Municipal Bodies Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 31,005Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ORULB_108965_1Tender No
3/2024-25Tender Authority
Municipal Bodies ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Accessories for 11/0.4kV DP mounted 63 kVA S/S on 11Mtr RS Joist Pole with double disc arrangement alongwith LT Distribution box with MCCB arrangement(except cost of pole and transformer)
1
125208
125208.2
... More
11 KV line on 9 mtr long 300 KG PSC pole with 55 mm sq AAAC and 2 no.s single pole Cut point per Km with double disc arrangement (Except cost of PSC pole)
0.65
135206
87884.49
... More
11KV Single core 55mm2 Insulated conductor (except cost of pole)
1976
312
616512
... More
End Termination kit For Single core Insulated Cable
29
3152
91422.79
... More
Insulated Piencing Clamp
58
1930
111969.58
... More
Cable Ties
97
836
81145.35
... More
11 KV Cut Point on 11 mtr long RS Joist Pole
3
27950
83852.7
... More
LT Extension of 3ph 50 mm sq AB Cable (8 mtr long PSC Pole)(except cost of pole)
0.2
449258
89851.73
... More
11 kV stay Sets
6
1239
7434
... More
11 kV DP with AB Switch on 11 mtr Long RS Joist Pole
1
66515
66515.46
... More
Stock,Storage & Insurance@3% of A=B
1
57634
57634.02
... More
T&P @ 2% of C
1
39575
39575.36
... More
Contigency @ 3% of C
1
59363
59363.04
... More
Transportation @ 7.5% Of C
1
148407
148407.59
... More
Erection Charges for PSC pole(20% of (E4+E4*3%))
1
4284
4284.8
... More
Erection Charges of Transformer/Breaker/Joist Pole(5%
of(E5+3%*E5))
1
27734
27734.51
... More
Erection Charges for other material for line & S/S(10% of
(E5+3%E5))
1
140265
140265.36
... More
Plinth for 63 kVA Transformer
1
15340
15340
... More
Metal Spreading for 63 kVA Transformer
1
11800
11800
... More
Barbed gate Arrangement for 63 kVA Transformer
1
20225
20225
... More
Goods and Service Tax(GST)@ 18% of (E)=F
1
440237
440237.44
... More
Other Overhead supervision charges@6% of (E)=G
1
146745
146745.81
... More
GST @ 18% of (G) =H
1
26414
26414.25
... More
Labour Cess @ 1% of I=J
1
30591
30591.61
... More
Drawing Approval
1
400
400
... More
Inspection Fee For HT Line
1
300
300
... More
STAMP DUTY COST FOR EXECUTION OF POWER SUPPLY
AGREEMENT(PSA)
1
10
10
... More
6% Supervision Amount For Metering Arrangement (K)
1
475
475.73
... More
Goods and Services Tax (G.S.T) @18% of (K)
1
85
85.63
... More
20-100 A Smart WC meter
1
5810
5810
... More
3% Stock & Storage
1
174
174.3
... More
T&P (@2% of B)
1
119
119.69
... More
Contingency (@3% of B)
1
179
179.53
... More
Transportation @ 7.5% of B
1
448
448.82
... More
Erection Charges @ 10% of B
1
598
598.43
... More
Smart Meter installation charges
1
40
40
... More
Goods and sevice tax @18%
1
1427
1427.19
... More
Over Head Charges (Supervision Charges) @ 6% of C
1
475
475.73
... More
Goods and sevice tax @18%
1
85
85.63
... More
Labour Cess @ 1%
1
99
99.17
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements