Pile foundtion with R.C.C. M -25 using 20 mm size black hard granite hand broken stone chips cost of bore holes but excluding cost of M.S. rod / tar steel and labour charges for cutting, bending and binding of steel.
352
725049
2059.8
... More
Providing cast-in-situ double under reamed RCC piles with 375 mm dia circular pile foundation( as specified in the drawing )including excavation of bore holes by wrench or by any other mechanical means from the the bottom level of foundation excluding cost of reinforcement,cutting bending,binding the grills as per the drawing supplied by the Deptt. but including cost of cement concrete with M20 (1:1:5:3) using 12 mm down graded black H.G.C.B chips of approved quality from approved quarry mixed properly in cement concrete mixer including cost ,conveyance royality and all other taxes of materials, centering ,shuttering ,all labour , T &P ,Hire running charges of machinaries wih all leads, lifts,delifts and dewatering etc. complete as per the direction of the Engineer-in-Charge
1128
1987874
1762.3
... More
Straightening, Cutting, Bending, Binding and Tying the grills for M.S. Reinforcement for RCC works & placing in position including cost, conveyance, taxes of all materials, binding wire of 18 to 20 gauge labour etc complete as directed by the Engineer-in-Charge.
2966.6
26411639
8903
... More
Cement Concrete M - 15 with 20 mm and down graded crusher broken hard granite metal mixing by concrete mixture laying manually, compacting with vibrator with all cost, royalty and conveyance of materials complete as directed by the Engineer-in-Charge.
554.38
3526133
6360.5
... More
Filling foundation and plinth with sand including watering and ramming including cost, royalty and conveyance of all materilas complete.as per the direction of the Engineer-In-Charge.
20.57
12465
606
... More
Filling foundation and plinth with excavated materials including watering and ramming including cost, royalty and conveyance of all materilas complete.as per the direction of the Engineer-In-Charge.
5792.03
505065
87.2
... More
Providing weep holes in plain/ reinforcement cement concrete Abutment/Wing wall / Return wall with 100 mm dia A,C pipe extending through the full width of structure with slope 1V :20H towards drawing force etc,complete as directed by the Engineer-in-charge.
2760
298908
108.3
... More
Colloecting, conveyance, stacking and spreading to road side of good quality of Moorum and sand including cost, Conveyance and Royality and all other taxes etc. complete.
408.51
612969
1500.5
... More
R.R. stone packing in apron and revetments with Hard stone granite of size not less than 0.0025cum size to proper line and level with cost of stones and all labour require including conveyance of the stones etc complete as directed by the Engineer-in-Charge.
901.42
2072004
2298.6
... More
Random rubble granite stone of size not less than 0.0025 cum in sand grouted in foundation and plinth including cost,conveyance, of all materials.
1185.4
4125310
3480.1
... More
RCC M-25 with crusher broken hard granite 20 mm down graded of approved quality mixing by concrete mixer and placing manually.compacting with vibrator including cost,conveyance,labour charges of all materials and placement within initial lead of 50 M and initial lift of 1.5 M for mixed concrete as directed by the Engineer-in-Charge.
1731.79
12703372
7335.4
... More
Providing form work for concrete with F1 finish for concrete works with steel ahutters rigidly fixed & removal of forms & making good to the surface where necessary complete with all labour cost, canveyance of all materials, labour complete as directed by the Engineer-in-Charge.
5778.67
4451887
770.4
... More
Labour charges for Laying & fixing in position R.C.C hume pipes with collars jointed with cement mortar 1:3 complete excluding cost of spun pipes & collars.
20
868
43.4
... More
Cost of R.C.C Hume pipes 600 MM
20
64822
3241.1
... More
( C ) Rigid & smooth centering and shuttering for R.C.C works including false work and dismantaling then after as and when required with all cost of all materials, labour etc complete as per the direction of the Engineer-in-charge
-
-
-
... More
R.C.C. foundation, plinth band and footing bases of columns mass concrete pre cast slab
1555.83
368264
236.7
... More
R.C.C. work in Slab for culverts and Bridges up to 8 M span and up to 4.30 M height.
770.2
632796
821.6
... More
R.C.C. beams columns grider, pier & Abutment and bressmor etc.
1079.04
1109900
1028.6
... More
R.C.C. walls and fins
5434.51
5017139
923.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements