Municipal Bodies Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Municipal Bodies - ORULB Tender

Civil And Construction
Eprocure
Opening Date25 Apr 2022
Closing Date6 May 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC M20

4.96

-

4113.8

... More
HYSD

6.98

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

14.94

-

105.8

... More
Above Plinth Level

20.15

-

734.6

... More
6 MM CEMENT PLASTER

22.7

-

123.9

... More
MOUDLING

22.7

-

426

... More
PUTTY WORK

22.7

-

71.4

... More
EMULSION PAINT

22.7

-

76.4

... More
M.S GATE

674.1

-

75

... More
PAINTING

9.63

-

133

... More
FILLING IN FOUNDATION

4.17

-

102.55

... More
WAITING HALL EARTH WORK EXCAVATION

34.7

-

184.6

... More
SAND FILLING

31.81

-

303.6

... More
P.C.C (1:4:8)

16.87

-

3652

... More
RCC M20 Below PL Level

15.5

-

4113.8

... More
RCC M20 Above Plinth Level

26.01

-

4113.8

... More
HYSD

32.21

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

94.35

-

105.8

... More
Column, footing & Plinth Beam

76.37

-

734.6

... More
Linted

8.86

-

278.9

... More
Slab

146.15

-

436.5

... More
FLY ASH BRICKS 1:6 (SUPER STRUCTURE) A

1.62

-

4008.2

... More
B

27.05

-

4041.2

... More
12MM THICK CEMETN PLASTER (1:6)

118.95

-

130.5

... More
16MM THICK CEMETN PLASTER (1:6)

119.16

-

187.3

... More
6MM THICK CEMETN PLASTER (1:4)

169.82

-

123.9

... More
FLOOR TILES

124

-

902.4

... More
PAINTING

112.5

-

133

... More
MS GRILL/ DOOR & WINDOW

1692.39

-

75

... More
CEMENT PRIMER

278.77

-

58.1

... More
WEATHER COAT

119.16

-

61.3

... More
EMULSION PAINT

278.77

-

76.4

... More
FILLING IN FOUNDATION

23.13

-

102.25

... More
BATHING HALL EARTH WORK EXCAVATION

87.11

-

184.6

... More
SAND FILLING

22.87

-

303.6

... More
P.C.C (1:4:8)

22.04

-

3652

... More
RCC M20

52.68

-

4113.8

... More
HYSD

49.72

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

152.57

-

105.8

... More
Column, footing & Plinth Beam

152.34

-

734.6

... More
Linted

18.79

-

278.9

... More
Slab

136.28

-

436.5

... More
FLY ASH BRICKS 1:6 (SUPER STRUCTURE) A

1.6

-

4008.2

... More
B

41.27

-

4041.2

... More
12MM THICK CEMETN PLASTER (1:6)

395.68

-

130.5

... More
16MM THICK CEMETN PLASTER (1:6)

141.02

-

187.3

... More
6MM THICK CEMETN PLASTER (1:4)

285.95

-

123.9

... More
FLOOR TILES

110.34

-

902.4

... More
DOOR AND WINDOW

50.4

-

3725

... More
MS GATE AND PAINGING (A)

210

-

75

... More
B. PAINGING

3

-

133

... More
CEMENT PRIMER

681.63

-

58.1

... More
WEATHER COAT

141.02

-

61.3

... More
EMULSION PAINT

681.63

-

76.4

... More
FILLING IN FOUNDATION

58.07

-

102.25

... More
STORAGE ROOM EARTH WORK EXCAVATION

5.24

-

184.6

... More
SAND FILLING

14.58

-

303.6

... More
P.C.C (1:4:8)

14.58

-

3652

... More
Cement Concrete (1:2:4)

0.3

-

5230.2

... More
RCC M20

4.41

-

4113.8

... More
HYSD

4.12

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

7.5

-

105.8

... More
Column, footing & Plinth Beam

17.13

-

734.6

... More
FLY ASH BRICKS 1:6 (SUPER STRUCTURE)

4.76

-

4041.2

... More
12MM THICK CEMETN PLASTER (1:6)

57.48

-

130.5

... More
STEEL STRUCTURAL TRUSS WORK ON ROOF

0.84

-

95000

... More
G.C.I SHEET

189.85

-

571.6

... More
M.S GATE

110.25

-

75

... More
PAINTING

7.09

-

133

... More
FILLING IN FOUNDATION

3.49

-

102.55

... More
CONSTRUCTION OF SHOP EARTH WORK EXCAVATION

4.63

-

184.6

... More
SAND FILLING

3.59

-

303.6

... More
P.C.C (1:4:8)

0.66

-

3652

... More
P.C.C (1:2:4)

1.95

-

5230.2

... More
RCC M20 Below Pl.Level

1.95

-

4113.8

... More
Above Plinth Level

4.88

-

4113.8

... More
HYSD

7.33

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

15.85

-

105.8

... More
Column, footing & Plinth Beam

20.89

-

734.6

... More
Slab

28.65

-

436.5

... More
FLY ASH BRICKS 1:6 (SUPER STRUCTURE)

10.15

-

4008.2

... More
12MM THICK CEMETN PLASTER (1:6)

45.06

-

130.5

... More
16MM THICK CEMETN PLASTER (1:6)

50.41

-

187.3

... More
6MM THICK CEMETN PLASTER (1:4)

30.74

-

123.9

... More
ROLLING SHTTER

8.25

-

3450

... More
PAINTING

24.75

-

133

... More
CEMENT PRIMER

75.8

-

58.1

... More
WEATHER COAT

50.41

-

61.3

... More
EMULSION PAINT

75.8

-

76.4

... More
FILLING IN FOUNDATION

3.09

-

102.25

... More
CREMATORIUM PLATFORM EARTH WORK EXCAVATION

6.04

-

184.6

... More
SAND FILLING

5.28

-

303.6

... More
P.C.C (1:4:8)

5.92

-

3652

... More
RCC M20

10.73

-

4113.8

... More
HYSD

11.38

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

6.4

-

105.8

... More
Column, footing & Plinth Beam

26.93

-

734.6

... More
Slab

31.06

-

436.5

... More
Steps

0.54

-

602.6

... More
FLY ASH BRICKS 1:6 (SUPER STRUCTURE)

1.72

-

4008.2

... More
6MM THICK CEMETN PLASTER (1:4)

76.02

-

123.9

... More
16MM THICK CEMETN PLASTER (1:6)

6.14

-

187.3

... More
FLOOR TILES (A)

11.22

-

1071.5

... More
(B)

47.59

-

960.3

... More
MS PYRE

1

-

80000

... More
FILLING IN FOUNDATION

4.03

-

102.55

... More
CONST. OF OFFICE & LOCKER ROOM EARTH WORK EXCAVATION

25.36

-

184.6

... More
SAND FILLING

15.1

-

303.6

... More
P.C.C (1:4:8)

2.96

-

3652

... More
P.C.C (1:2:4)

1.86

-

5230.2

... More
RCC M20 Below Pl.Level

9.34

-

4113.8

... More
Above Plinth Level

11.83

-

4113.8

... More
HYSD

20.26

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

54.95

-

105.8

... More
Column, footing & Plinth Beam

48.33

-

734.6

... More
Linted

1.35

-

278.9

... More
Slab

62.86

-

436.5

... More
FLY ASH BRICKS 1:6 (SUPER STRUCTURE) A

1.04

-

4008.2

... More
B

17.82

-

4041.2

... More
12MM THICK CEMETN PLASTER (1:6)

78.24

-

130.5

... More
16MM THICK CEMETN PLASTER (1:6)

83.64

-

187.3

... More
6MM THICK CEMETN PLASTER (1:4)

66.04

-

123.9

... More
FLOOR TILES

48.56

-

902.4

... More
MS DOOR AND WINDOW

574.44

-

75

... More
B. PAINGING

38.55

-

133

... More
CEMENT TWO COAST PER 1 SQUM

141.1

-

24.4

... More
CEMENT PRIMER

83.64

-

61.3

... More
EMULSION PAINT

144.28

-

76.4

... More
FILLING IN FOUNDATION

16.91

-

102.25

... More
CONST. OF PARKING AND PATHWAY EARTH WORK EXCAVATION

35.97

-

184.6

... More
SAND FILLING

9.81

-

303.6

... More
P.C.C (1:2:4)

46.6

-

5230.2

... More
CENTERING AND SHUTTERING KERB WALL

588.6

-

105.8

... More
6MM THICK CEMETN PLASTER (1:4)

408.75

-

123.9

... More
WEATHER COAT

408.75

-

61.3

... More
MS DOOR AND WINDOW

574.44

-

75

... More
PAVER BLOCK

685.63

-

843.6

... More
LANDSCAPE Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading any neatly leveling within a lead of 50m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth , sludge or manure).

620.34

-

38.3

... More
MEDICINES Suppy of Vermi Compost (50kg bag)

8

-

750

... More
Supply of Neem Cake (50 kg Bag)

4

-

750

... More
Supply of Hormone Medicine (Totozyma or equivalent)

4

-

750

... More
Supply of Insecticide Medicine (Roger or Equivallant)

4

-

750

... More
Supply of Antitermite Medicine (Classic-50 or Equivalent)

4

-

750

... More
SUPPLY OF FERTILIZERS Supply of Fertilizer Di Amonia Phosphate (DAP) (PPL, IFCO or equivalent) 50 Kg Bag

6

-

1175

... More
Supply of Super Phousphate (PPL, IFCO or equivalent) 50 Kg Bag

3

-

570

... More
Supply of Potas (PPL, IFCO or equivalent) 50 Kg Bag

3

-

655

... More
Supplying and stacking of good earth at site including royality carriage and good earth cost up to 5 k.m lead complete ( earth measured in stacks will be reduced by 20% for payment).

620.34

-

340.9

... More
Supplying and stacking at site dump manure from approved source, including carriage, (and manure cost )upto 5 k.m lead complete (manure measured in stacks will be reduced by 8 % for payment): Screened through sieve of I.S. designation 20mm

155.09

-

161.2

... More
Spreading of dump manure and /or good earth in required thickness as per direction of office in-charge (cost of sludge , dump manure and/or good earth to be paid sparately)

775.42

-

25.3

... More
Mixing earth and manure in the required proportion specified or directed by the officer -in-charge

775.42

-

18.1

... More
Providing & laying Selection no.1 grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same , with sprinkler and maintance for 30 days or more till the grass established properly as per direction of officer in charge.

6203.38

-

75.65

... More
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, hedge, flower beds, foliages, creepers etc. including hoeing, weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide, lawn mover and brush cutter with fuel will be provided by the Department & other T & P material/articles shall be provided by the contractor.)and as per direction of officer in charge.

6203.38

-

2.32

... More
Providing & transplanting best quality healthy TREES species [Acacia nilotica (Babul), Alstonia scholaris (Devil's tree), Anogeissus latifolia (Axle wood), Artocarpus integrifolia (Jack fruit), Azadirachta indica (Neem), Bauhinia purpurea (Orchid tree), Bombax malabaricum (Semal), Butea frondosa (Flame of the forest/Palash), Callistemon lanceolatus (Bottle brush),Cassia fistula (Amaltas), Cassia siamea, Chorisia speciosa (Silk cotton tree), Dalbergia sisso (Sheesham), Delonix regia (Gulmohur), Dendrocalamus strictus (Bamboo), Emblica officinalis (Aonla), Eugenia jambolana (Jamun), Ficus benjamina, Ficus elastica (Rubber), Ficus glomerata, Ficus religiosa(Peepal), Holorrhaena antidy senterica, Lagerstroemia flos reginae, Madhuca indica (Mahua), Mangifera indica (Mango), Melia azardirachta, Morus indica (Mulberry), Ocimum americanum, Plumeria obtusa, Pterospermum acerifolium (Kanak champa), Samanea saman (Rain tree), Saraca indica (Sita ashok), Shorea robusta (Sal), Tamarindus indica (Tamarind), Tectona grandis (Teak), Terminalia arjuna, Terminalia chibula, Terminalia bellarica, Ziziphus jujuba (Ber) or any other native/drought tolerant species or as per the owners chouce] of approx height 2500mm.

50

-

450

... More
Providing & transplanting best quality SHRUBS and HEDGES special [Allamanda schoti, Bauhinia tomentosa, Caesalpinia pulcherrima, Calliandra haematocephala, Cassia biflora, Cestrum diurnum, Clerodendron inerme, Cyprus rotundus, Duranta goldii, Duranta variegated, Ficus blakei, Ficuspanda, Ficus nuda, Ficus reginold, Ficus starlite, Gardenia jasminoides, Hamelia patens dwarf, Heliconia spp., Hibiscus rosa sinensis, Hibiscus variegated, Ixora chinensis, Ixora singaporensis, Jatropha panduraefolia, Jasminum spp., Melaleuca bracteates, Murraya exotica (mock orange), Nerium oleander alba, Nerium oleander roseum, Nerium oleander dwarf, Plumbago capensis, Spider lily, Strelitzia regia, Tabernaemontana coronaria 'dwarf', Tabernaemontana coronaria variegated, Tecoma capensis (Capehoney suckle), Tecoma gaudichaudi, Tecoma stans, Thevetia nerifolia, Thuja spp., Vinca rosea, Vinca rosea alba, Yucca gloriosa or any other native / drought tolerant species or as per the owner's choice] of approx height 450-900mm in erect position without breaking the earth balls around the roots, packing the soil tight around the plant and water properly, including preparation of beds for hedging and shrubbery by excavating 600x600mm deep, pits dug a few days in advance, top soil with manure (compost) 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) along with Urea, N.P.K. mixed in proportion as per the suppliers specifications, flooding with water, dressing including removal of rubbish and surplus earth if any with all leads and lifts etc. all complete. All shrubs to be approved before planting inclusive lf maintenance as specified for one year after planting including rectification / replacement of any damaged work or plant, watering at required frequency, providing and laying manure as required etc. all complete.

130

-

100

... More
Providing and transplanting best quality Edge Plant Species i.e. Duranta goldii, Duranta variegated, or any other native / drought tolerant species or as per the owner's choice along pathways of approx. height 250-400mm in erect position without breaking the earth balls around the roots, packing the soil tight around the plant and water properly including preparation of beds for hedging and shrubbery by excavating 300x300mm deep, pits dug a few days in advance, top soil with manure (compost) 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) along with Urea, N.P.K. mixed in proportion as per the suppliers specifications, flooding with water, dressing including removal of rubbish and surplus earth if any with all leads and lifts etc. all complete. All species to be approved before planting inclusive lf maintenance as specified for one year after planting including rectification / replacement of any damaged work or plant, watering at required frequency, providing and laying manure as required etc. all complete.

200

-

8

... More
Planting best quality pot-grown healthy ORNAMENTAL PLANTS species [Agave spp., Bamboo buddha belly, Bismarckia nobilis, Cycas circinallis, Cycus revoluta, Furcarea watsoniana, Golden bamboo, Phoenix roebelenii, Phoenix sylvestris, Sansveira spp., Washingtonia robusta, Wodyetia bifurcata, Roystonea regia (Royal plam) or any other native / drought tolerant species or as per the owner's choice] of approx. height 1500-2500mm in erect position with minimum stem of species in erect position without breaking the earth balls around the roots, packing the soil tight around the plant and water properly, including preparation of beds by excavating 1200 x 1200 mm deep, pits dug a few days in advance, top soil with manure (compost) 2: 1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) along with Urea, N.P.K. mixed in proportion as per the suppliers specifications flooding with water, dressing including removal of rubbish and surplus earth if any with all leads and lifts etc. all complete. All plants to be approved before planting inclusive of maintenance as specified for one year after planting including rectification / replacement of any damaged work or plant, watering at required frequency, providing and laying manure as required etc. all complete.

20

-

468

... More
Skt PVCpipe 075 mm x 06 kg

150

-

117

... More
Skt PVCpipe 063 mm x 06 kg

150

-

98

... More
Skt PVCpipe 050 mm x 06 kg

300

-

65

... More
PGP Ultra 6" WITH CHECK VALVE

20

-

1300

... More
Control Valve 75 mm Teflon Seal Plain

3

-

1250

... More
Valve Box 10"

4

-

900

... More
3/4"X30 CM STND.SWING JOINT,4S.E

25

-

185

... More
SERVICE SADDLE 50 MM X 25MM(3/4)- HD

25

-

75

... More
PVC NON RETURN/CHECK VALVE 75 MM

1

-

1005

... More
END CAP (PLAIN) 50 MM - HD

15

-

86

... More
TEE (EQUAL) 75 MM - HD

8

-

191

... More
TEE (EQUAL) 63 MM - HD

10

-

74.15

... More
TEE (EQUAL) 50 MM - HD

4

-

39.55

... More
ELBOW (EQUAL) 75 MM - HD

5

-

142.15

... More
ELBOW (EQUAL) 63 MM - HD

5

-

45.15

... More
ELBOW (EQUAL) 50 MM - HD

3

-

30

... More
REDUCER 75X63 MM - HD

5

-

60.45

... More
Solvent Cement 1 lit

1

-

455

... More
REDUCER 63X 50 MM - HD

30

-

30.55

... More
Supply and installation of Submersible pump and motor (1HP, Flow Rate - 5m3/Hr. differential head 40m) with accosseries and installation hardware (motor, duck foot bend, guide rails, baseplate, foundation bolt etc) complete in place, size and capacity, including supply, manufacture, assemble, transporation, testing and commissioning in all respect as per dwawing and specification.

1

-

22880

... More
SECURITY ROOM EARTH WORK EXCAVATION

4.63

-

184.6

... More
SAND FILLING

2.28

-

303.6

... More
P.C.C (1:4:8)

0.66

-

3652

... More
P.C.C (1:2:4)

1.08

-

5230.2

... More
RCC M20 Below PL. Level

1.08

-

4113.8

... More
Above Plinth Level

1.85

-

4113.8

... More
HYSD

4.22

-

7440.7

... More
CENTERING AND SHUTTERING Below Plinth Level

13

-

105.8

... More
Column, footing & Plinth Beam

15.56

-

734.6

... More
Linted

1.26

-

278.9

... More
Slab

17.75

-

636.6

... More
FLY ASH BRICKS 1:6 (SUPER STRUCTURE) A

8.14

-

4041.2

... More
12MM THICK CEMETN PLASTER (1:6)

34.83

-

130.5

... More
16MM THICK CEMETN PLASTER (1:6)

45.6

-

187.3

... More
6MM THICK CEMETN PLASTER (1:4)

14.4

-

123.9

... More
FLOOR TILES

11.03

-

902.4

... More
MS DOOR AND WINDOW

328.77

-

75

... More
MS PAINTING

2.88

-

133

... More
CEMENT WASHING TWO COATS PER 1 SQM

49.23

-

58.1

... More
WEATHER COAT

45.6

-

61.3

... More
EMULSION PAINT

49.23

-

76.4

... More
FILLING IN FOUNDATION

3.09

-

102.55

... More
INTERNAL ELECTRICALWORKS WAITING HALL & BATHING (DETAILS IN ESTIMATE)

1

-

589213

... More
EXTERNAL ELECTRICAL WORKS OF CREMATORIUM

1

-

401395

... More
PH WORKS (DETAILED IN ESTIMATE)

1

-

317945

... More
SEPTIC TANK 50 USERS (DETAILED IN ESTIMATE)

1

-

471768

... More
Supplying all labour, T&P and drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (650 cfm/ 200 psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc for lowering of 125 mm dia PVC/GI pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (GI/PVC casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tube well).

100

-

622.1

... More
Supplying all materials, labour, T&P and Lowering the following size G.I/ PVC pipes with or without slotted pipes as per the necessity from ground level and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc. complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above.

35

-

896.1

... More
Supplying all labour, T&P and Cleaning and developing the tube well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of Engineer-in-Charge.

1

-

3436.3

... More
Supplying all materials,labour T&P for fitting and fixing of IM-II/IM-III hand pumps with 32/65 mm dia G.I pipe 24mtr and C.I cylinders and 12 mm B.S connecting rod including lowering with fitting of extra socket etc.as per the direction of the Engineer-in-charge

1

-

15955.5

... More
WASTE DISPOSAL IN CREMATORIUM (DETAILS IN ESTIMATE)

1

-

45000

... More
MUSIS SYSTEM IN CREMATORIUM AMPLIFIER (Details in Estimate)

1

-

8635.59

... More
MUSIC HORN 40 WATT(Details in Estimate)

2

-

5720.34

... More
SPEAKER (Details in Estimate)

1

-

2711.86

... More
TRANSPORTATION AND INSTALLATION CHARGES

1

-

4500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.