Municipal Bodies Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Municipal Bodies - ORULB Tender

Eprocure
Opening Date25 Jan 2021
Closing Date8 Feb 2021
Tender Amount₹ 37,20,383 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Construction Of Pickle Manufacturing Unit Near M.a.c. Site At Palbani.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
C.C work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including cost,carriage and royalty , tax of materials

4.38

-

4993.57

... More
R.C.C work of M-20 grade incl.centering & shuttering etc. complete in all respect. (i) Column base footing

9.72

-

5140.12

... More
Column & Beam

4.68

-

10602.44

... More
Plinth band

6.27

-

5482.07

... More
Lintel

3.08

-

8508.57

... More
Chajja

7.8

-

772.81

... More
Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete.

21.86

-

6578.41

... More
Brick work (1:6) wiyh fly ash bricks etc.complete. Foundation & Plinth

15.39

-

4265.96

... More
Brick work (1:6) wiyh fly ash bricks etc.complete. Super Structure

41.17

-

4298.96

... More
12mm thick cement plaster in CM(1:6) over brick work (Unit-1 sqm)

159.65

-

139.33

... More
16mm thick cement plaster in CM(1:6) over brick work (Unit-1 sqm)

189.9

-

188.94

... More
Wall painting two coats with weather coat with primer complete with all cost.

190.62

-

112.19

... More
Wall painting two coats with plastic emulsion paint.

156.6

-

74.55

... More
Supplying & fitting of M.S. Iron door & window with grill including all cost etc. complete.

300

-

65

... More
Painting two coats with approved paint over new wood & iron work.

8.1

-

131.45

... More
Fixing tiles in floor,treads &landing on 25mm. th.bed of CM(1:1) jointed with neat cement slurry etc.complete in all respect. Vetrified Tile

180

-

893

... More
IRON WORK Iron work with I.S.M.B. Column, truss made with hollow sq.pipe with wrough & put in trusses & recored rock and including cost of iron etc.

60.34

-

7560.1

... More
Cost of material with labour for fixing G.C.I. Sheet in roof drilling holes in wind tiles including fixing of ridges valley wind tiles etc.

242.8

-

437.69

... More
Roof mounted ventilators (Stainless steel) including cost & fitting charges.

4

-

5000

... More
Side Clearance (Engage of unskilled labour)

50

-

303.4

... More
Storage of finished goods Earthwork in foundation & plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge . In hard gravelly soil

25.34

-

181.84

... More
Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge .

43.79

-

282.06

... More
C.C.(1:4:8) with 40mm CBHG metal including cost,carriage and royalty of materials (Unit-1 cum)

12.29

-

4399.55

... More
C.C work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including cost,carriage and royalty , tax of materials

9.55

-

4993.57

... More
R.C.C work of M-20 grade incl.centering & shuttering etc. complete in all respect. (i) Column base footing

3.65

-

5140.12

... More
Column

1.62

-

10602.44

... More
Plinth band

2.63

-

5482.07

... More
Lintel

1.8

-

8508.57

... More
Chajja

3.6

-

772.81

... More
Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete.

8.98

-

6578.41

... More
Brick work (1:6) wiyh fly ash bricks etc.complete. Foundation & Plinth

11.97

-

4265.96

... More
Brick work (1:6) wiyh fly ash bricks etc.complete. Super Structure

16.03

-

4298.96

... More
12mm thick cement plaster in CM(1:6) over brick work (Unit-1 sqm)

117.9

-

139.33

... More
16mm thick cement plaster in CM(1:6) over brick work (Unit-1 sqm)

118.65

-

188.94

... More
Wall painting two coats with weather coat with primer complete with all cost.

132.15

-

112.19

... More
Wall painting two coats with plastic emulsion paint.

117.9

-

74.55

... More
Supplying & fitting of M.S. Iron door & window with grill including all cost etc. complete.

300

-

65

... More
Painting two coats with approved paint over new wood & iron work.

8.1

-

131.45

... More
IRON WORK Iron work with I.S.M.B. Column, truss made with hollow sq.pipe with wrough & put in trusses & recored rock and including cost of iron etc.

47.33

-

7560.1

... More
Cost of material with labour for fixing G.C.I. Sheet in roof drilling holes in wind tiles including fixing of ridges valley wind tiles etc.

143.6

-

437.69

... More
BATH ROOM Earthwork in foundation & plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge . In hard gravelly soil

7.26

-

181.84

... More
Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge .

9.07

-

282.06

... More
C.C.(1:4:8) with 40mm CBHG metal including cost,carriage and royalty of materials (Unit-1 cum)

2.77

-

4399.55

... More
R.C.C work of M-20 grade incl.centering & shuttering etc. complete in all respect. Roof

2.31

-

9068.34

... More
Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete.

2.08

-

6578.41

... More
Brick work (1:6) wiyh fly ash bricks etc.complete. Foundation & Plinth

7.36

-

4265.96

... More
Brick work (1:6) wiyh fly ash bricks etc.complete. Super Structure

12.97

-

4298.96

... More
12mm thick cement plaster in CM(1:6) over brick work (Unit-1 sqm)

79.2

-

139.33

... More
16mm thick cement plaster in CM(1:6) over brick work (Unit-1 sqm)

31.5

-

188.94

... More
Wall painting two coats with weather coat with primer complete with all cost.

31.5

-

112.19

... More
Wall painting two coats with plastic emulsion paint.

50.4

-

74.55

... More
Supplying & fitting of M.S. Iron door & window with grill including all cost etc. complete.

150

-

65

... More
Painting two coats with approved paint over new wood & iron work.

3

-

131.45

... More
Supplying, fitting, fixing of PVC door with chau katha including cost of all materials etc.

2

-

3500

... More
Fixing tiles in floor,treads &landing on 25mm. th.bed of CM(1:1) jointed with neat cement slurry etc.complete in all respect. Vetrified Tile

18

-

893

... More
Fixing tiles in dados,skirtings & risers of steps on 12mm.th.C.P(1:3) jointed with neat cement slurry etc.complete in all respect. Vetrified Tile

45.6

-

904.22

... More
PH WORK Fixing Plastic seat and cover for EWC. (a) White EWC with seat cover

2

-

1855.6

... More
Fixing 10 Ltr Low Level Flushing Cistern (a) LL Cistern (Hindware)

2

-

1231.78

... More
Fixing PVC waste pipe (a) 30mm dia x 0.90 mtr long PVC Waste pipe.

4

-

84.3

... More
1000 ltr sintex tank with brick work and base concrete for fixing. (a) 1000 ltr sintex DL-ISI

1

-

10513.4

... More
Fitting and fixing PVC pipes (ASTM-sch-80) to walls or ceiling and floor 20mm dia. (a) 20mm ASTM (Sch-80) pipe

30

-

108.97

... More
15mm dia CP Concealed Stopcock (Jaguar)

4

-

978.3

... More
15mm dia CP Pillar Cock (Jaguar) with labour

4

-

698.55

... More
Standing Urinal including labour charges (Flatback Large) (Cat 60002)

1

-

4223.38

... More
Wash Basin (24" x 18") (Hindware)

2

-

2696.47

... More
Supplying & Fixing of CP Shower rose with shower arm 65mm

2

-

1130.5

... More
Supplying all materials, labour, T&P and Construction Septic Tank as per PH Specification & design with Earthwork in excavation in all kinds of soil & refilling the cavity around the tank, Sand filling , CC(1:4:8) using 40mm size HBJG Metal in foundation, Fly Ash Brickwork in CM(1:3) , moulding & shaping the bed with CC(1:2:4) USING 12MM SIZE CBHG chips, cover slab in RCC (1:1 1/2:3) using 12mm size CBHG CHIPS, 12mm thick Cement Plaster in CM(1:3) to inside & outside wall with punning to inside, MS reinforcement including cost of MS Rod, carriage of extra earth after refilling to safer place within 5 KM, fitting & fixing of Vent pipe, Cowel, Tees etc. including cost, conveyance, royalty, takes of all materials, watering for curing all complete. 20 Users' Septic Tank [Inside Size - 2.30m x 1.10m x (Liquid depth 1.30m + 1.00m)]

1

-

41620

... More
Supplying all materials, labour, T & P and constructing 1.20m (4'-0") dia and 2.55m (8'-6") deep Soak pit with dry Fly Ash brick walling up to 2.10 mtr. (7'-0") Height and Fly Ash Brick masonary in C.M. (1:4) for the remaining 0.45m (1'6") height of wall at top, 12mm thick Cement Plaster in C.M. (1:3) inside and outside, inside filled with dry brick Khoa of sizes 40mm to a height of 1.95m. (6'-6") from bottom covered by means of 75mm (3") thick RCC perforated slab in CC (1:1 1/2:3) fitted with iron rings including Earth Work in excavation and refilling of cavity around the pit and painting to iron work etc. as per instruction of Engineer-In-Charge.

1

-

11299

... More
Open Meeting Space Earthwork in foundation & plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge . In hard gravelly soil

8

-

181.84

... More
Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge.

19.88

-

282.06

... More
C.C.(1:4:8) with 40mm CBHG metal including cost,carriage and royalty of materials (Unit-1 cum)

7.16

-

4399.55

... More
C.C work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including cost,carriage and royalty , tax of materials

6.36

-

4993.57

... More
R.C.C work of M-20 grade incl.centering & shuttering etc. complete in all respect. (i) Column base

2.18

-

5140.12

... More
Column

0.58

-

10602.44

... More
Plinth band

2.48

-

5482.07

... More
Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete.

4.19

-

6578.41

... More
IRON WORK Iron work with I.S.M.B. Column, truss made with hollow sq.pipe with wrough & put in trusses & recored rock and including cost of iron etc.

39.79

-

7560.1

... More
Cost of material with labour for fixing G.C.I. Sheet in roof drilling holes in wind tiles including fixing of ridges valley wind tiles etc.

96.6

-

437.69

... More
Open Space Earthwork in foundation & plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge . In hard gravelly soil

4.5

-

181.84

... More
Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge.

12

-

282.06

... More
C.C.(1:4:8) with 40mm CBHG metal including cost,carriage and royalty of materials (Unit-1 cum)

16.5

-

4399.55

... More
C.C work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including cost,carriage and royalty , tax of materials

12

-

4993.57

... More
Rigid & smooth centering & shuttering for RCC works including false works and dismantling them after casting including cost of materials complete in ground floor

24

-

97.7

... More
Rainwater harvesting Earthwork in foundation & plinth trenches within 50mtr initial lead, 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge . In hard gravelly soil

6

-

181.84

... More
A) Rainwater harvesting for ground water discharge. Labour for drilling a perfectly vertical bore well of specified diameter for a specified depth below GL through hard & boulder formation by means of calix rig as required to suit site condition as per direction of E I C including deployment of rig with its accessories T & P and consumable etc for a finished bore suitable for lowering 125 mm x100 mm nominal dia PVC or GI casing pipes fitted with socket and with or without well screen as per the necessary for the soft and hard formation drilled by combination drilling method. a) Drilling of 125mm dia 0.00m to 60.00mtr

15

-

630.6

... More
10mm.th.dry brick khoa well watered &rammed

20

-

280.12

... More
Laying of 110mm PVC pipe for lining.(6 kg / cm2)

150

-

319.54

... More
Laying of 160mm PVC pipe for lining.

27

-

615.51

... More
Production well A) WATER SUPPLY (SINKING OF 125MMx100MM DIA PVC PIPE BORE WELL ) Labour for drilling a perfectly vertical bore well of specified diameter for a specified depth below GL through hard & boulder formation by means of calix rig as required to suit site condition as per direction of E I C including deployment of rig with its accessories T & P and consumable etc for a finished bore suitable for lowering 125 mm x100 mm nominal dia PVC or GI casing pipes fitted with socket and with or without well screen as per the necessary for the soft and hard formation drilled by combination drilling method. a) Drilling of 125mm dia 0.00m to 60.00mtr

45

-

630.6

... More
b) Drilling of 100mm dia 61.00m to 100.00mtr

35

-

630.6

... More
Supplying of T&P for lowering the following sizes of PVC or G.I. pipes with or without strainer as per necessary and fitted & fixed up in perfectly vertical position including cutting & threading the pipes as may be necessary & supplying all jointing materials, extra socket (GI or PVC heavy quality) tools and plants eyc complete and keeping the top of the casing pipe threaded including plugging the tube well to prevent entry of foreign materials, from above as per the direction of Engineer-in-charge (Including cost of pipes) a) From 0.00mtr to 60.00mtr

45

-

144

... More
b) From 60.00mtr to 100.00mtr

35

-

144

... More
Supplying all labour T&P and reaming the pilot bore to the following sizes & depths without casing pipes including withdrawing the boring pipes washing the bore well all complite as oer direction of Engineer-in-charge.. a)Reaming 100 mm to 150 mm dia

80

-

130.3

... More
b) Reaming 125 mm to 200 mm dia

80

-

147.1

... More
c) Reaming 200 mm to 250 mm dia

80

-

175.1

... More
Supplying all labour T&P materials and packing the bore well with washed gravels of river singles of required size and specification around the well screen & pipes etc complite as per direction of E I C.

4.1

-

1405.7

... More
Supplying all materials, labour T&P and providing sanitary sealing by means of cement concrete grouting of annuar space around GI/PVC pipe upto 5mtr below ground (as per drawing) to be pulg the bore hole including cost of cement etc all complete as per as per direction of Engineer-in-charge. Minimum one metre of casing pipe to be inserted in the bore into therock at the bottom to ensure sanitary sealing.

5

-

237.7

... More
Cleaning and developing the tube well with own compressor continuously worked till and adequate discharge is obtained from the well including supply and use of necessary equipment and labour as per direction of Engineer-in-charge. (1 tube well)

1

-

1722

... More
a) Supplying al materials, labour T&P for lowering of vertical S/S Pump set in 100mm dia production well with supply of 32mm dia special quality PVC pipe of 40mtr length having long threaded heavy quality G.I. nipple, socket clamp with provision with nylone rope from pump in well to ground level for extra safety to pump set including bore well cover and double clamp etc all complete.

1

-

13850

... More
b) S/F 125mm dia PVC ASTM ( Sch-80) pipe

45

-

495.64

... More
c) S/F 100mm dia PVC ASTM ( Sch-80) pipe

15

-

461

... More
d) S/F 100mm dia PVC Strainer (Sch-80)

20

-

640

... More
e) 100mm dia PVC Top cap (Sch-80)

1

-

127

... More
f) 100 mm dia Bottom Cone (Sch-80)

1

-

229

... More
g) 125x100mm dia PVC R/S (Sch-80)

1

-

601

... More
h) 125mm dia x 300mm long PVC Threaded Nipple (Sch-80)

1

-

300

... More
Fitting & fixing of Submersible Pump Set 1. Cost of 1.5 HP three phase submersible pump set with discharge of 5.0lps & 50 mtr Head along with suitable panel board, power capacitor etc. 1 set, 4mm2x3 core flat copper cable-200M, 35mm2 x3 1/2 core round armoured cable 40M with 100% stand by pump set. a) Submersible pump set - 1.5 HP

1

-

24067

... More
b) Auto start control pannel board (BCH/L &T etc)

1

-

5845

... More
c) 4mm2 x 3 core PVC flat cable (Havels/Finolex/ L&T etc)

120

-

142

... More
d) 15mm ASTM (SCH.80) PIPE

15

-

34

... More
e) Supply & fixing of Poly propoline rope 12mm (1/2'') as per IS specification suitable for submersible pump hanging.

75

-

20

... More
f) Supply & fixing of MS Clamp of size 400mm x 80mm x 12mm with bolt hole of specific sizes etc.

1

-

550

... More
g) S/F of MS Well cover of size 300 x 300 x 12mm plate with hole for column pipe , cable, steel/pvc wire rope etc.

1

-

850

... More
h) 32mm HDPE pipe for encasing of flat cable.

60

-

20

... More
i) Labour charge for laying & encasing of flat cable with excavation of earth work & refilling etc. & making good the damages.

1

-

1000

... More
Supplying all labour T & P for fitting & fixing the following nominal PVC pipes (ASTM Sch-80) on walls & ceiling confirming to pipe fittings including cutting the pipes to required length 7 threading of pipes & mending good the damages all complete. (a) 16 mm dia PVC ASTM pipe

15

-

51.1

... More
(b) 20 mm dia PVC ASTM pipe

15

-

57.2

... More
Supplying all materials labour T & P for fitting fixing of following PH fitting as per PH specification & direction EIC. (a) 15 mm dia bib cock

6

-

360.5

... More
Cutting holes through existing brick work including making good to the same in C.M. (1:4) for taking PVC/GI pipe & fitting all complete. (a) 250mm to 350mm thick wall

4

-

33.7

... More
Cost of Photo & Signboard

1

-

3000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.