Municipal Corporation Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 19,900Document Cost
₹ 7,080Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ORULB_111246_7Tender No
MC(CMC)CTC_Div-I_No.26/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://cmccuttack.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with all leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge.
70.88
293
20770.68
... More
Earthwork in slushy soil (in water upto 0.60m. depth requiring the aid of pans & vessels) within 50 mtrs. initial lead and 1.50 mtrs. initial lift including T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge.
18
277
4989.42
... More
Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-charge.
54.75
611
33468.67
... More
Providing Cement concrete for unreinforced cement concrete works of proportion (1:3:6) with 4cm. Size crusher broken hard Granite(CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of all labour, materials( inclusive of cost , conveyance, royalities, taxes, loading and unloading) & equipments for handing, transportion, batching, mixing, placing in position vibrating , curing for- days complete as per specificationdrawing and direction of the Engineer- in - charge with all taxes, lead,T & P etc all complete
88.5
6374
564107.85
... More
R.C.C. work of M20 having minimum compressive strength (working stress) 200kg./cm2 in 15cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12mm to 20mm size (1/2” to 3/4”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills.
Bed
13.5
6947
93797.73
... More
wall
20.25
11883
240636.62
... More
Slab
4.5
7814
35164.17
... More
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification
16.34
9382
153303.51
... More
Providing & laying cement concrete of prop. (1:2:4) in foundation bed and floors using 12mm nominal size down graded, screened, washed hard black crusher broken granite Chips of approved quality & from approved quarry including laying in the layers not exceeding 150 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge.
75.9
8019
608672.46
... More
Rigid smooth centering and shuttering for R.C.C. work including false work and dismantling after casting including cost of all labour, materials, T&P required etc. complete as per the direction of Engineer-in-Charge.
30
247
7425
... More
Removing the Dimantle &excavated materials from site by mechanical means up to 5km lead with loading and unloading complete as per yhe direction of EIC
213.79
278
59598.24
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%