Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 14,800Document Cost
₹ 7,080Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ORULB_111670_3Bid Award Id
ViewTender No
MCCMCCTC_Div-IIINo32/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://cmccuttack.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dewatering of waste water using 5 Hp pump including cost of fuel etc complete as per direction of Engineer in charge.
60
233
13986
... More
Earth work in excavation of foundation in all kind of soil with all leads and lift including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the engineer- in- charge.
63.36
293
18567.01
... More
Dismantaling of old damage cement concreete including stacking the useful materials for reuse and removing the debrise away from work site etc complete.
19.2
840
16128
... More
Filling in foundation trenches, plinths, sites of foundation, in the space below the grade level slab and other underground structures with good quality river sand (inclusive of cost, conveyance, royalties, taxes, loading and unloading) laying in layers not exceeding 225mm in thickness, filling, watering and compacting / ramming, in each layers or complete as per specification, drawing and direction of the Engineer-in-Charge.
13.44
611
8215.87
... More
Removal of old pre cast RCC Slab from Drain wall and refixing the same after construction work is over etcx complete as per direction of Engineer in charge.
100
109
10940
... More
Removal of excavated earth & Dismantaling materials away from work site by mechanical means up to 5km lead and lift etc complete as per direction of Engineer in charge.
98.11
278
27350.12
... More
R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour charges for bending, binding wires and labour charges for bending, binding and tying the grills.
13.44
6947
93380.85
... More
Cost of Display board
1
6000
6000
... More
Dismantaling of brick or stone masonry under 3 meter height including stacking the useful materials for reuse and removing the debrise away from work site etc complete.
57.6
1576
90823.68
... More
Construction of Coffer Dam with sand bags placing in proper position in Drain & removing the same after construction work is over etc complete as per direction of Engineer in charge.
250
23
5800
... More
Wall
34.56
11883
410686.5
... More
Slab -
5.4
7814
42197