Municipal Corporation Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Municipal Corporation - ORULB Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date27 Jan 2025
Closing Date6 Feb 2025
Tender Amount₹ 41,99,295 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Deployment of 5HP diesel pumpset for dewatering with assembly of all accessories like suction, delivery pipe, including cost of fuel, labricant, transportation and handing charges with wages of pump operator.

35

516

18090.8

... More
Earth work in slushy soil in water upto 0.60 mtr depth requiring the aid of pan & vessel providing two extra lift beyond iitial lift of 1.50mtr

572.07

274

156775.78

... More
Earth work in laterite rock or any hard rock other then granite or disintegrated rock removed by chiselling including dressing and levelling the bed.

269.55

1963

529261.43

... More
Earth work in excavation of foundation in laterite rock or any hard rock other then granite or disintegrated rock removed by chiselling including dressing and levelling the bed.

79.94

2356

188354.63

... More
C:C: (1:3:6) using 4 c.m size H.G Metal including cost of all labour, materials , T&P etc complete.

19.02

5881

111858.9

... More
C:C: (1:4:8) using 4 c.m size H.G Metal including cost of all labour, materials , T&P etc complete.

8.47

5728

48516.16

... More
R.C.C. M25 grade using with 20 mm and down graded stone chips including centering and shuttering but excluding cost of M.S Rod i.Base

5.18

6991

36214.11

... More
ii. Column

3.38

18510

62564.54

... More
iii. Grade beam

2.79

7863

21937.91

... More
iv. Roof beam

0.45

18510

8329.6

... More
v. Roof slab

1.01

14167

14309.09

... More
vi. Coping slab

1.93

14601

28181.4

... More
Labour charges for cutting, bending, binding and tying the grill including the cost of M.S. rod.

15.32

9376

143644.76

... More
Filling of Excavated earth in F & P.

12.33

112

1380.96

... More
Removal of excavated earth and other dismantlled materials away from work site by Mech. Means

953.51

160

153209.99

... More
L.S.Masonry in C:M: (1:4) in F&P using old stones available from dismantlling including all labour and materials excluding cost of stone

15.9

4480

71241.38

... More
Laterite stone masonry in C:M: (1:4) in F&P including cost of all labour and materials etc complete.

64.14

6104

391565.08

... More
Fly ash brick masonry in C:M (1:4) in F & P including cost of all labour, materials , T&P etc complete.

2.34

5646

13212.9

... More
C.C. M25 grade using with 20 mm and down graded stone chips including cost of all labour, materials , T&P etc complete.

34.08

6551

223290.46

... More
20mm thick C:P (1:4) over stone masonry including cost of all labour, materials , T&P etc complete.

112.54

288

32467.79

... More
6 mm thick cement plaster over RCC/ cc surface including close deep chipping and slurry treatment

419.46

207

87075.7

... More
16 mm thick C:P (1:6) over brick masonry including cost of all labour, materials , T&P etc complete.

28.28

265

7520.22

... More
12mm thick C:P (1:4) over brick work including cost of all labour, materials , T&P etc complete.

20.49

196

4023.01

... More
Cement washing two coats over plastered surface including cost of all labour and materials etc complete.

328.07

27

8857.89

... More
Painting two coats with weather seal coat over a coat of water bound wall primer.

328.07

180

59147.74

... More
Labour charges for fixing chequered tile over floor, landing and on road surface over 25mm thick bed of C:M:(1:1) jointed with neat cement slurry including cost of all labour and cost of materials

191.44

1037

198670.69

... More
Labour for fixing granite tile on wall surface on 12mm C:P(1:3) jointed with neat cement slurry including the cost of all labour and cost of materials

14

2511

35162.82

... More
Supplying, fitting & fixing of Stainless steel of 304 grade in hand railling using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe beacing of size 32mm x 32mm x 2mm in 3 rows as per approved design.

79.05

3607

285203.7

... More
Suppliying following garden utilities and FRP made from approved firm and installing at site i. 4 seater concrete chair

5

5000

25000

... More
ii. FRP dustbin (frog) model No FGU-15

2

5800

11600

... More
iii. POMMEL HORSE

1

39000

39000

... More
iv. TREAD MILL

1

58000

58000

... More
Installation charges of 5 nos 4 seater concrete chair, 2nos FRP frog dustbin Pommel Horse-1 no and Tread Mill-1 no.

9

1500

13500

... More
Transportation cost of above materials from Flora Fountains from Berhampur to BBSR

1

6680

6680

... More
Supplying M.S grill and M.S gate of approved design made of MS angle and MS SQR bar 12 mm thick

817

139

113685.55

... More
Labour charges for fixing of M.S grill and M.S gate in proper position

35.45

93

3308.19

... More
Painting two coats with enamel paint over a coat of red oxide primer on iron works

17.73

255

4532.67

... More
Supplying and fitting, fixing of sitting positioned in meditation mode statue of lord shiva made in granite stone being 5'.0 height with excellent finishing including the cost of stone, carving charges, transportation and installation over the platform in proper position.

1

550000

550000

... More
Mural art painting over wall surface including scrapping the wall surface priming and weather coating two coats including the cost of all labour and materials

218

580

126647.1

... More
Labour for drilling a perfectly vertical bore hole of specfied dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling ngs or combination drilling rigs (1650 cfm/ 200 psi) as required to suit the site condition as per the direction of Engineer-in-charge induding use of own rigs with its accessories, tools and plant and consumables etc for lowering of 200 mim dia PVC/GI pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium hard and boulder formation (GI/PVC casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the Bore well)

95

1049

99655

... More
Lowering the following size G.I/ PVC pipes with or without slotted pipes as per the necessity from ground level and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc. complete and keeping the top of the casing pipe threaded including plugging bore wells to prevent entry of foreign materials from above

95

216

20558

... More
Supplying, assembling, lowering and fixing in vertical position unplasticized PVC casing (CM) pipe of required dia, conforming to 15: 12818, including required hire and labour charges, fittings & accessories, materials, loading and unloading, all taxes, sundries and T&P etc all complete as per direction of the Engineer -in-charge

60

1419

85140

... More
Cleaning and developing the bore well using their own compressor continuously worked till clear and adequate discharge is obtained from the bore well including supply and use of all necessary equipment and labour as per the direction of Engineer-in-Charge

1

7893

7893

... More
Supplying all materials, labour, tools and plant and providing sanitary sealing by cement concrete grouting of annular space around GI/PVC/MS housing pipe upto 5 mtrs below ground level (as per drawing) to plug the bore hole including cost of cement etc all complete as per direction of Engineer in charge. Minimum one metre of casing pipe to be inserted in the bore into the rock at the bottom to ensure sanitary sealing

1

353

353

... More
Providing and fixing suitable size threaded mild steel cap or spol welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell all as per requirement and direction of Engineer-in-charge.

1

276

276

... More
Providing and fixing M.S. clamp of required dia to the top of casing/housing pipe of borewell as per IS: 2800 (part 1), including necessary bolts & nuts of required size all complete for borewell all as per requirement and direction of Engineer-in-charge.

1

1200

1200

... More
providing istallation testing commissioning of following capacity Vertical submersible pump set to install inside the production well and reservoir including all suction, delivery overflow pipe line valve arrangement &all electrical instilation like pannel board, stater 3 core flat submersible cable etc all complete as per specification &direction of E.I.C

1

19000

19000

... More
Providing and fixing of UPVC pipes (grade similar to ASTM standard) on the surface with proper clamping system, having thermal stability for hot & cold water supply, including all UPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step UPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.

12

352

4228.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.