Municipal Corporation Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Municipal Corporation - ORULB Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date20 Nov 2024
Closing Date4 Dec 2024
Tender Amount₹ 16,77,220
Costs
EMD
₹ 16,800Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Construction Of Internal Road And Drain At Rickshaw Biju Adarsha Colony In Ward No.14
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ORULB_107212_7Bid Award Id
ViewTender No
BMC-EE-Tender Cell-34/2024-25 Dt. 16.11.2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.bmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Carriage of Excavated earth by mechanical means within 5 km lead including loading and unloading with all cost conveyance T & P sundries etc complete as per direction of Engineer- in-charge.
158.26
160
25429.22
... More
Labour for laying sub-base with quarry dust in layers not exceeding 100 mm. watering and compacting to required density in OMC with P.R.R. but including costs conveyance of sub-base materials.
80.21
1927
154624.03
... More
Cement concrete in prop. (1:4:8) in foundation using 4 cm size HGCB metal of quality from approved quarry washed and cleaned including hoisting, lowering, laying concrete, ramming, watering, curing etc to required level lincluding cost, conveyance, royalties and taxes of all materials, shoring, shuttering and dewatering with cost of all labours, hire and running charges of washing pumps, sundries and T & P such as concrete mixer, concrete vibrator required for the work etc, complete as per specificationand direction of E-I-C
80.21
5718
458683.29
... More
CC M-25 with 20mm size downgraded CBHG chips including all cost, conveyance, royalty and taxes etc. complete of all materials to work site as per the specificatiosn approved by the department and the directions of the Engineer-in-Charge
127.05
6614
840309.97
... More
Rigid smooth centering and shuttering for RCC or CC work(F&P) including false works, supplying of centering materials, its hire charges, cost of labour T & P and dismentalling after casting the concrete etc all complete as per direction of EIC
212.89
248
52984.06
... More
Providing 12mm thick Bitumenious expansion joint board etc complete as per the direction of EIC
32.29
362
11712.87
... More
Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/bent up M.S. rods/Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 guage binding wire required for R.C.C. work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wires will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S. rods or Tor steel linear measurements of rod for finished item of works etc complete as per direction of EIC
5.5
9373
51555.57
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements