Municipal Bodies Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Municipal Bodies - ORULB Tender

Eprocure
Opening Date24 Feb 2020
Closing Date2 Mar 2020
Tender Amount₹ 72,47,243 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fly Ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in foundation and plinth.

17.17

-

3969.6

... More
Reinforced Cement Concrete (1:1:5:3) using 12 mm down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge with centering and shuttering. A) Column base

20.75

-

6087.24

... More
B) Plinth bend

10.4

-

6087.24

... More
C)Lintel bend

3.9

-

9711.04

... More
D)Column and Beam

18.61

-

11555.48

... More
E)Roof slab

1.82

-

10108.2

... More
Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tyng the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties, taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge

55.48

-

5670.8

... More
Fly Ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in super structure.

105.5

-

4002.9

... More
Plain Cement Concrete of (1:1:5:3) grade using 12mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge.

29.75

-

5930.2

... More
16mm thick cement plaster (1:6) after racking out joints including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge

424.13

-

184.66

... More
12mm thick cement plaster (1:6) after racking out joints including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge

511.94

-

138.94

... More
6mm thick cement plaster (1:4) over RCC work finished smooth including close deep chipping including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge.

86.52

-

114.15

... More
2.5cm thick A.S. Flooring with C.C.(1:2:4) incl. punning using 12mm size CBHG chips including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge.

85.68

-

281.6

... More
Neat cement punning for skriting including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge

232.89

-

26.1

... More
Supplying, fitting and fixing M.S. shutter and. grill made out of M.S. Plate/M.S. square bar / M.S. flats / M.S. angles as per approved drawing and design, cutting to required size and welding properly, finished smooth by machine grinding and sand papering, including cost, conveyance, taxes of all materials, required screws, cost of all labour, T&P painting a coat of red lead primer and painting etc. as required for the work complete including the cost of making holes on brick or concrete structure subsequent mending good damages complete as per direction of the Engineer-in-charge.

3797.94

-

70

... More
Supplying Fabricated conjugate truss for placing over RCC column with Anchor Plate and bold with rafter and Purlin wind ties including cost of materials labour T & P electricity for welding chieseling for removal of welding slags , using plates hammer and wire brush grinding of joints and lathe work to shape the truss in required manner after releasing the welding stress etc complete including painting two coats over a coat of primer

9587.2

-

99.3

... More
Labour for fixing big six or trafford G.C.I. Sheet in roof incluiding fixing of ridges wind ties etc. complete but excluiding cost of fitting and G.C..sheet but incluiding drilling holes in wind tises etc complete.

541.72

-

137.7

... More
Cost of profile sheet Tata/Jindal

595.89

-

400

... More
Cost of Roof fittings

1

-

20000

... More
Supplying,laying of Vitrified(600mmx600mm) tiles on floor over 25mm thick cement mortar (1:1) to proper level including jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost,conveyance,royality of all materials including all labour & T&P charges etc complete as per the direction of the engineer-in-charge.

62.31

-

990

... More
Supplying,laying of Glazed tiles on walls over 12 mm thick cement mortar (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost,conveyance,royality of all materials including all labour & T&P charges etc complete as per the direction of the engineer-in-charge.

40.7

-

924.3

... More
Painting two coats of synthetic enamel paint of approved quality and approved shade confirming to ISI on steel work to give an even shade including sand papering and making the surface smooth in all floors at all heights including cost, conveyance,taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect over acoat of primer as per specifications and directions of Engineer-in-charge.

39.44

-

130.09

... More
Distempering two coats with approved quality and approved shade confirming to ISI over a coat of cement washing including watering, curing, cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.

277.77

-

60.96

... More
Weather coat painting two coats with approved quality and approved shade confirming to ISI over a coat of cement washing with cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.

598.47

-

69.32

... More
Supplying all materials, labour and T&P and fixing to walls,ceiling and floor PVC pipes conforming to IS.4985 0f [Sch-80],the following nominal diameter including cost of GI fittings and clamps and making good the damages to walls, ceiling & floor including testing as per specification all complete. 32 mm PVC pipe(sch -80) i)in trench

90

-

115.3

... More
in trench

40

-

115.3

... More
25 mm PVC pipe(sch -80)

20

-

87.1

... More
15 mm PVC pipe(sch -80)

20

-

45.9

... More
Supplying all materials,labour and T&P for cutting groves in pucca floor and walls for taking P.V.C. pipes and fittings and making good to the damages all complete as per specification.

20

-

156.7

... More
Supplying all materials,labour and T&P for cutting holes through existing brick work including making good to the same in cement mortar(1:4) for taking G.I. pipes and fittings /P.V.C. pipes and fittings all complete as per specification.

60

-

45.2

... More
Supplying all materials,labour and T&P for cutting holes in R.C.C. floors and roofs up to 19 cm. thick including making good and leak proof to the damages for taking G.I. pipes and fittings /P.V.C. pipes and fittings all complete as per specification.

6

-

162.8

... More
Supplying sanitary installations, pipes and fittings as per P H specification and prior approval of engineer in charge. Orissa pan 580 x 440 mm with foot rest

2

-

1960.5

... More
P or S trap

2

-

697.4

... More
Wash hand basin 550 mm x 400mm size

2

-

1470.2

... More
32 mm dia PVC waste pipe

2

-

53.8

... More
C P brass glass shelve 600x125mm

2

-

343.7

... More
C Pbrass towel rail 25mm x 450mm

2

-

810.6

... More
C P brass soap holder

2

-

222.8

... More
15 mm dia C P brass conseal stop cock

4

-

853.3

... More
15 mm dia brass Bib cock (short body)

2

-

696.3

... More
15 mm dia C P brass Bib cock (long body)

2

-

753.1

... More
15 mm dia C P brass pillar cock

2

-

498.6

... More
100 mm dia C P round grating

8

-

62

... More
12 mm dia PVC inlet connection pipe

2

-

44.4

... More
455 x 375 mm plastic moulded mirror

2

-

649.2

... More
P V C low level cistern -10 lts cap.

2

-

1172

... More
Lipped wall urinal

2

-

1027.6

... More
Squanting urinal

2

-

1472.1

... More
15 mm dia C P brass urinal spreader

6

-

252.5

... More
PVC water storage tank (sintex) 2x 1000ltr capacity

1000

-

7.5

... More
32 mm gun metal fullway valve

2

-

1543.9

... More
Supply of all materials, labour T&P and fitting, fixing of UPVC SWR soil, waste ventilating pipes and fittings of the following inside diameter of conforming to IS 15392/1992 to walls with nails, bobbings and wooden plugs including jopinting with supply of approved rubber lubricants by means of non heat application method all complete as per specification & direction of Engineer-in-Charge. 110 mm U PVC pipe

110

-

185.1

... More
110 mm UPVC tee.

4

-

257.1

... More
110 mm UPVC door bend.

6

-

135.4

... More
110 mm UPVC cowl

2

-

53.3

... More
110 mm UPVC floor trap

8

-

794

... More
Earth work excavation of foundation in stoney earth and gravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed.

57.16

-

178.6

... More
Fiilling in foundation & plinth with sand, incl. watering & ramming as per direction of Engr.-in-charge including cost of materials labour complete.

11.53

-

289.1

... More
C.C.(1:3:6) with 40mm CBHG metal including cost,carriage and royalty of materials etc complete including cost of materials labour complete.

8.04

-

3866.6

... More
Brickwork with Fly Ash Bricks (Size 25x12x8cm) having crushing strength not less than 75 kg/cm2 in CM(1:6) including cost of materials labour & T&Petc complete. A)Foundation

28.8

-

3969.6

... More
B)Super Structure

73.44

-

4002.9

... More
Cement concrete of(1:1:5:3)grade with 12 mm and down grade black hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge with C/S . A) Foundation

17.45

-

6087.24

... More
B)Column and Beam

7.45

-

11555.48

... More
C)Slab and Fins

1.13

-

10108.2

... More
Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. including cost of materials labour T&P complete .

15.61

-

5670.8

... More
12mm thick cement plaster in CM(1:6) over brick work with all cost including cost of materials labour complete.

529.11

-

138.94

... More
16mm thick cement plaster in CM(1:6) over brick work with all cost including cost of materials labour complete.

450.36

-

184.66

... More
Finishing walls with two coats weather coat paint of approved quality and approved shade confirming to ISI over a coat of cement washing including watering, curing, cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.

979.47

-

69.32

... More
Supplying fitting fixing M.S. Angle framed D/W sutter and grill including all cost with painting two coats over a coat of primer

259.2

-

70

... More
Earth work excavation of foundation in stoney earth and gravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed.

104.4

-

178.6

... More
Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete.

64.8

-

289.1

... More
Plain cement concrete (1:1:5:3) using 12 mm. size CBHG stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge.

14.4

-

5930.2

... More
Providing Press-cast M-35grade intrerlocking Paver Block of 80mm thick with appropriate colour combination with transportation to the site complete.and supplying all labour ,T&P for laying of Pre-cast M-35 grade interlocking 60mm thick Concrete Paver Blocks of standard size ,shape and colour over sand bed of reqired thickness and compaction with compactor - cum- vibrater machine to proper secreting I, e. Zero on Zero for complete laying area in 8-stage process as directed by Engg-in-charge.

600

-

784.5

... More
Provision of photographs at different stage of execution of the work.

1

-

800

... More
Labour for drilling a perfectly bore hole to specified diameter for a specified depth below G.L in alluvial soil strata by mud rotary Rig drilling as required to suit the site condition as per the direction of Engineer in charge including use of own rigs with its accesories , tools and plant and consumables etc for lowering of finished bore suitable for lowering of 200mm dia GI/PVC pipes for housing ,fitted with socket and with or without well screen as per the necessity for soft medium hard and boulder formation ( GI/PVC casing pipe if required by the contrctor to prevent collapse of over burden portion )including lowering and with drawing of casing pipe after drilling 200mm to 450mm dia in over burden portion. Drilling 200mm to 450mm dia Bore- From 00mtr to 100th Mtr

90

-

1382.7

... More
Supplying all labour and T&P for logging the bore through departmental logging team (till logging team arrives at the site the contractor is to keep the bore intact by circulating mud through mud circulating system ) and when logging team arrives at site the contractor will withdraw the boring pipes and cutter etc and keep the bore suitable for logging operation and supply of required labour to carry out logging operation as per direction of Engineer in charge.

1

-

4692

... More
Labour for lowering the following the following size of PVC casing pipe with or without slotted pipes as per the necessity from ground level up to 300mtr depth and fitted and fixed up in perfectly vertical position including cutting and threading of blank pipes and slotted pipes and supplying and fixing of all jointing materials extra sockets and T&P etc complete and keeping the top casing pipe threaded including sludgging the tube well to prevent entry of foreign materials. Lowering of 150mm dia PVC pipe- From 0 mtr to 200 Mtr

90

-

92.2

... More
Cleaning and developing the production well with their own air compressor continuously worked till clear & adequate discharge is obtained from the tube well including supply and use of necessary equpments and labour as per the direction of the Engineer in charge. For 150mm dia Production Tube well -

1

-

24869.7

... More
Supplying all labour , T & P and materials for packing the bore with washed gravel ( size p-6) around the pipes in good quality including cost of gravel etc all complete as per direction of Engineer in charge.( All through the bore around the pipe and Strainer). For 200mm dia Production Tube well - II/4x ( 0.45m2 -0.20m2) x 117.00m

7.07

-

2359.7

... More
Supplying all materials labour T & P and grouting with cement slurry for Sanitary Sealing around the GI/PVC casing pipe up to 3.00mtrs below ground level including cost of cement all complete as per the direction of Engineer in charge. For 150mm dia Production Tube well

1

-

2465.3

... More
150mm dia Sch-80 PVC casing pipe -

90

-

845.8

... More
150mm dia PVC bell Plug.

1

-

850

... More
150mm dia PVC Well Cover.

1

-

350

... More
150mm dia PVC short Piece (1.00mtr)

1

-

550

... More
KSB make Submersible Pump set -1.5 HP single Phase , to give Discharge Range 2800 lit/hr - 1100 lit/hr at Head Range: 55 mtr - 136mtr, Model : CORA 2C/25 XUMA LX (S) 100

1.5

-

7143

... More
Bhartia Culter Hammer (BCH) make DOL Control Panel 1.5HP, Single phase, having contactor, over load relay, ammeter Indicating lamp & Auto on starting arrangement with powder coated box with locking arrangement suitable for above pumpset

1.5

-

2000

... More
Magnum make 40 mm OD, PN6/PE80 HDPE pipe

105

-

55

... More
KSB/BCH make 2.5 sq.mm, 3 Core submersible flat cable

105

-

75

... More
6mm thickness PVC coated SS rope

105

-

22

... More
1 1/4" S.S. Nipple with nut bolt

2

-

320

... More
8" Borewell cover & 1 1/4" Clamp

1

-

520

... More
U Clamp for PVC coated SS rope

4

-

20

... More
1 1/4" G.I. Bende with socket

1

-

180

... More
Erection, Testing, Commissioning of the above pumpset and To & Fro of Mechanic Charge

1

-

2500

... More
Earth Work in excavation of foundation in stoney earth and gravel mixed soil for foundation, depth upto 1.5 m including cost of all T&P, labour etc.as per direction of engineer -in- charge .

4.17

-

178.6

... More
Back Filling of foundation and plinth with excavated materials (in all kinds of soil) including cost of all labour, T&P etc. complete in all respect as per direction of engineer -in- charge .

4.07

-

95.33

... More
Back Filling of foundation and plinth with sand including cost of all labour, T&P etc. complete in all respect as per direction of engineer -in- charge .

0.6

-

289.1

... More
Supplying, laying & compacting cement concrete (1:3:6) with 40 mm & down graded hard black granite aggregates including required T&P curing, labour etc. complete in all respect and as per the direction of the Engineer in in charge. (Cement Lafarge, ultratech, ACC equivalent)

0.5

-

3866.6

... More
Supplying, laying & compacting cement concrete (1:1:5:3)with 12mm & down graded hard black granite aggregates including required T&P curing, labour etc. complete in all respect and as per the direction of the Engineer in in charge.

1.43

-

4942.5

... More
Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. including cost of materials labour T&P complete .

0.03

-

5670.88

... More
Supplying & providing Fly ash brick work with one or more brick thick with cement mortar 1:6, including all T&P, labour, curing etc. complete in all respect as per direction of engineer -in- charge .

5.15

-

3969.6

... More
Supplying & providing 12mm thick plaster with cement mortar 1:6 including all T&P, labour, curing etc. all complete.

14.74

-

138.94

... More
25 mm thick A.S. flooring including punning with c.c (1:2:4) using 12 mm down aggregates including cost of all materials,T&P, labour etc. complete in all respect and as per the direction of the Engineer in in charge. (Cement Lafarge, ultratech, ACC equivalent)

10.92

-

281.6

... More
Supplying, Fabricating & erecting of structural steel sections such as channel, angles, plates, flats etc. for over head water tank structure as per drawing, complete in all respect including cost of all materials and labour and as per the direction of the Engineer in in charge.

1082.79

-

70

... More
Providing , fixing & removing shuttering in position at all heights below & above finished ground level with necessary centerings, bracings, propping's etc, including all as per drawings, specifications and directions of the Engineer.

8.64

-

605.3

... More
supplying , laying, fixing with clamps to walls, ceiling & floor U-PVC pipes and bends confirming 15mm nominal dia Schedule 80 including testing and plugging at open end, as per direction of engineer.(Make - Oriplast/ Hariplast)

5

-

45.9

... More
supplying , laying, fixing with clamps to walls, ceiling & floor U-PVC pipes and bends confirming 25mm nominal dia Schedule 40 including testing and plugging at open end, as per direction of engineer.(Make - Oriplast/ Hariplast)

140

-

87.1

... More
supplying , laying, fixing with clamps to walls, ceiling & floor U-PVC pipes and bends confirming 32mm nominal dia Schedule 40 including testing and plugging at open end, as per direction of engineer.(Make - Oriplast/ Hariplast)

30

-

115.3

... More
Supplying and fixing 15mm dia brass screw down CI Bib cock including cost of all materials, labour etc.

2

-

696.3

... More
Supplying and fixing 25mm dia Brass full way gate valve, including cost of all materials, labour etc.

2

-

1054.9

... More
Supplying, hoisting. fitting and fixing in position at all heights above plinth level approved make 2000 litre high density PVC cylindrical water Storage tanks of following sizes and capacities at all heights above finished ground level with 400mm dia hinged manhole cover of the same material with lifting arrangement, providing necessary holes for pipe connections etc. complete (Make Sintex)

1

-

759.8

... More
Earth work in hard soil or gravelly soil excavation of foundation in stoney earth and gravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed.

31.37

-

178.6

... More
Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete.

3.07

-

289.1

... More
Plain cement concrete (1:3:6) using 40 mm. size hard crusher broken granite stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge.

1.27

-

3866.6

... More
Reinforced cement concrete(1:1.5:3)including watering & curing etc

1.15

-

5930.2

... More
Reinforced cement concrete(1:1.5:3)including watering & curing etc

1.04

-

10108.2

... More
Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tyng the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties, taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge

1.04

-

5670

... More
Fly ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge.

8.06

-

3969.6

... More
Providing for A.S. flooring with cement punning and smooth finishing including watering and curing cost, conveyance, royalties & taxes of all & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge.

8

-

281.6

... More
12mm thick cement plaster (1:4) with cement punning for skirting finished smooth including watering & curing etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge.

29.52

-

138.94

... More
Supplying 1.20 mtr dia 0.30 mtr height precast RCC well ring and lowering and placing the same in position in soak pit to proper level and vertically checked with plum bob including cost,conveyance,royality of all materials including all labour & T&P charges etc complete as per the direction of the engineer-in-charge.

7

-

800

... More
Recessed wiring to light point/ Fan point/ Exhaust fan point/ Call bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20 mm dia non-metallic PVC flexible conduit with 5 Amp., 250V piano type switch ISI marked and celling rose ISI marked mounted on MS box having front bakelite cover of suitable size, MS box with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection (Make of wire-Finolex/L&T/ Anchor/ Havells/ G-Guard/ HPL). Group-A L.P- F.P. C.B.P.

10

-

404

... More
Group-B L.P- F.P. C.B.P.

25

-

616

... More
Group-C L.P- F.P. C.B.P.

22

-

880

... More
Supply and fixing of 5 Amp. Plug with switch on existing board (piano type/ cover including connection etc. as required)

8

-

82

... More
SF of 3 pin 15 Amp. Plug point on M.S. Board

10

-

265

... More
2 x 1.5 sq.mm + 1 x 1.5 sq.mm in 20 mm dia

210

-

120

... More
2 x 2.5 sq.mm + 1 x 1.5 sq.mm in 20 mm dia

250

-

134

... More
2 x 4 sq.mm + 1 x 1.5 sq.mm in 20 mm dia

50

-

151

... More
2 x 6 sq.mm + 1 x 1.5 sq.mm in 20 mm dia

25

-

260

... More
S/F of Bakelite angle holder/ batten holder of ISI marked including connection etc. as required

9

-

55

... More
S/F of 20 watt. LED tube light (havels/ crompton)

31

-

783

... More
S/F of 10 watt bulb (havels/ crompton)

9

-

156

... More
S/F of 48 watt LED street light (havels/ crompton)

6

-

6321

... More
S/F of AC ceilling fan of size 48" (Usha/ Havells/ CG)

10

-

1914

... More
S/F of 3' legnth sown and celling fan

10

-

70

... More
Installation, testing & commissioning of ceiling fan

10

-

113

... More
S/F of electronic step type fan regulator (havells/ cona/ anchor)

10

-

233

... More
S/F of 8 way double door MCB DB with 8 nos. of 6/10 Amp. SP MCB (Havells/L&T/ HPL)

2

-

1608

... More
S/F of 4 way double door MCB DB with 8 nos. of 6/10 Amp. SP MCB (Havells/L&T/ HPL)

2

-

1881

... More
S/F of 5 Amp. SP MCB (havells/ Anchor/ HPL)

8

-

127

... More
S/F of 32 Amp. TPN SFU in sheet steel enclosure (havells/ L&T)

1

-

851

... More
S/F of 63 Amp. TPN SFU in sheet steel enclosure (havells/ L&T)

2

-

3525

... More
S/F of 100 Amp. TPN SFU in sheet steel enclosure (havells/ L&T)

2

-

5685

... More
S/F of 100 Amp. 6 way TPN copper bus-bar with bus bar chamber (havells/L&T)

2

-

8602

... More
S/F of exhaust fan of size 12" (usha/ havells/ CG)

2

-

2718

... More
Installation, testing & commissioning of exhaust fan upto 450mm sweep in the existing opening, including making the hole to suit the size of above fan, making good the damage complete connection etc. as required

2

-

558

... More
S/F of 35 sq. mm 4 core Aluminium armoured cable (Havells/ Polycab)

50

-

144

... More
Laying of 10 sq,mm PVC insulated PVC sheathed/ XLPE power cable (havells/ polycab)

50

-

94

... More
S/F of standard earthing with G.I. pipe 3mtr. Long 40mm dia ISI marked including accessories and providing masonary enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal and salt as required.

3

-

2381

... More
Earth work excavation of foundation in stony earth and gravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed as per Direction of Dept.

71.78

-

178.6

... More
Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete.

105.83

-

289.1

... More
Plain cement concrete (1:3:6) using 40 mm. size CBHG stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge.

21.54

-

3866.6

... More
Fly Ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in foundation and plinth.

8.79

-

3969.6

... More
Reinforced Cement Concrete of (1:3/2:3)M-12 to 20 grade using 20 mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge with centering and shuttering. A) Column base

12.21

-

6087.24

... More
B) Plinth bend

3.85

-

6087.24

... More
C)Column and Beam

9.45

-

11555

... More
Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tyng the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties, taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge

25.51

-

5670.8

... More
Fly Ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in super structure.

14.07

-

4002.9

... More
Plain Cement Concrete of (1:1:5:3) using using 12mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge.

13.1

-

5930.2

... More
16mm thick cement plaster (1:6) after racking out joints including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge

78.66

-

184.66

... More
12mm thick cement plaster (1:6) after racking out joints including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge

78.28

-

138.94

... More
6mm thick cement plaster (1:4) over RCC work finished smooth including close deep chipping including watering & curring etc complete with cost, conveyance royalties & taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge.

119.7

-

114.15

... More
Supplying Fabricated conjugate truss for placing over RCC column with Anchor Plate and bold with rafter and Purlin wind ties including cost of materials labour T & P electricity for welding chieseling for removal of welding slags , using plates hammer and wire brush grinding of joints and lathe work to shape the truss in required manner after releasing the welding stress etc complete including painting two coats over a coat of primer

3127.45

-

99.3

... More
Labour for fixing big six or trafford G.C.I. Sheet in roof incluiding fixing of ridges wind ties etc. complete but excluiding cost of fitting and G.C..sheet but incluiding drilling holes in wind tises etc complete.

188.65

-

153.2

... More
Cost of Profile sheet Tata/ Jindal

207.52

-

400

... More
Cost of Roof fittings

1

-

10000

... More
Distempering two coats with approved quality and approved shade confirming to ISI over a coat of cement washing including watering, curing, cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.

198.36

-

60.96

... More
Weather coat painting two coats with approved quality and approved shade confirming to ISI over a coat of primer with cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect as per specifications and directions of Engineer-in-charge to inner and outer face of walls, ceiling, projections.

78.28

-

69.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.