National Aluminium Company Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

National Aluminium Company Limited - NALCO Tender

Works
Civil And Construction
Eprocure
Opening Date7 Mar 2024
Closing Date23 Apr 2024
Tender Amount₹ 12,58,35,370 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
TEMPERATURE GAUGES WITH THERMOWELLS

-

-

-

... More
TEMPERATURE GAUGES & THERMOWELLS

27

-

-

... More
PRESSURE GAUGES

-

-

-

... More
SCREW CONNECTION

289

-

-

... More
FLANGED WITH REMOTE SEAL

16

-

-

... More
DIFFERNTIAL PRESSURE GAUGES

-

-

-

... More
FLANGED WITH REMOTE SEALS

12

-

-

... More
OTHERS

-

-

-

... More
SOLENOID VALVES

1

-

-

... More
AIR FILTER REGULATORS

1

-

-

... More
PANEL/BACK OF PANEL INSTRUMENTS

1

-

-

... More
ALARM ANNUNCIATORS

1

-

-

... More
HOOTER

1

-

-

... More
DISTRIBUTORS

1

-

-

... More
ZENER BARRIERS

1

-

-

... More
CONTROLLERS

1

-

-

... More
RECORDERS

1

-

-

... More
INDICATORS

1

-

-

... More
TOTALIZERS

1

-

-

... More
TERMINAL BLOCKS

1

-

-

... More
RELAY & BASE

1

-

-

... More
DIN RAIL

1

-

-

... More
EARTHING PLATE

1

-

-

... More
MCB- 1 POLE OR 2 POLE

1

-

-

... More
PVC CABLE DUCT-75 MM

1

-

-

... More
PVC CABLE DUCT-100 MM

1

-

-

... More
PANEL COOLING FAN

1

-

-

... More
PANEL LIGHT

1

-

-

... More
PANEL DOOR SWITCH

1

-

-

... More
HOOTER & BEACON (SIREN & STROBE) WITH RESET PUSH BUTTON STATION

55

-

-

... More
Rotameter indicator

141

-

-

... More
Handheld Communicator (HART) with software installed

3

-

-

... More
JUNCTION BOXES

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I Unit rate of supply shall be inclusive of mandatory spares as specified, required fasteners, tag plates, glands & plugs as including in schedule of quantities of Junction Boxes etc. as per specifications

-

-

-

... More
WEATHERPROOF JUNCTION BOXES.

-

-

-

... More
Terminals

231

-

-

... More
Terminals

152

-

-

... More
EX-ROOF/FLAME PROOF JUNCTION BOXES

-

-

-

... More
Terminals

6

-

-

... More
Terminals (Instrinsic safe)

6

-

-

... More
Terminals (Exd)

2

-

-

... More
EX-ROOF/FLAME PROOF/WEATHER PROOF HAND SWITCHES/PUSH BOTTON

-

-

-

... More
PUSH BUTTON STATION

9

-

-

... More
TUBE AND TUBE FITTINGS

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, and material inspection at Vendor work shop and MOC shall as per TKIS-INDIA specification-REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
TUBE - SS316/SS304/SS304L

-

-

-

... More
1/4" OD X 1 mm WT

13

-

-

... More
3/8" OD X 1 mm WT

13

-

-

... More
12mm Tube(OD) x 1 mm WT-SS316

6450

-

-

... More
TUBE - FITTINGS SS 316

-

-

-

... More
MALE CONNECTORS -12mm Tube(OD) X 1/2" NPT(M)-SS316

2600

-

-

... More
FEMALE CONNECTORS-12mm Tube(OD) X 1/2" NPT(F)-SS316

50

-

-

... More
EQUAL TEES-3 side 12mm Tube(OD)-SS316

900

-

-

... More
UNIONS-12mm Tube(OD) X 12mm Tube(OD)-SS316

500

-

-

... More
END BLIND CAP ( OD TYPE) FOR TUBES-12mm Tube(OD)-SS316

400

-

-

... More
MALE CONNECTORS -12mm Tube(OD) X 1/4" NPT(M)-SS316

550

-

-

... More
TUBING PLUGS-1/2" NPT(M)-SS316

50

-

-

... More
PLUGS-1/2" NPT(M)-SS316

120

-

-

... More
NIPPLE-12mm NPT (M) X 12mm NPT (M) 6" L-SS316

170

-

-

... More
Syphon-1/2" NPT(M) X 1/2" NPT(F)-SS316

20

-

-

... More
Needle Valve-12mm Tube(OD) X 12mm Tube(OD)-SS316

525

-

-

... More
Ball Valve-12mm NPT(F) X 12mm NPT(F)-SS316

40

-

-

... More
Ball Valve-12mm Tube(OD) X 12mm Tube(OD)-SS316

850

-

-

... More
Female Run Tee (Union Tee)-12mm Tube (OD) X 1/2" NPT (F)-SS316

50

-

-

... More
Non Return Valve-1/2"NPT(F)X1/2"NPT(F)-SS316

100

-

-

... More
Spacer Ring-2',150#,RF-SS316

80

-

-

... More
MALE CONNECTOR 1/2" TUBE (OD) X 3/8" NPT(M) SS316

1

-

-

... More
MALE CONNECTOR, 1/2" TUBE (OD) X 3/4" NPT(M) SS 316

1

-

-

... More
MALE CONNECTOR 1/4" TUBE (OD) X 3/8" NPT(M) SS316

1

-

-

... More
MALE CONNECTOR, 1/4" TUBE (OD) X 1/4" NPT(M) SS 316

1

-

-

... More
MALE CONNECTOR, 1/4" TUBE (OD) X 1/2" NPT(M) SS 316

1

-

-

... More
MALE CONNECTOR, 3/8" TUBE (OD) X 1/4" NPT(M) SS 316

1

-

-

... More
MALE CONNECTOR, 3/8" TUBE (OD) X 1/2" NPT(M) SS 316

1

-

-

... More
MALE CONNECTOR 3/4" TUBE (OD) X 1/4" NPT(M) SS 316

1

-

-

... More
MALE CONNECTOR 3/4" TUBE (OD) X 1/2" NPT(M) SS 316

1

-

-

... More
FEMALE CONNECTOR 1/4" TUBE (OD) X 1/4" NPT(F) SS 316

1

-

-

... More
FEMALE CONNECTOR 3/8" TUBE (OD) X 3/8" NPT(F) SS 316

1

-

-

... More
FEMALE CONNECTOR 1/2" TUBE (OD) X 1/2" NPT(F) SS 316

1

-

-

... More
FEMALE CONNECTOR 1/4" TUBE (OD) X 1/2" NPT(F) SS 316

1

-

-

... More
FEMALE CONNECTOR 1/2" TUBE (OD) X 1/4" NPT(F) SS 316

1

-

-

... More
FEMALE CONNECTOR 3/8" TUBE (OD) X 1/2" NPT(F) SS 316

1

-

-

... More
FEMALE CONNECTOR 1/4" TUBE (OD) X 3/8" NPT(F) SS 316

1

-

-

... More
TUBING UNION,1/4" TUBE(OD) X 1/4" TUBE(OD) SS316

1

-

-

... More
TUBING UNION, 3/8" TUBE(OD) X 3/8" TUBE(OD) SS316

1

-

-

... More
UNION TEE 3 SIDE, 1/4" TUBE(OD) SS316

1

-

-

... More
UNION TEE 3 SIDE, 3/8" TUBE(OD) SS316

1

-

-

... More
UNEQUAL TEE, 1/4"OD X 1/4"ODX 1/4" NPT (M)

1

-

-

... More
UNEQUAL TEE, 3/8"OD X 3/8"ODX 3/8" NPT (M)

1

-

-

... More
UNEQUAL TEE, 1/2"OD X 1/2"ODX 1/2" NPT (M)

1

-

-

... More
PLUG, 1/4" NPT(M) SS316

1

-

-

... More
PLUG, 3/8" NPT(M) SS316

1

-

-

... More
PLUG, 1" NPT(M) SS316

1

-

-

... More
FERRULES FOR 1/4" OD TUBE (FRONT & BACK SET) SS 316

1

-

-

... More
FERRULES FOR 3/8" OD TUBE (FRONT & BACK SET) SS 316

1

-

-

... More
FERRULES FOR 1/2" OD TUBE (FRONT & BACK SET) SS 316

1

-

-

... More
1/4" O.D BULKHEAD CONNECTORS SS 316

1

-

-

... More
1/2" O.D BULKHEAD CONNECTORS SS 316

1

-

-

... More
SYPHON, 1/2" NPT(M) X 1/2" NPT(F) SS316 (Non-IBR)

1

-

-

... More
SYPHON, 1/2" NPT(M) X 1/2" NPT(F) SS316 (IBR)

1

-

-

... More
GAUGE SAVER1/2' NPT(M) X 1/2" NPT(F) SS316

1

-

-

... More
2-WAY MANIFOLD1/2" NPT(F)SS316

1

-

-

... More
3-WAY MANIFOLD1/2" NPT(F)SS316

1

-

-

... More
5-WAY MANIFOLD1/2" NPT(F)SS316

1

-

-

... More
NEEDLE VALVE, 1/4" TUBE(OD) X 1/4" TUBE(OD) SS316, RATING 3000 PSI

1

-

-

... More
NEEDLE VALVE, 1/2" NPT(F) X 1/2" NPT(F) SS316, RATING 3000 PSI

1

-

-

... More
HEX NIPPLE 1/4" NPT(M) X 1/4" NPT(M) SS 316

1

-

-

... More
HEX NIPPLE 1/2" NPT(M) X 1/2" NPT(M) SS 316

1

-

-

... More
HEX NIPPLE 1" NPT(M) X 1" NPT(M) SS 316

1

-

-

... More
TUBING CAP 1/4''NPT (F) SS 316

1

-

-

... More
BALL VALVE, 1/4" TUBE OD X 1/4 TUBE OD SS 316

1

-

-

... More
BALL VALVE, 1/2" NPT(F) X 1/4 NPT(F) SS 316

1

-

-

... More
1/2" OD x 1/2" OD "L" CONNECTOR, SS316

1

-

-

... More
1/2" NPT(M) x 1/2" OD "L" CONNECTOR, SS316

1

-

-

... More
1/4" NPT(M) x 3/8" OD "L" CONNECTOR, SS316

1

-

-

... More
1/2" OD x 1/2" OD x 1/2" OD "T" CONNECTOR, SS316

1

-

-

... More
FLANGES OF 1/2" NB 150LB with 1/2" NPT(F), SS316

1

-

-

... More
FLANGES OF 1" NB 150LB with 1/2" NPT(F), SS316

1

-

-

... More
FLANGES OF 3" NB 150LB with 1/2" NPT(F), SS316

1

-

-

... More
INSTRUMENT CABLE

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
SIGNAL CABLES, MULTISTRANDED, ARMOURED

-

-

-

... More
1 PAIR X 1.0 mm2 Screened

750

-

-

... More
2 PAIR X 1.0 mm2 Screened

750

-

-

... More
4 PAIR X 1.5 mm2 Screened

1000

-

-

... More
6 PAIR X 1.0 mm2 Screened

750

-

-

... More
12 PAIR X 1.0 mm2 Screened

1000

-

-

... More
1 TRAID X 1.0 mm2 Screened

500

-

-

... More
2 PAIR X 1.5 mm2 Screened

250

-

-

... More
3 PAIR X 1.5 mm2 Screened

500

-

-

... More
FIBEROPTICAL; ARMOURED /UNARMOURED

-

-

-

... More
FIBER-OPTIC CABLES- Single Mode , 12 Fibre

35000

-

-

... More
CONTROL CABLES, MULTISTRANDED, ARMOURED

-

-

-

... More
3 CORE X 2.5 mm2

750

-

-

... More
8 CORE X 1.0 mm2

1000

-

-

... More
12 CORE X 1.5 mm2

750

-

-

... More
24 CORE X 1.5 mm2

1000

-

-

... More
24 CORE X 1.0 mm2

1000

-

-

... More
EARTHING CABLES; UNARMOURED

-

-

-

... More
1 CORE X 6 mm2

450

-

-

... More
1 CORE X 16 mm2

450

-

-

... More
CABLE GLANDS

-

-

-

... More
Supply charges including charges for transportation, material inspection at Vendor work shop , required certificates and MOC shall as per TKIS-INDIA specification-REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
SIGNAL, CONTROL, POWER CABLES

-

-

-

... More
M20 DOUBLE COMPRESSION WITH CHECK NUTS

6965

-

-

... More
M20 DOUBLE COMPRESSION WITH CHECK NUTS(Ex proof)

100

-

-

... More
M25 DOUBLE COMPRESSION WITH CHECK NUTS

1175

-

-

... More
M25 DOUBLE COMPRESSION WITH CHECK NUTS(Ex proof)

5

-

-

... More
M32 DOUBLE COMPRESSION WITH CHECK NUTS

1295

-

-

... More
M32 DOUBLE COMPRESSION WITH CHECK NUTS (Ex Proof)

15

-

-

... More
Plugs-suitable for M20 glands

1875

-

-

... More
Plugs-suitable for M20 glands(Ex proof)

50

-

-

... More
Adaptor 1/2"NPT to M20

25

-

-

... More
Plugs-suitable for M32 glands

25

-

-

... More
Plugs-suitable for M32 glands(Ex proof)

25

-

-

... More
CONDUITS

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material send for testing to test laboratory on sample basis and fitting/accessories. MOC shall as per TKIS-INDIA Specification-REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
RIGID GI

-

-

-

... More
25 mm nominal dia

35000

-

-

... More
FITTINGS

-

-

-

... More
UNION (25 mm)

2000

-

-

... More
CANOPY/SUNSHED AL/GI/FRP

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, fasteners,(U Clamps, etc..) material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
FOR TRANSMITTERS (Single transmitter/instrument) (FRP )

1090

-

-

... More
FOR LCP (FRP )

398

-

-

... More
FOR PUSH BOTTON/HAND SWITCHES (FRP )

9

-

-

... More
STRUCTURAL STEEL

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material send for testing to test laboratory on sample basis, etc. MOC shall as per TKIS-INDIA specification Supply charges including charges for required fasteners like nut bolts, anchor fasteners etc.

-

-

-

... More
2" CLASS “B” PIPE AS PER IS 1239 -Part I

2175

-

-

... More
STEAM TRACING

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, copper tube, fittings, insulation material ,fasteners,etc...,material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
COPPER TUBE SIZE 8 MM OD

48

-

-

... More
COPPER TUBE SIZE 10 MM OD

48

-

-

... More
COPPER TUBE SIZE 12 MM OD

48

-

-

... More
FIRE PROOFING FOR CABLE DUCT, TRAY, ANGLE TRAY, ETC.

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, ,fasteners,etc...,material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I)

-

-

-

... More
300 W X 100 H X 2.5 T LADDER TRAY WITH COVER

50

-

-

... More
150 W X 50 H X 2.5 T PEFORATED TRAY WITH COVER

50

-

-

... More
INSTRUMENT CONSUMABLES, PROTECTION, SEALING & INSTALLATION ACCESSORIES/CONSUMABLES

-

-

-

... More
TAG PLATE FOR INSTRUMENT (SS316 1" X 2" X2mm)

100

-

-

... More
TAG PLATE FOR JUNCTION BOX, LOCAL PANEL (SS316 1" X 2" X2mm)

50

-

-

... More
FOAMED SEALENT FOR CABLE ENTRY INSIDE CONTROL ROOM STANVAC PUFFSEAL OR EQUIVALENT (1 meter x 1 meter)

3

-

-

... More
STRUCTURAL STEEL

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material send for testing to test laboratory on sample basis, etc. MOC shall as per TKIS-INDIA specification Supply charges including charges for required fasteners like nut bolts, anchor fasteners etc.

50

-

-

... More
CABLE TRAYS Supply charges including charges for transportation, unloading at site, MTC, fasteners, coupler plates, Z supports ,material inspection at Vendor work shop and erection contractor shall ensure MOC as per tender specification Unit rate of supply including required Clamps, Coupler Plates, Fasteners etc.

-

-

-

... More
LADDER TRAYS FRP

-

-

-

... More
600 mm wide

50

-

-

... More
300 mm wide

50

-

-

... More
PERFORATED TRAYS FRP

-

-

-

... More
50 mm wide

150

-

-

... More
100 mm wide

140

-

-

... More
150 mm wide

140

-

-

... More
LADDER/ PERFORATE TRAY COVERS

-

-

-

... More
SUTABLE FOR WIDTH 600 MM

25

-

-

... More
SUTABLE FOR WIDTH 300 MM

20

-

-

... More
SUTABLE FOR WIDTH 150 MM

65

-

-

... More
SUTABLE FOR WIDTH 50 MM

90

-

-

... More
TRAY ACCESSORIES-FRP

-

-

-

... More
PRE-FABRICATED LADDER EQUAL TEE(600W)

5

-

-

... More
PRE-FABRICATED LADDER EQUAL TEE(300W)

5

-

-

... More
90⁰ BEND/ELBOW(600W)

5

-

-

... More
90⁰ BEND/ELBOW(300W)

5

-

-

... More
45⁰ BEND/ELBOW(600W)

5

-

-

... More
45⁰ BEND/ELBOW(300W)

5

-

-

... More
PRE-FABRICATED EQUAL REDUCER(600W x 300W)

2

-

-

... More
PRE-FABRICATED EQUAL REDUCER(300W x 150 W)

2

-

-

... More
VERTICAL ELBOWS (90 Deg.) – OUT SIDE (600W)

5

-

-

... More
VERTICAL ELBOWS (90 Deg.) – OUT SIDE (300W)

5

-

-

... More
VERTICAL ELBOWS (90 Deg.) – IN SIDE (600W)

5

-

-

... More
VERTICAL ELBOWS (90 Deg.) – IN SIDE (300W)

5

-

-

... More
GENERAL ITEMS

-

-

-

... More
Supply of following items and all the associated accessories SCOPE OF SUPPLY -instrumentation'

-

-

-

... More
Office tables of reputed make

2

-

-

... More
Office chairs of reputed make

2

-

-

... More
Full size Cupboard of reputed make, sheet steel enclosure (for documentation)

2

-

-

... More
Tool Cabinet, Trolley Mounted

2

-

-

... More
Key Cabinet, Wall Mounted

2

-

-

... More
Tarpaulin (for weather protection of stored Instrumentation items)

10

-

-

... More
Insulated step ladder of reputed make (suitable for indoor work)

2

-

-

... More
Insulated step ladder of reputed make with platform (suitable for indoor work )

2

-

-

... More
INSTALLATION ITEMS-DAMANJODI

-

-

-

... More
FIELD INSTRUMENT INSTALLATION

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, required hardware/fasteners, consumables, tagging, tools & tackles, manpower etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
TRANSMITTERS (PNEUMATIC + ELECTRONIC

-

-

-

... More
MAGNETIC FLOW METERS (REMOTE MOUNTED TRANSMITTERS ONLY)

38

-

-

... More
POSITIVE DISPLACEMENT METERS (REMOTE MOUNTED PULSE/CURRENT CONVERTER ONLY

3

-

-

... More
ANNUBARS/PITOT TUBEs (DP TYPE FLOW METER)-Includes flow elements installation

25

-

-

... More
DP TYPE TRANSMITTERS (DPT/FT/LT TYPE)

65

-

-

... More
GAUGE PRESSURE TRANSMITTERS

104

-

-

... More
FLANGED PRESSURE TRANSMITTERS

25

-

-

... More
REMOTE SEAL (CHEMICAL SEAL) TYPE PRESSURE TRANSMITTERS

9

-

-

... More
REMOTE SEAL TYPE WITH TWO REMOTE SEAL DP TRANSMITTERS

4

-

-

... More
RADAR TYPE LEVEL TRANSMITTER

57

-

-

... More
ULTRASONIC TYPE LEVEL TRANSMITTER

49

-

-

... More
RADIOACTIVE LEVEL /Density TRANSMITTERS ALONG WITH SENSORS,DETECTOR

26

-

-

... More
TEMPERATURE TX SEPARATELY MOUNTED

241

-

-

... More
LOOP POWER LOCAL INDICATORS

56

-

-

... More
AUTO RODDER DEVICES

66

-

-

... More
ANALYSERS

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, installation of sampling system, probes, calibration cylinders, accessories, heat tracing, insulated tube, glanding ,consumables, fasteners, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
pH, CONDUCTIVITY, REDOX TRANSMITTERS WITH PROBE

42

-

-

... More
CORROSION ELEMENT WITH TRANSMITTER

1

-

-

... More
TEMPERATURE ELEMENTS AND THERMOWELLS

-

-

-

... More
RESISTANCE TEMPERATURE DETECTORS WITH THEMOWELL

229

-

-

... More
TEMPERATURE ELEMENT SURFACE MOUNTED

12

-

-

... More
TEMPERATURE GAUGES WITH THERMOWELLS

-

-

-

... More
TEMPERATURE GAUGES & THERMOWELLS

20

-

-

... More
LEVEL GAUGE

-

-

-

... More
MAGNETIC TYPE LEVEL GAUGE WITH LEVEL SWITCHES

2

-

-

... More
PRESSURE GAUGES

-

-

-

... More
SCREW CONNECTION

260

-

-

... More
WITH REMOTE SEAL (FLANGED)

13

-

-

... More
DIFFERENTIAL PRESSURE GAUGES

-

-

-

... More
WITH REMOTE SEALS

10

-

-

... More
OTHERS

-

-

-

... More
DIN RAIL TEMPERATURE TRANSMITTER (CONSISTING OF 4 NOS. OF DIN RAIL MOUNT TRANSMITTER)

536

-

-

... More
HOOTER & BEACON (SIREN & STROBE) WITH RESET PUSH BUTTON STATION INSTALLATION

49

-

-

... More
Control Panel with Panel mounted instruments(PORT AREA) ( 1.8m x2mX.8m)

1

-

-

... More
SOLENOID VALVES

1

-

-

... More
AIR FILTER REGULATORS

1

-

-

... More
PANEL/BACK OF PANEL INSTRUMENTS

1

-

-

... More
ALARM ANNUNCIATORS

1

-

-

... More
HOOTER

1

-

-

... More
DISTRIBUTORS

1

-

-

... More
ZENER BARRIERS

1

-

-

... More
CONTROLLERS

1

-

-

... More
RECORDERS

1

-

-

... More
INDICATORS

1

-

-

... More
TOTALIZERS

1

-

-

... More
TERMINAL BLOCKS

1

-

-

... More
RELAY & BASE

1

-

-

... More
DIN RAIL

1

-

-

... More
EARTHING PLATE

1

-

-

... More
MCB- 1 POLE OR 2 POLE

1

-

-

... More
PVC CABLE DUCT-75 MM

1

-

-

... More
PVC CABLE DUCT-100 MM

1

-

-

... More
PANEL COOLING FAN

1

-

-

... More
PANEL LIGHT

1

-

-

... More
PANEL DOOR SWITCH

1

-

-

... More
LCP/DCS/PLC CABINETS/ANALYSER SHELTERS/MONITORS/PRINTORS/FURNITURES

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, erection, alignment, required hardware’s/fasteners, plugging of spare entries, tools & tackles, manpower, lifting equipment's ,trolley, etc.MOC of hardware's shall as per TKIS -India specification ). All complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
LCP/DCS/PLC CABINETS/MONITORS/PRINTORS/FURNITURES

-

-

-

... More
PANEL: 1200W X 800D X 2100H

50

-

-

... More
PANEL: 800W X 800D X 2100H

20

-

-

... More
AUX. CONSOLES

2

-

-

... More
DENSITY TRANSMITTER JB: SIZE 300W X 200D X 500H

26

-

-

... More
DP REGULATOR PANEL: SIZE 350W X 275D X 575H

84

-

-

... More
SUMP PANEL: SIZE 500W X 250D X 500W

22

-

-

... More
DIN rail mounted JB: APPROX SIZE 350W X 180D X 300H

134

-

-

... More
Workstations including ES Cum OS,PRM,OPC etc. station with table,chairs

40

-

-

... More
Printers including printer tables

15

-

-

... More
Large Video Wall with Video Controller & Cabinet : APPROX VIDEO WALL SIZE-7.8M X 1.3M & CABINET SIZE (600mmW X 337H X 100D)

1

-

-

... More
AUTO RODDER PANEL: APPROX SIZE 325W X 200D X 400H

66

-

-

... More
PANEL: APPROX SIZE 1000W X 400D X 1200H ( for FILTER)

7

-

-

... More
PANEL: APPROX SIZE 800W X 337D X 1950H ( for Air compressor)

4

-

-

... More
RED MUD AREA CONTROL PANEL-1(4' X 29.5' X 30')

1

-

-

... More
RED MUD AREA CONTROL PANEL-2(20.25' X 20' X 10')

1

-

-

... More
MUD DISPOSAL PUMP PANEL(800W X 300D X 1200H)

1

-

-

... More
LUBRICATION PANEL FOR DISC FILTER(550W X 350D X 900H)

7

-

-

... More
ANALYSERS PRIMARY SAMPLING UNIT & ANALYZER SHELTER .

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, required hardware’s/fasteners, plugging of spare entries, tools & tackles, manpower, lifting equipment's , trolley, Fit up and welding of supports etc. of various material of construction and sizes including collection of material from stores, cutting grinding as required, etc. fit up under vendor supervision). All complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
SAMPLING UNIT: 650W x 600D x 2000H

16

-

-

... More
JUNCTION BOXES

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, required hardware’s/fasteners, plugging of spare entries, Tagging, box-up, suitable greasing for screws/L key screws, tools & tackles, manpower, etc. (MOC of hardware's shall as per TKIS -India specification). All complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
WEATHERPROOF JUNCTION BOXES

-

-

-

... More
40 Terminals

195

-

-

... More
20 Terminals

154

-

-

... More
EX-ROOF/FLAME PROOF JUNCTION BOXES

-

-

-

... More
40 Terminals

6

-

-

... More
20 Terminals

1

-

-

... More
EX-ROOF/FLAME PROOF/WEATHER PROOF HAND SWITCHES/PUSH BOTTON

-

-

-

... More
PUSH BUTTON STATION / CONTROL / LOCAL PANELS

8

-

-

... More
TUBE AND TUBE FITTING

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, surface cleaning, painting, fabrication, installation, accessories installation (fittings, valves manifold, etc.), welding, radiography, Hydro/Pneumatic testing, clamping, tagging, consumables, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge. REFER HOO-UP DOCUMENT FOR BOM & MOC.

-

-

-

... More
TUBE - SS316/SS304/SS304L

-

-

-

... More
1/4" OD X 1 mm WT

13

-

-

... More
3/8" OD X 1 mm WT

13

-

-

... More
12mm Tube(OD) x 1 mm WT-SS316

6450

-

-

... More
INSTRUMENT CABLE LAYING

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, meggering, continuity test, Cable glanding, termination, cable dressing, clamping, cable tagging, ferruling, supply of consumables( like lugs, sleeve for shield/drain, sealing compounds etc.) hardware's/fasteners for clamping/dressing, making holes for cable gland/cable entries ( JBs, Panels ,etc.), tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge. Main cables will be laid from unit to SRR/CR through trays, ducts & trenches as per layout drawings

-

-

-

... More
SIGNAL CABLES ,MULTISTRANDED,ARMOURED

-

-

-

... More
1 PAIR X 1.0 mm2 Screened

97250

-

-

... More
2 PAIR X 1.0 mm2 Screened

20900

-

-

... More
2 PAIR X 1.5 mm2 Screened

3100

-

-

... More
4 PAIR X 1.0 mm2 Screened

19250

-

-

... More
6 PAIR X 1.0 mm2 Screened

113250

-

-

... More
12 PAIR X 1.0 mm2 Screened

114400

-

-

... More
1 TRAID X 1.0 mm2 Screened

9650

-

-

... More
2 PAIR X 1.5 mm2 Screened

250

-

-

... More
3 PAIR X 1.5 mm2 Screened

500

-

-

... More
SERIAL COMMUNICATION CABLEARMOURED/UNARMOURED

-

-

-

... More
PRE-FAB CABLES (INCLUDING CAT5,PATCH CORD CABLES,ETHERNET CABLES ETC.)

1775

-

-

... More
MODBUS CABLES

625

-

-

... More
SPECIAL CABLE UNARMOURED FOR MAGNETIC/VORTEX/CONDUCTIVITY /DENSITY TRANSMITTER

1785

-

-

... More
CONTROL CABLES, MULTISTRANDED, ARMOURED

-

-

-

... More
3 CORE X 2.5 mm2

33750

-

-

... More
8 CORE X 1.0 mm2

19500

-

-

... More
12 CORE X 1.5 mm2

25750

-

-

... More
24 CORE X 1.0 mm2

13000

-

-

... More
24 CORE X 1.5 mm2

29000

-

-

... More
EARTHING CABLES; UNARMOURED

-

-

-

... More
1 CORE X 6 mm2

4450

-

-

... More
1 CORE X 16 mm2

2450

-

-

... More
FIBER OPTICAL; ARMOURED /UNARMOURED

-

-

-

... More
Scope includes preparation of all fibres and splicing / patching ,Supply of adequate consumables for the execution of the work (such as fibre optic connectors suitable for the application), testing, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
FIBER-OPTIC CABLES- Single Mode , 12 Fibre

35000

-

-

... More
CONDUITS

-

-

-

... More
Installation charges including transportation from TKIS/Client material store to working location, fabrication like (making threads, bends, etc.), require hardware’s/fasteners (U clamps etc.), clamping/supporting, accessories installation(fittings), consumables, tools & tackles, manpower etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
RIGID GI CONDUITS

-

-

-

... More
25 mm nominal dia

35000

-

-

... More
CANOPY /SUNSHED AL/GI/FRP

-

-

-

... More
Installation charges including transportation from material store to working location, supporting wherever require for instruments, JBs , etc. (like integrated inline instruments, close couple mounted instruments, etc.), hardware's/fasteners, consumables etc. Fabrication, installation, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
PREFABRICATED. CANOPIES

-

-

-

... More
Single transmitter/instrument

1090

-

-

... More
Two transmitters/instruments

15

-

-

... More
Hand switch/Push button

9

-

-

398

-

-

... More
STANCHIONS FOR INSTRUMENTS

-

-

-

... More
Installation charges including transportation from TKIS/Client material store to working location, fabrication, surface cleaning, painting, suitable clamps with pipe line (for close couple hook-ups etc.), hardware's/fasteners, grouting, clamps, consumables, tools & tackles, manpower etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
FLOOR MOUNTING

220

-

-

... More
STRUCTURE MOUNTING

49

-

-

... More
PLATFORM MOUNTING-Single instrument

796

-

-

... More
PLATFORM MOUNTING-Two instrument

14

-

-

... More
STRUCTURAL STEEL

-

-

-

... More
Installation charges including transportation from TKIS/Client material store to working location, fabrication, installation, surface cleaning, painting , consumables, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
STRUCTURAL STEEL

49

-

-

... More
2" PIPE CLASS “B” AS PER IS 1239 -Part I

2175

-

-

... More
STEAM TRACING

-

-

-

... More
Unit rate of installation of Copper tubes for Steam tracing including handling, shifting from site-store / yard to the installation location, installation & connection of accessories (valves, fitting, steam trapes etc.), tracing tubes and insulating materials wrapping around pipe/tube/valve/flange, etc. cladding, dressing, clamping, tagging, leak checking and flushing, required hardware's/fasteners, consumables, manpower etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
COPPER TUBE SIZE 8 MM OD

48

-

-

... More
COPPER TUBE SIZE 10 MM OD

48

-

-

... More
COPPER TUBE SIZE 12 MM OD

48

-

-

... More
FIRE PROOFING FOR CABLE DUCT,TRAY,ANGLE TRAY,ETC.

-

-

-

... More
Installation charges including transportation from TKIS/Client material store to working location, installation of Mattresses, Cladding, SS Clamps, all fittings, accessories, tools & tackles, manpower etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
300 W X 100 H X 2.5 T LADDER TRAY WITH COVER

50

-

-

... More
150 W X 50 H X 2.5 T PEFORATED TRAY WITH COVER

50

-

-

... More
INSTRUMENT CALIBRATION

-

-

-

... More
Calibration charges including handling, shifting from site-store / yard to the installation location, restore to safe place after calibration, removable and reinstallation from/to package units, if required, require tools & tackles, manpower, calibrators, calibration laboratory, changing range / engg. unit etc. as per data sheet, trouble shooting, zero elevation & subtraction, preparation of reports, hardware/fasteners, consumables, Labelling (with range, date, tag), etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
TRANSMITTERS (PNEUMATIC + ELECTRONIC

-

-

-

... More
ANNUBARS/PITOT TUBEs (DP TYPE FLOW METER)-Includes flow elements installation

25

-

-

... More
DP TYPE TRANSMITTERS

65

-

-

... More
GAUGE PRESSURE TRANSMITTERS

104

-

-

... More
FLANGED PRESSURE TRANSMITTERS

25

-

-

... More
REMOTE SEAL TYPE WITH ONE REMOTE SEAL PRESSURE TRANSMITTERS

9

-

-

... More
REMOTE SEAL TYPE WITH TWO REMOTE SEAL DP TRANSMITTERS

4

-

-

... More
RADAR TYPE LEVEL TRANSMITTER

59

-

-

... More
ULTRASONIC TYPE LEVEL TRANSMITTER

49

-

-

... More
TEMPERATURE TX SEPARATELY MOUNTED

241

-

-

... More
LOOP POWER LOCAL INDICATORS

56

-

-

... More
INTEGRAL ORIFICE METER RUN ASSEMBLY WITH TRANSMITTER

6

-

-

... More
TEMPERATURE ELEMENTS AND THERMOWELLS

-

-

-

... More
RESISTANCE TEMPERATURE DETECTORS WITH THEMOWELL

229

-

-

... More
TEMPERATURE ELEMENT SURFACE MOUNTED

12

-

-

... More
TEMPERATURE GAUGES WITH THERMOWELLS

-

-

-

... More
TEMPERATURE GAUGES & THERMOWELLS

20

-

-

... More
LEVEL GAUGE

-

-

-

... More
MAGNETIC TYPE LEVEL GAUGE WITH LEVEL SWITCHES

2

-

-

... More
PRESSURE SWITCHES

-

-

-

... More
SCREW CONNECTION (pressure switch)

260

-

-

... More
WITH REMOTE SEAL

13

-

-

... More
DIFFERENTIAL PRESSURE GAUGES

-

-

-

... More
WITH REMOTE SEALS

10

-

-

... More
STROKE CHECKING/CALIBRATION FOR CONTROL VALVES AND ON-OFF VALVES

-

-

-

... More
(Stroke checking/Calibration charges including adjustment of positioners w.r.t. mA, feed backs (limit switches), feed back transmitters (positioner transmitters), seat leak test as per project requirement, oil free instrument air subject to it not available in the plant, tools & tackles, manpower, calibrators, test benches, hardwares, consumables, Labelling (with range, date, tag), ensure flow direction of installed valves if doing on line calibration/stroke checking, etc. all complete as per specification and direction of Engineer-in-Charge. Control/ on-off valves with mechanical stopper shall be checked for proper stopper adjustment as required for the process before installing on line.

-

-

-

... More
CONTROL VALVES WITH I/P coverters + PNEUMATIC POSITIONERS

100

-

-

... More
ON-OFF VALVE WITH SOV AND TWO FEED BACK

180

-

-

... More
MOV WITH ON-OFF

2

-

-

... More
LOOP CHECKING

-

-

-

... More
Loop checking charges including consumables, tools-tackles, continuity test (cold loop) of each cable if its not done after cable laying, ensure flow direction of in line instruments (like orifice type flow annubars/venturi, magnetic, mass, vortex flow meter, rota meter, Control valves, ON-OFF valves, etc.), trouble shooting, tools & tackles, manpower, calibration if require etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
LOOP CHECKING FOR ANALOG AND DIGITAL

-

-

-

... More
ANALOG INPUT

1934

-

-

... More
DIGITAL INPUT

331

-

-

... More
DIGITAL OUTPUT

2286

-

-

... More
DIGITAL OUTPUT

1865

-

-

... More
REWORK/DISMENTLING

-

-

-

... More
The contractor may, during execution of work, be required to re-do a part or whole of work already completed. The contractor is entitled to claim charges for the extra work entailed. Prior to starting such work approval from the clients/TKIS - India shall be taken & Rates applicable for dismantling activities shall be 30% of the rates applicable for installation .Claim for Extra work shall be applicable as per serial no. 9 of "GS instrumentation installation part -II"

-

-

-

... More
STRUCTURAL STEEL

10

-

-

... More
CONDUITS

500

-

-

... More
TUBE AND TUBE FITTINGS

500

-

-

... More
PIPE AND PIPE FITTINGS

300

-

-

... More
STANCHIONS FOR INSTRUMENTS

100

-

-

... More
CANOPY/SUNSHED

50

-

-

... More
CABLE TRAYS

2000

-

-

... More
JUNCTION BOXES

25

-

-

... More
LCP/DCS/PLC CABINETS/ANALYSER SHELTERS/MONITORS/PRINTORS/FURNITURES

15

-

-

... More
INSTRUMENT CABLE

2000

-

-

... More
FIELD INSTRUMENT

100

-

-

... More
FREE ISSUE INSTRUMENT ITEMS INSTALLAED BY OTHER CONTRACTORS AND WHERE ONLY SUPERVISION/CHECKING IS IN THE SCOPE OF INSTRUMENT CONTRACTOR Contractor need to work in close co-ordination with Piping Contractor during installation of inline instrument. Contractor need to supervise and assist Piping contractor for lifting / shifting of instrument to avoid damaged during shifting. Supervison and checking of In-line instrument prior to installation and during installation for flow direction, inlet and outlet distance, Instrument mounting as per vendor installation catalogue or as per guidlines issued by tkIS- Site -in-charge.

-

-

-

... More
ANNUBARS/PITOT TUBEs ELEMENT (FOR FLANGE MOUNTING)

25

-

-

... More
SLURRY ANGLE VALVES INCLUDING INSTALLATION OF VOLUME TANK OF WEIGHT 280 KG (MAX).

39

-

-

... More
MAGNETIC FLOWMETER FLOWTUBE

149

-

-

... More
DESUPERHEATER VALVE

5

-

-

... More
GLOBE CONTROL VALVE

30

-

-

... More
ORIFICE PLATE WITH FLANGE

9

-

-

... More
INTEGRAL ORIFICE METER RUN ASSEMBLY

6

-

-

... More
ROTAMETER

135

-

-

... More
AUTO RODDING DEVICE

66

-

-

... More
BUTTERFLY CONTROL VALVE

55

-

-

... More
BUTTERFLY ON/OFF VALVE

33

-

-

... More
GATE ON/OFF VALVE

2

-

-

... More
GLOBE ON/OFF VALVE

35

-

-

... More
MOTOR ACTUATED BUTTERFLY VALVE

2

-

-

... More
BALL ON/OFF VALVE

3

-

-

... More
SELF ACTING LEVEL CONTROL VALVE

34

-

-

... More
SELF ACTING PRESSURE CONTROL VALVE

55

-

-

... More
SLURRY BALL - CONTROL VALVE

10

-

-

... More
PREFABRICATED CABLE TRAYS

-

-

-

... More
Handling, shifting from site-store / yard to the installation location, unpacking, erection, alignment, assembly and installation of prefabricated galvanized steel ladder type / perforated cable trays / FRP cable trays (above ground or inside concrete trenches) with all associated accessories such as bends, reducers, T-joints, fixing clamps, earthing continuity conductors, paint touchup if required, manpower, etc. - as recommended by MANUFACTURER / applicable construction documents, fixing of cable trays / associated accessories to steel supports, stenciling with paint as required and other associated work so as to ensure the completeness of installation work

-

-

-

... More
Site fabrication of cable tray accessories such as elbows,bends, reducers, T-joints etc. from cable tray straight runs as per the site requirement is included in the scope.

-

-

-

... More
Fabrication and installation of steel support / bracket for cable trays / accessories as per the site requirement.

-

-

-

... More
Supply of all fixing hardware as per the site requirement is included in the scope.

-

-

-

... More
Cable Trays Perforated (GI) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
50 mm wide

15950

-

-

... More
100 mm wide

4970

-

-

... More
150 mm wide

2490

-

-

... More
Cable Ladders (GI) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
150 mm wide

1250

-

-

... More
300 mm wide

3990

-

-

... More
450 mm wide

50

-

-

... More
600 mm wide

4600

-

-

... More
Cable Tray Covers (GI) and Accessories

-

-

-

... More
50 mm wide

7990

-

-

... More
100 mm wide

1990

-

-

... More
150 mm wide

1190

-

-

... More
300 mm wide

1790

-

-

... More
450 mm wide

50

-

-

... More
600 mm wide

1000

-

-

... More
Separators for Cable Ladders (GI)

-

-

-

... More
300 mm / 600 mm wide

40

-

-

... More
Cable Trays Perforated (Epoxy painted) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
50 mm wide

10

-

-

... More
100 mm wide

10

-

-

... More
150 mm wide

10

-

-

... More
Cable Ladders (Epoxy painted) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
150 mm wide

11

-

-

... More
300 mm wide

51

-

-

... More
450 mm wide

10

-

-

... More
600 mm wide

12

-

-

... More
Cable Tray Covers (Epoxy painted) and Accessories

-

-

-

... More
150 mm wide

10

-

-

... More
300 mm wide

10

-

-

... More
450 mm wide

10

-

-

... More
600 mm wide

10

-

-

... More
Separators for Cable Ladders (Epoxy painted)

-

-

-

... More
300 mm / 600 mm wide

20

-

-

... More
Cable Trays Perforated (FRP) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
50 mm wide

150

-

-

... More
100 mm wide

140

-

-

... More
150 mm wide

140

-

-

... More
Cable Ladders (FRP) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
150 mm wide

32

-

-

... More
300 mm wide

50

-

-

... More
450 mm wide

10

-

-

... More
600 mm wide

50

-

-

... More
Cable Tray Covers (FRP) and Accessories

-

-

-

... More
50 mm wide

90

-

-

... More
150 mm wide

65

-

-

... More
300 mm wide

20

-

-

... More
450 mm wide

10

-

-

... More
600 mm wide

25

-

-

... More
Separators for Cable Ladders (FRP)

-

-

-

... More
300 mm / 600 mm wide

5

-

-

... More
Cable Ladders (Epoxy painted) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
300 mm wide

445

-

-

... More
Separators for Cable Ladders (Epoxy painted)

-

-

-

... More
300 mm / 600 mm wide

400

-

-

... More
EXCAVATION & BACKFILLING

-

-

-

... More
Excavation And Back Filling Cable trench In All Type Of Soil Except Rock For Laying Cable To A Maximum Depth Of 1.5M. Job Includes, Shoring, De-Watering, If Required And Consolidating The Trench Bed As Per Drawing And Direction Of Engineer-In-Charge. Finally Making The Surface As Per Original. Job Includes The Supply Of Labour, Material Required, Back filling and Disposal Of Surplus Earth Also.

5

-

-

... More
MANPOWER SUPPLY RATES PER DAY

-

-

-

... More
Note: These rates for man power are applicable only after total completion of Instrumentation Installation & Instrumentation Commissioning activities. Providing technical assistance during pre-commissioning / commissioning phase by deploying different categories of skilled personnel as listed below .The quoted man-months rates shall be inclusive of all wages, travel / accommodation expenses, including PPE’s, all tools & tackles etc. and other costs which the bidder shall be entitled to claim by way of Man-Month Rates for the services. Prior to deployment of personnel at site, Contractor shall submit the detailed CVs of such persons proposed to be posted at site to Owner for concurrence & approval. The Owner and Contractor shall jointly maintain a record of all such personnel chargeable at Man-Month Rates deployed each day which shall be used as the basis for calculating payments due to the Contractor for the services covering assistance during pre-commissioning & commissioning phase. For deployment covering part of the month, payment shall be made on pro-rata basis considering 30 days in a month.Should the performance of any of Contractor’s personnel be found unsatisfactory by Owner,the replacement of such personnel shall be carried out by Contractor immediately. The below mentioned rates for Manpower Supply shall be applicable only for work performed over and above the Instrumention works already defined as forming part of CONTRACTOR’s scope in the Tender Document / Contract. The below mentioned rates shall be applicable only if specifically agreed & approved by OWNER / CONSULTANT.

-

-

-

... More
Skilled (Diploma/ Degree/ Safety Engineer / Sr. Computer Operator/ Supervisor /Rigger Operator/ Operator/ Fitter/ Welder/ Electrician/ Rigger/ Instrument technician / Foreman/ Plumber/ Mason/ Gas cutter/ etc.)

10

-

-

... More
Semi-skilled (Assistant - Fitter/ Welder/ Electrician/ Mason /etc. )

12

-

-

... More
Un-skilled (Helper/ Sweeper/ Office boy/ etc. )

12

-

-

... More
GENERAL ITEMS

-

-

-

... More
Installation of general items mentioned below, as required.

1

-

-

... More
Installation of below listed items referrs to the quantity of items as mentioned in doc. 'BILL OF QUANTITIES - SUPPLY (INSTRUMENTATION)'.

-

-

-

... More
Office tables of reputed make

1

-

-

... More
Office chairs of reputed make

1

-

-

... More
Full size Cupboard of reputed make, sheet steel enclosure (for documentation)

1

-

-

... More
Tool Cabinet, Trolley Mounted

1

-

-

... More
Key Cabinet, Wall Mounted

1

-

-

... More
Tarpaulin (for weather protection of stored Instrumentation items)

4

-

-

... More
Insulated step ladder of reputed make (suitable for indoor work)

1

-

-

... More
Insulated step ladder of reputed make with platform (suitable for indoor work )

1

-

-

... More
SUPPLY ITEMS-PORT

-

-

-

... More
FIELD INSTRUMENTs

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, fasteners, accessories, material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
PRESSURE GAUGES

-

-

-

... More
FLANGED WITH REMOTE SEAL

2

-

-

... More
OTHERS

-

-

-

... More
HOOTER & BEACON (SIREN & STROBE) WITH RESET PUSH BUTTON STATION

1

-

-

... More
Rotameter indicator

1

-

-

... More
Control Panel with Panel mounted instruments (At Port)

1

-

-

... More
Handheld Communicator (HART) with software installed

1

-

-

... More
JUNCTION BOXES

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I Unit rate of supply shall be inclusive of mandatory spares as specified, required fasteners, tag plates, glands & plugs as including in schedule of quantities of Junction Boxes etc. as per specifications

-

-

-

... More
WEATHERPROOF JUNCTION BOXES.

-

-

-

... More
40 Terminals

5

-

-

... More
20 Terminals

1

-

-

... More
EX-ROOF/FLAME PROOF/WEATHER PROOF HAND SWITCHES/PUSH BOTTON

-

-

-

... More
PUSH BUTTON STATION

1

-

-

... More
TUBE AND TUBE FITTINGS

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, and material inspection at Vendor work shop and MOC shall as per TKIS-INDIA specification-REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
TUBE - SS316/SS304/SS304L

-

-

-

... More
1/4" OD X 1 mm WT

5

-

-

... More
3/8" OD X 1 mm WT

5

-

-

... More
12mm Tube(OD) x 1 mm WT-SS316

50

-

-

... More
INSTRUMENT CABLE

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
SIGNAL CABLES, MULTISTRANDED, ARMOURED

-

-

-

... More
1 PAIR X 1.0 mm2 Screened

250

-

-

... More
2 PAIR X 1.0 mm2 Screened

250

-

-

... More
6 PAIR X 1.0 mm2 Screened

250

-

-

... More
2 PAIR X 1.5 mm2 Screened

250

-

-

... More
CONTROL CABLES, MULTISTRANDED, ARMOURED

-

-

-

... More
3 CORE X 2.5 mm2

250

-

-

... More
12 CORE X 1.5 mm2

250

-

-

... More
EARTHING CABLES; UNARMOURED

-

-

-

... More
1 CORE X 6 mm2

50

-

-

... More
1 CORE X 16 mm2

50

-

-

... More
CABLE GLANDS

-

-

-

... More
Supply charges including charges for transportation, material inspection at Vendor work shop , required certificates and MOC shall as per TKIS-INDIA specification-REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
SIGNAL, CONTROL, POWER CABLES

-

-

-

... More
M20 DOUBLE COMPRESSION WITH CHECK NUTS

35

-

-

... More
M25 DOUBLE COMPRESSION WITH CHECK NUTS

25

-

-

... More
M32 DOUBLE COMPRESSION WITH CHECK NUTS

5

-

-

... More
Plugs-suitable for M20 glands

25

-

-

... More
CANOPY/SUNSHED AL/GI/FRP

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, fasteners,(U Clamps, etc..) material inspection at Vendor work shop, MOC as per TKIS-INDIA specification--REFER AS PER CLAUSE ------ OF GENERAL SPECIFICATION INSTRUMENT INSTALLATION TENDER PART-I

-

-

-

... More
FOR TRANSMITTERS (Single transmitter/instrument) (FRP )

10

-

-

... More
FOR LCP (FRP )

2

-

-

... More
FOR PUSH BOTTON/HAND SWITCHES (FRP )

1

-

-

... More
STRUCTURAL STEEL

-

-

-

... More
Supply charges including charges for transportation, unloading at site, MTC, material send for testing to test laboratory on sample basis, etc. MOC shall as per TKIS-INDIA specification Supply charges including charges for required fasteners like nut bolts, anchor fasteners etc.

-

-

-

... More
2" CLASS “B” PIPE AS PER IS 1239 -Part I

25

-

-

... More
CABLE TRAYS Supply charges including charges for transportation, unloading at site, MTC, fasteners, coupler plates, Z supports ,material inspection at Vendor work shop and erection contractor shall ensure MOC as per tender specification Unit rate of supply including required Clamps, Coupler Plates, Fasteners etc.

-

-

-

... More
LADDER TRAYS FRP

-

-

-

... More
300 mm wide

10

-

-

... More
PERFORATED TRAYS FRP

-

-

-

... More
50 mm wide

10

-

-

... More
100 mm wide

10

-

-

... More
150 mm wide

10

-

-

... More
LADDER/ PERFORATE TRAY COVERS

-

-

-

... More
SUTABLE FOR WIDTH 300 MM

10

-

-

... More
SUTABLE FOR WIDTH 150 MM

10

-

-

... More
SUTABLE FOR WIDTH 50 MM

10

-

-

... More
INSTALLATION ITEMS-PORT

-

-

-

... More
FIELD INSTRUMENT INSTALLATION

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, required hardware/fasteners, consumables, tagging, tools & tackles, manpower etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
TRANSMITTERS (PNEUMATIC + ELECTRONIC

-

-

-

... More
RADAR TYPE LEVEL TRANSMITTER

2

-

-

... More
LOOP POWER LOCAL INDICATORS

2

-

-

... More
PRESSURE GAUGES

-

-

-

... More
WITH REMOTE SEAL (FLANGED)

2

-

-

... More
OTHERS

-

-

-

... More
HOOTER & BEACON (SIREN & STROBE) WITH RESET PUSH BUTTON STATION INSTALLATION

2

-

-

... More
Control Panel with Panel mounted instruments(PORT AREA) ( 1.8m x2mX.8m)

1

-

-

... More
LCP/DCS/PLC CABINETS/ANALYSER SHELTERS/MONITORS/PRINTORS/FURNITURES

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, erection, alignment, required hardware’s/fasteners, plugging of spare entries, tools & tackles, manpower, lifting equipment's ,trolley, etc.MOC of hardware's shall as per TKIS -India specification ). All complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
LCP/DCS/PLC CABINETS/MONITORS/PRINTORS/FURNITURES

-

-

-

... More
SUMP PANEL: SIZE 500W X 250D X 500W

1

-

-

... More
Workstations including ES Cum OS,PRM,OPC etc. station with table,chairs

2

-

-

... More
Printers including printer tables

1

-

-

... More
JUNCTION BOXES

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, required hardware’s/fasteners, plugging of spare entries, Tagging, box-up, suitable greasing for screws/L key screws, tools & tackles, manpower, etc. (MOC of hardware's shall as per TKIS -India specification). All complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
WEATHERPROOF JUNCTION BOXES

-

-

-

... More
40 Terminals

5

-

-

... More
20Terminals

1

-

-

... More
EX-ROOF/FLAME PROOF/WEATHER PROOF HAND SWITCHES/PUSH BOTTON

-

-

-

... More
PUSH BUTTON STATION / CONTROL / LOCAL PANELS

1

-

-

... More
TUBE AND TUBE FITTING

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, surface cleaning, painting, fabrication, installation, accessories installation (fittings, valves manifold, etc.), welding, radiography, Hydro/Pneumatic testing, clamping, tagging, consumables, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge. REFER HOO-UP DOCUMENT FOR BOM & MOC.

-

-

-

... More
TUBE - SS316/SS304/SS304L

-

-

-

... More
1/4" OD X 1 mm WT

5

-

-

... More
3/8" OD X 1 mm WT

5

-

-

... More
12mm Tube(OD) x 1 mm WT-SS316

50

-

-

... More
INSTRUMENT CABLE LAYING

-

-

-

... More
Installation charges including handling, shifting from site-store / yard to the installation location, meggering, continuity test, Cable glanding, termination, cable dressing, clamping, cable tagging, ferruling, supply of consumables( like lugs, sleeve for shield/drain, sealing compounds etc.) hardware's/fasteners for clamping/dressing, making holes for cable gland/cable entries ( JBs, Panels ,etc.), tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge. Main cables will be laid from unit to SRR/CR through trays, ducts & trenches as per layout drawings

-

-

-

... More
SIGNAL CABLES ,MULTISTRANDED,ARMOURED

-

-

-

... More
1 PAIR X 1.0 mm2 Screened

250

-

-

... More
2 PAIR X 1.0 mm2 Screened

250

-

-

... More
4 PAIR X 1.0 mm2 Screened

250

-

-

... More
2 PAIR X 1.5 mm2 Screened

250

-

-

... More
SERIAL COMMUNICATION CABLEARMOURED/UNARMOURED

-

-

-

... More
PRE-FAB CABLES (INCLUDING CAT5,PATCH CORD CABLES,ETHERNET CABLES ETC.)

25

-

-

... More
MODBUS CABLES

25

-

-

... More
SPECIAL CABLE UNARMOURED FOR MAGNETIC/VORTEX/CONDUCTIVITY /DENSITY TRANSMITTER

25

-

-

... More
CONTROL CABLES, MULTISTRANDED, ARMOURED

-

-

-

... More
3 CORE X 2.5 mm2

250

-

-

... More
12 CORE X 1.5 mm2

250

-

-

... More
EARTHING CABLES; UNARMOURED

-

-

-

... More
1 CORE X 6 mm2

50

-

-

... More
1 CORE X 16 mm2

50

-

-

... More
CANOPY /SUNSHED AL/GI/FRP

-

-

-

... More
Installation charges including transportation from material store to working location, supporting wherever require for instruments, JBs , etc. (like integrated inline instruments, close couple mounted instruments, etc.), hardware's/fasteners, consumables etc. Fabrication, installation, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
PREFABRICATED. CANOPIES

-

-

-

... More
Single transmitter/instrument

10

-

-

... More
Hand switch/Push button

1

-

-

2

-

-

... More
STANCHIONS FOR INSTRUMENTS

-

-

-

... More
Installation charges including transportation from TKIS/Client material store to working location, fabrication, surface cleaning, painting, suitable clamps with pipe line (for close couple hook-ups etc.), hardware's/fasteners, grouting, clamps, consumables, tools & tackles, manpower etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
FLOOR MOUNTING

5

-

-

... More
STRUCTURE MOUNTING

1

-

-

... More
PLATFORM MOUNTING-Single instrument

1

-

-

... More
PLATFORM MOUNTING-Two instrument

1

-

-

... More
STRUCTURAL STEEL

-

-

-

... More
Installation charges including transportation from TKIS/Client material store to working location, fabrication, installation, surface cleaning, painting , consumables, tools & tackles, manpower, etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
STRUCTURAL STEEL

1

-

-

... More
2" PIPE CLASS “B” AS PER IS 1239 -Part I

25

-

-

... More
INSTRUMENT CALIBRATION

-

-

-

... More
Calibration charges including handling, shifting from site-store / yard to the installation location, restore to safe place after calibration, removable and reinstallation from/to package units, if required, require tools & tackles, manpower, calibrators, calibration laboratory, changing range / engg. unit etc. as per data sheet, trouble shooting, zero elevation & subtraction, preparation of reports, hardware/fasteners, consumables, Labelling (with range, date, tag), etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
TRANSMITTERS (PNEUMATIC + ELECTRONIC

-

-

-

... More
RADAR TYPE LEVEL TRANSMITTER

2

-

-

... More
LOOP POWER LOCAL INDICATORS

2

-

-

... More
PRESSURE SWITCHES

-

-

-

... More
WITH REMOTE SEAL

2

-

-

... More
STROKE CHECKING/CALIBRATION FOR CONTROL VALVES AND ON-OFF VALVES

-

-

-

... More
(Stroke checking/Calibration charges including adjustment of positioners w.r.t. mA, feed backs (limit switches), feed back transmitters (positioner transmitters), seat leak test as per project requirement, oil free instrument air subject to it not available in the plant, tools & tackles, manpower, calibrators, test benches, hardwares, consumables, Labelling (with range, date, tag), ensure flow direction of installed valves if doing on line calibration/stroke checking, etc. all complete as per specification and direction of Engineer-in-Charge. Control/ on-off valves with mechanical stopper shall be checked for proper stopper adjustment as required for the process before installing on line.

-

-

-

... More
ON-OFF VALVE WITH SOV AND TWO FEED BACK

2

-

-

... More
LOOP CHECKING

-

-

-

... More
Loop checking charges including consumables, tools-tackles, continuity test (cold loop) of each cable if its not done after cable laying, ensure flow direction of in line instruments (like orifice type flow annubars/venturi, magnetic, mass, vortex flow meter, rota meter, Control valves, ON-OFF valves, etc.), trouble shooting, tools & tackles, manpower, calibration if require etc. all complete as per specification and direction of Engineer-in-Charge.

-

-

-

... More
LOOP CHECKING FOR ANALOG AND DIGITAL

-

-

-

... More
ANALOG INPUT

10

-

-

... More
ANALOG OUTPUT

2

-

-

... More
DIGITAL INPUT

24

-

-

... More
DIGITAL OUTPUT

24

-

-

... More
FREE ISSUE INSTRUMENT ITEMS INSTALLAED BY OTHER CONTRACTORS AND WHERE ONLY SUPERVISION/CHECKING IS IN THE SCOPE OF INSTRUMENT CONTRACTOR Contractor need to work in close co-ordination with Piping Contractor during installation of inline instrument. Contractor need to supervise and assist Piping contractor for lifting / shifting of instrument to avoid damaged during shifting. Supervison and checking of In-line instrument prior to installation and during installation for flow direction, inlet and outlet distance, Instrument mounting as per vendor installation catalogue or as per guidlines issued by tkIS- Site -in-charge.

-

-

-

... More
BUTTERFLY ON/OFF VALVE

1

-

-

... More
PREFABRICATED CABLE TRAYS

-

-

-

... More
Handling, shifting from site-store / yard to the installation location, unpacking, erection, alignment, assembly and installation of prefabricated galvanized steel ladder type / perforated cable trays / FRP cable trays (above ground or inside concrete trenches) with all associated accessories such as bends, reducers, T-joints, fixing clamps, earthing continuity conductors, paint touchup if required, manpower, etc. - as recommended by MANUFACTURER / applicable construction documents, fixing of cable trays / associated accessories to steel supports, stenciling with paint as required and other associated work so as to ensure the completeness of installation work

-

-

-

... More
Site fabrication of cable tray accessories such as elbows,bends, reducers, T-joints etc. from cable tray straight runs as per the site requirement is included in the scope.

-

-

-

... More
Fabrication and installation of steel support / bracket for cable trays / accessories as per the site requirement.

-

-

-

... More
Supply of all fixing hardware as per the site requirement is included in the scope.

-

-

-

... More
Cable Trays Perforated (GI) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
50 mm wide

50

-

-

... More
100 mm wide

30

-

-

... More
150 mm wide

10

-

-

... More
Cable Ladders (GI) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
300 mm wide

10

-

-

... More
Cable Tray Covers (GI) and Accessories

-

-

-

... More
50 mm wide

10

-

-

... More
100 mm wide

10

-

-

... More
150 mm wide

10

-

-

... More
300 mm wide

10

-

-

... More
Separators for Cable Ladders (GI)

-

-

-

... More
300 mm / 600 mm wide

10

-

-

... More
Cable Trays Perforated (FRP) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
50 mm wide

10

-

-

... More
100 mm wide

10

-

-

... More
150 mm wide

10

-

-

... More
Cable Ladders (FRP) and Accessories

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
300 mm wide

10

-

-

... More
Cable Tray Covers (FRP) and Accessories

-

-

-

... More
50 mm wide

10

-

-

... More
150 mm wide

10

-

-

... More
300 mm wide

10

-

-

... More
Separators for Cable Ladders (FRP)

-

-

-

... More
300 mm / 600 mm wide

5

-

-

... More
Cable Trays Perforated (Epoxy painted) and Accessories (For PORT)

-

-

-

... More
Installation of cable tray accessories such as bends, reducers, T-joints etc. is considered in cable tray running length.

-

-

-

... More
150 mm wide

10

-

-

... More
MANPOWER SUPPLY RATES PER DAY

-

-

-

... More
Note: These rates for man power are applicable only after total completion of Instrumentation Installation & Instrumentation Commissioning activities. Providing technical assistance during pre-commissioning / commissioning phase by deploying different categories of skilled personnel as listed below .The quoted man-months rates shall be inclusive of all wages, travel / accommodation expenses, including PPE’s, all tools & tackles etc. and other costs which the bidder shall be entitled to claim by way of Man-Month Rates for the services. Prior to deployment of personnel at site, Contractor shall submit the detailed CVs of such persons proposed to be posted at site to Owner for concurrence & approval. The Owner and Contractor shall jointly maintain a record of all such personnel chargeable at Man-Month Rates deployed each day which shall be used as the basis for calculating payments due to the Contractor for the services covering assistance during pre-commissioning & commissioning phase. For deployment covering part of the month, payment shall be made on pro-rata basis considering 30 days in a month.Should the performance of any of Contractor’s personnel be found unsatisfactory by Owner,the replacement of such personnel shall be carried out by Contractor immediately. The below mentioned rates for Manpower Supply shall be applicable only for work performed over and above the Instrumention works already defined as forming part of CONTRACTOR’s scope in the Tender Document / Contract. The below mentioned rates shall be applicable only if specifically agreed & approved by OWNER / CONSULTANT.

-

-

-

... More
Skilled (Diploma/ Degree/ Safety Engineer / Sr. Computer Operator/ Supervisor /Rigger Operator/ Operator/ Fitter/ Welder/ Electrician/ Rigger/ Instrument technician / Foreman/ Plumber/ Mason/ Gas cutter/ etc.) (For PORT)

2

-

-

... More
Semi-skilled (Assistant - Fitter/ Welder/ Electrician/ Mason /etc. ) (For PORT)

4

-

-

... More
Un-skilled (Helper/ Sweeper/ Office boy/ etc. ) (For PORT)

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.