Municipal Corporation Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 27,390Document Cost
₹ 7,080Tender Fee
Refer Documents
Summary
Construction Of Cc Road And Drain At Nua Harijana Sahi
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ORULB_105443_346Bid Award Id
ViewTender No
BeMC (BAM)/ 298/ 2024-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://www.berhampur.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Conveying the excavated earth by mechanical carriage from the site after excavation & disposal from work site with initial lead of 5 KM.etc. complete.
153
24492
160.08
Filling in foundation, trenches and plinth with river sand, well watered and compacted in layers with top surface dressed and leveled to proper gradient including cost of all labors, materials, conveyance, and royalties, sundries and T&P etc all complete as per direction of the Engineer -in-charge
72.35
112387
1553.39
Providing and laying of Cement Concrete of grade 1: 4 :8 using 40mm metal with lowering and compacting in proper thickness , watering & curing for the required period including cost of all labours, materials, conveyance, and royalties, sundries and T&P etc all complete as per direction of the Engineer -in-charge.
45.83
252815
5516.37
R.C.C M20 grade with 20mm down graded CBHG chips including hoisting laying & all cost , conveyance royalty and cost towards curing compaction etc. complete to work site as per the specification approved by the deptt. and direction of EIC.
221.89
1392270
6274.6
Supplying Fitting and placing Un- coated HYSD steel reinforcement bar in position with binding using binding wire 18 to 20 gauge as per direction of EIC
66.57
615982
9253.15
Rigid smooth centering & shuttering in RCC work including false work and dismantling the same after casting with cost of all materials etc.complete.
628.2
156936
249.82
6mm thick cement plaster (1:4) to R.C.C / CC surface finished smooth including al cost of material labour T&P etc complete with cement punning and as per direction of EIC
120
25768
214.74
Providing laying spreading & compacting BHG metal and packig the voids with small stones and hand packing the same to proper camber including conveying spreading of filler materials and filling the interstices by spreading the same same over surface, watering and consolidation with PRR including hiring charges of PRR complete and including cost conveyance of Metal and filler metal etc. complete as per the direction of Engineer-in charge.
-
-
-
Gr -I
20
55124
2756.22
Gr -II
15
43118
2874.59
Spreading polythene over the prepared base of the road surface including cost of materiallabour. Etc complete as per the direction of EIC.
40.5
6008
148.36
Filling Bitumen, Cement Jue in the expansion cost of material labour T&P ec.complete as per the direction of EIC.
260
3257
12.53
Provision for site Clean, Pre & Post Photograph of work site, and any other expenditure etc Complete .
1
1572
1572
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements