Municipal Corporation Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Municipal Corporation - ORULB Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date9 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 18,49,699 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and filling in foundation trenches and plinth with coarse river sand including cost of all labour,T&P etc complete

53.31

518

27633.77

... More
Cement concrete of proportion (1:4:8) in foundation and floors using 40mm. size metal including cost of all materials labour,T&P required for the work etc complete

13.22

5728

75724.16

... More
Cement concrete of prop.(1:2:4) in foundation and floors using 12mm to 20mm size black hard (crusher broken) granite chips including cost of all materials labour,T&P required for the work etc complete

3.72

7682

28579.27

... More
Reinforced cement concrete of M-20 grade with centring & shuttering including cost of all materials labour T&P etc complete. Colomn Base

5.67

6612

37495.65

... More
plinth beam

6.68

7484

49999.07

... More
Column Ground Floor

5.99

18132

108611.04

... More
First Floor

0.76

20630

15678.97

... More
Stair case

0.52

15629

8127.13

... More
Lintel

3.05

14223

43381.98

0.92

1236

1137.17

... More
Head Room

0.92

1236

1137.17

... More
Stair case

1.71

15629

26725.76

... More
Roof beam

5.49

18132

99545.01

10

13789

137898.9

... More
Cutting, straightening coiled or bent up M.S. rods, HYSD steel or Tor Steel of Fe-500 grade including cost of all materials labour T&P etc complete.

38.65

9376

362393.61

... More
Fly Ash Brick in cm (1:6) masonry using fly ash bricks of Foundation & plinth including splays cutting including cost of all materials labour T&P etc complete.

18.09

5425

98139.15

... More
Fly Ash Brick in cm (1:6) masonry using fly ash bricks of Super structure including splays cutting including cost of all materials labour T&P etc complete. Ground Floor

26.86

5460

146679.24

... More
First Floor

9.15

5837

53412.3

... More
16mm thick cement plaster in CM (1:6) over the Wall surface including cost of all materials labour,T&P required for the work etc complete Ground floor

100.65

265

26764.85

... More
First Floor

36.6

274

10050.36

... More
Head Room

13.5

274

3707.1

... More
12mm thick cement plaster in CM (1:6) over the Wall surface including cost of all materials labour,T&P required for the work etc complete Ground floor

120.32

183

22120.83

... More
First Floor

38.2

191

7314.92

... More
Head Room

15

191

2872.35

... More
6mm thick cement plaster in CM (1:4) over the RCC surface including cost of all materials labour,T&P required for the work etc complete

103.7

174

18097.72

... More
Supplying fitting and fixing of Vitrified floor Tile of size 600x600mm with 20 mm thick CM(1:4) including cost of material labour T&P required for the work etc complete.

74.42

1457

108490.96

... More
Supplying fitting and fixing of Ceramic Glazed wall Tile of size 300x450mm with 12 mm thick CM(1:3) including cost of material labour T&P required for the work etc complete.

48.6

1374

66791.95

... More
Supplying fitting and fixing MS grill including cost of all materials labour,T&P required for the work etc complete

378

95

35910

... More
Supplying fitting fixing of M.S. Tubular roofing member approved quality in proper position including cost of all material labour T&P etc complete.

183.6

118

21756.6

... More
Supplying fitting and fixing MS sheet door shutter with angle choukath including cost of all materials labour,T&P required for the work etc complete

101.72

263

26823.56

... More
Supplying, fitting and fixing in position of Pre coated Galvanized Iron Profile sheet including cost of all materials, labour,T&P required for the work etc complete.

20.46

697

14264.71

... More
Cement washing one coat over wall surface including cost of all materials labour,T&P required for the work etc complete Ground Floor

324.67

18

5870.03

... More
First Floor

15

18

279.3

... More
Head Room

28.5

18

530.67

... More
Providing one coat primer over wall surface including cost of all materials labour,T&P required for the work etc complete Ground floor

324.67

65

21158.74

... More
First Floor

15

69

1036.5

... More
Head Room

28.5

69

1969.35

... More
Providing Cement based wall putty over wall surface including cost of all materials labour,T&P required for the work etc complete

204.35

83

17104.1

... More
Plastic Emulsion paint two coats over the Interior wall surface including cost of all materials labour,T&P required for the work etc complete

204.35

107

21986.02

... More
Weather coat two coats over the Exterior wall surface including cost of all materials labour,T&P required for the work etc complete

120.32

95

11517.03

... More
Enamel painting two coats over a coat primer over wood/iron surface including cost of all materials labour,T&P required for the work etc complete

25.99

255

6643.83



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.