Municipality Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Municipality - ORULB Tender
Civil And Construction
Road Construction
Eprocure
Opening Date23 Aug 2024
Closing Date3 Sep 2024
Tender Amount₹ 16,60,796
Costs
EMD
₹ 16,608Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ORULB_104352_38Bid Award Id
ViewTender No
EO/SNGM/W_02/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Blinding road surface with Crusher dust including cost and conveyance of materials, cess, T&P etc
15.41
14253
924.96
... More
Providing,laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in machanical mix plant,carriage of mixed material by tripper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with 3 wheeled steel roller 8-10 tonnesto achieve the desired density as per Clause 406 of MoSRT&H Specification for Road & Bridge works (4th Revision) including cost and conveyance of materials, cess, T&P etc
139.36
297681
2136.06
... More
Cement concrete (1:2:4) with 12 mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc.all complete,as per OPWD specification required for the work to finished items of work.
3.99
30297
7593.39
... More
Providing, spreading, laying on road surface and compacting, proper camber layer of paver inter locking blocks minimum 80 mm thickness and inscribed machine mixed and compacted having crushing strength not less then M30 including filling the interstices with sand, watering, brooming, bliding and consolidation with wooden hammer as per OPWD specification and relevent code including cost of materials, conveyance, royality, labour, cess, T&P required to the work etc. complete to finished items. 98
942.41
585330
621.1
... More
Providing and laying at or near ground level factory made kerb stone of M30 grade cement concrete 600mm x 300mm x 150mm in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of EIC. (See Item no 16.69 of DSR & Item no 3 of AoR 2006) 100
27.06
252090
9315.99
... More
Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete,as per OPWD specification required for the work to finished items of work
41.1
252582
6145.57
... More
Requirement of HYSD / MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge, cess
1.36
12311
9052.61
... More
Finishing walls with water proofing weather coat of approved shade on new work two coat to give an even shade inculding cost of paint, Cess
114.74
9329
81.31
... More
Transporting the excavated earth by mechanical means within 5.00 Km lead including initial lead and lift, loading & unloading etc all complete. (Per 1 cum)
291.76
46880
160.68
... More
Cost of disply board, Paint & Letter writing over disply board - LS 303
1
5000
5000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements