Municipal Bodies Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Municipal Bodies - ORULB Tender

Eprocure
Opening Date28 Jun 2021
Closing Date8 Jul 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

74.11

-

4374.03

... More
Providing & laying 60mm thick interlock paver on 25 mm thick cement mortar cm (1:1) and filling joints with approved quality including cost of all charges etc complete as per direction of EIC.

723

-

831.1

... More
RCC Log Designed Ornamental Gate

-

-

-

... More
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.

3.06

-

184.59

... More
Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charrge .

0.61

-

321.34

... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

0.61

-

4374.03

... More
Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.

-

-

-

... More
Column Base & Footing

1.35

-

4607.86

... More
Plinth Beam

0.34

-

4978.32

... More
Column in Super Structure

0.61

-

11834.82

... More
Circular Arch

0.55

-

8818.08

... More
Supplying,cutting ,straightening of steel HYSD (Fe- 415) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding or jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering ,& laying steels including cost conveyance ,taxes & royalties of all materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. Complete in all respect as per the direction of Engineer in charges.

2.99

-

7404

... More
12mm thick cement plaster in CM (1:4) over RCC work including all costs of labour etc. complete as per direction of E.I.C.

9.72

-

150.18

... More
Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints and primer and labour charges etc. complete.

9.72

-

98.63

... More
Supplying fitting fixing of M.S.Grill using 12mmx12mm size MS square bars, 20mmx5mm MS flats, MS angles of approved size for Grill gate, PCC(1:2:4) for clamp fixing cost & conveyance of all materials, labours , T&P, all fabrication, erection and fitting in position etc all complete as per direction of E.I.C.

441

-

80.1

... More
Painting two coats with enamel paints over one coat of primer with approved quality paints & primer to wood/iron work including cost of paint & primer, T&P and labour charges etc. complete.

6.3

-

180.83

... More
RCC Wood Log Designed 6 Pillar Ornamental Rain Shade (3 Nos)

-

-

-

... More
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.

18.66

-

184.59

... More
Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charrge .

8.58

-

321.34

... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

8.07

-

4374.03

... More
Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.

-

-

-

... More
Column Base & Footing

24.18

-

4607.86

... More
Plinth beam

3.75

-

4978.32

... More
Column in Super Structure

8.88

-

11834.82

... More
Roof Beam

9.21

-

11834.82

8.04

-

8818.08

... More
Supplying,cutting ,straightening of steel HYSD (Fe- 415) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding or jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering ,& laying steels including cost conveyance ,taxes & royalties of all materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. Complete in all respect as per the direction of Engineer in charges.

52.89

-

7404

... More
12mm thick cement plaster in cm (1:4) to outer wall surface on brick work both side including all costs of labour etc. complete as per direction of E.I.C.

374.7

-

150.18

... More
Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints and primer and labour charges etc. complete.

374.7

-

98.63

... More
RCC Wood log designed 1 Pillar ornametal Umbrella rain shade (3 nos.

-

-

-

... More
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.

11.16

-

184.59

... More
Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charrge .

3.66

-

321.34

... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

3.57

-

4374.03

... More
Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.

-

-

-

... More
Column Base & Footing

9.93

-

4607.86

... More
Column in Super Structure

3.3

-

11834.82

... More
Roof Beam

5.52

-

11834.82

2.88

-

8818.08

... More
Supplying,cutting ,straightening of steel HYSD (Fe- 415) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding or jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering ,& laying steels including cost conveyance ,taxes & royalties of all materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. Complete in all respect as per the direction of Engineer in charges.

20.37

-

7404

... More
12mm thick cement plaster in cm (1:4) to outer wall surface on brick work both side including all costs of labour etc. complete as per direction of E.I.C.

93.96

-

150.18

... More
Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints and primer and labour charges etc. complete.

93.96

-

98.63

... More
RCC Wood Log Ornamental Stool & Table (5 Nos)

-

-

-

... More
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.

8.85

-

184.59

... More
Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charrge .

1.95

-

321.34

... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

1.95

-

4374.03

... More
Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.

-

-

-

... More
Column Base

4.9

-

4607.86

... More
Column in Super Structure

2.5

-

11834.82

0.3

-

8818.08

... More
Supplying,cutting ,straightening of steel HYSD (Fe- 415) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding or jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering ,& laying steels including cost conveyance ,taxes & royalties of all materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. Complete in all respect as per the direction of Engineer in charges.

7.2

-

7404

... More
12mm thick cement plaster in cm (1:4) to outer wall surface on brick work both side including all costs of labour etc. complete as per direction of E.I.C.

33.25

-

150.18

... More
Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints and primer and labour charges etc. complete.

33.25

-

98.63

... More
RCC Wood Log Designed Ornamental Benches (40 Nos)

-

-

-

... More
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.

45.2

-

184.59

... More
Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charrge .

9.2

-

321.34

... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

9.2

-

4374.03

... More
Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.

-

-

-

... More
Column Base & Footing

12

-

4607.86

... More
Column in Super Structure

6.4

-

11834.82

11.2

-

8818.08

... More
Supplying,cutting ,straightening of steel HYSD (Fe- 415) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding or jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering ,& laying steels including cost conveyance ,taxes & royalties of all materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. Complete in all respect as per the direction of Engineer in charges.

27.2

-

7404

... More
12mm thick cement plaster in cm (1:4) to outer wall surface on brick work both side including all costs of labour etc. complete as per direction of E.I.C.

282.8

-

150.18

... More
Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints and primer and labour charges etc. complete.

282.8

-

98.63

... More
Mountain Spring

-

-

-

... More
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.

11.25

-

184.59

... More
Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charrge .

6.86

-

321.34

... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

2.5

-

4374.03

... More
Brick masonry work in cm (1:6) in F&P using fly ash bricks (25cmx12cmx8cm) having minimum crushing strength not less than 35 kg /cm2 with dimesional tolerance + 8 %after immersing the bricks for six hour in water before use in F&P and S/S including splays cutting & circular mouilding, hoisting,, watering, curing etc with cost of all labour T&P for the work in all respect as per the direction of Engineer in-charge. Cost and conveyance of all materials labours all taxes T&P etc all complete.

8.29

-

3865.85

... More
Brick masonary work in Super Structure in cm (1:6) including including all labour, materials & royality etc. complete as per direction of EIC.

24.49

-

3899.18

... More
12mm thick cement plaster in cm (1:6) to outer wall surface on brick work both side including all costs of labour etc. complete as per direction of E.I.C.

37.68

-

150.18

... More
Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints and primer and labour charges etc. complete.

37.68

-

98.63

... More
Decorative pebbles

1

-

8000

... More
1 HP MOTER

1

-

15000

... More
RCC Ornamental Arch Bridge

-

-

-

... More
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.

11.34

-

184.59

... More
Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charrge .

1.57

-

321.34

... More
Providing & laying P.C.C. (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC.

1.86

-

4374.03

... More
Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumbs and finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.

-

-

-

... More
Foundation of Column Base

0.86

-

4607.86

... More
Sub-Structure

2.38

-

5497.07

... More
RCC Railing

0.22

-

8818.08

2.49

-

8818.08

... More
Supplying,cutting ,straightening of steel HYSD (Fe- 415) conforming to (IS- 1786) with bending, binding, cranking, hooking, welding or jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering ,& laying steels including cost conveyance ,taxes & royalties of all materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. Complete in all respect as per the direction of Engineer in charges.

5.02

-

7404

... More
12mm thick cement plaster in cm (1:4) to outer wall surface on brick work both side including all costs of labour etc. complete as per direction of E.I.C.

32.4

-

150.18

... More
Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints and primer and labour charges etc. complete.

32.4

-

98.63

... More
Development of children's park .

-

-

-

... More
Supplying, fixing, fitting and colouring of FRP Multiplay system -3 platform including cost of all materials, conveyances to the work site etc complete.

1

-

518200

... More
Supplying, fitting and colouring of FRP Swing including cost of all materials, all taxes, conveyances to the work site etc complete.

1

-

29000

... More
Supplying, fitting and colouring of FRP Sea Saw including cost of all materials, all taxes, conveyances to the work site etc complete.

1

-

15600

... More
Supplying, fitting and colouring of FRP Merry Go Round (New Design) including cost of all materials, all taxes, conveyances to the work site etc complete.

1

-

57900

... More
Supplying, fitting and colouring of FRP Spring including cost of all materials, all taxes, conveyances to the work site etc complete.

1

-

13400

... More
Supplying, fitting and colouring of FRP Elephant Slide including cost of all materials, all taxes, conveyances to the work site etc complete.

1

-

32300

... More
Providing , fitting, fixing of water foutain ( water height 3.0 mtr ) of approved design including all labour , T& P , taxes etc complete including transportation to the site ,painting etc complete as per the direction of the Engineer -in -charge.

1

-

160000

... More
Provision of ornamental electrification works with GI/CI poles inside the park etc (General/Solar).

-

-

-

... More
Supplying,fitting and colouring of GI Decorative Light Pole with Dome and bulb including cost of all materials, all taxes, conveyance to the work site etc. complete.

20

-

20800



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.