Municipal Bodies Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 6,110Document Cost
₹ 4,000Tender Fee
Refer Documents
Summary
Repair Of E.o. Quarter, Ward No.10, Barbil
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ORULB_105326_19Bid Award Id
ViewTender No
2688/BBL MPLTYTender Authority
Municipal Bodies ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
12 mm thick CP in CM(1:6) including watering and curing cost, conveyance, royalties & taxes of all & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge.
63.96
12190
190.6
... More
Supplying all material and labour and T&P for fitting and fixing Gypsum celling Booard complete as per direction of Department.
7.5
12030
1604
... More
Finishing wall with wall primer to receive paint/distemper with approved quality and approved shade confirming to ISI with cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.
1776.67
135382
76.2
... More
Distempering two coats with approved quality and approved shade confirming to ISI over a coat of cement wash including watering, curing, cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.
222.01
19159
86.3
... More
Painting two coats with Plastic emulsion paint of approved quality and approved shade confirming to ISI over a coat of cement wash including watering, curing, cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.
629.09
64041
101.8
... More
Weather coat painting two coats with approved quality and approved shade confirming to ISI over a coat of primer with cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.
874.89
105249
120.3
... More
Supplying, fitting and fixng .30m dia exhaust fan complete including all cost.
1
2078
2078.61
... More
Supplying and fixing 50 Watt Led bulb
1
820
820
... More
Supplying and fixing 15 Watt Led Bar light.
5
1876
375.25
... More
Supplying and fixing 6 litre capacity Gizer including all cost.
1
8000
8000
... More
Supplying all labour T& P for fixing of Invetor and Supplying of Invetor Stand complete.
1
2500
2500
... More
Supplying all labour T& P for fixing of water filter complete.
1
1000
1000
... More
Supplying all labour T& P for fitting and servising of splite AC complete.
1
3500
3500
... More
Supplying all materials and labour T& P for fitting and fixing Door/Window screen Bars complete.
12
12000
1000
... More
Laour for fixing AC sheet in roof drilling hole in windties including fixing of ridges vallets wind ties etc. exluding cost of fittings.
70
17045
243.5
... More
Supplying of A.C. sheet including all cost and carriage etc complete.
77
16100
209.1
... More
Cost of AC Ridge
10
2076
207.69
... More
Painting with Enamel paint of approved quality and approved shade confirming to ISI over a coat of primer including watering, curing, cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.
101.78
18462
181.4
... More
Reinforced Cement Concrete of M-20 grade using 20 mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. with cost of centering and shuttering for the work etc all complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge. (including centering and shuttering).
7.27
49604
6823.2
... More
Supplying,laying of tiles on floor over 25mm thick cement mortar (1:1) to proper level including jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost,conveyance,royality of all materials including all labour & T&P charges etc complete as per the direction of the engineer-in-charge. Chequired tiles 300mmx300mm size.
32.2
21780
676.4
... More
Provision of photographs at different stage of execution of the work with all cost.
10
300
30
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements