Municipal Bodies Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Municipal Bodies Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date21 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 25,95,276 
Notes
Download

Costs

Summary

Power Supply To 222kva And Installation Of 315kva 11/0 Kv Plinth Mounted Sub-station For Proposed New Office Building And Smart Park Near Medical College, Ankula

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Disc insulator (T&C)45 KN polymer

6

1014

6088.8

... More
HT Stay Set(Complete)

4

1239

4956

... More
HT Stay Insulator

4

59

236

... More
HT stay clamp(1.95kg/ pair)

4

147

590

... More
7/10 SWG Stay wire 10kg/stay

40

88

3540

... More
100mm2 All Alloy Aluminum Conductor AAAC

0.57

64900

37187.7

... More
100 x 50 x 6 mm G I Channel (each 2.8 Mtr. Long (9.2kg/mtr.) * 2 no.

103.04

88

9119.04

... More
75 x 40 x 6 mm G I Channel (each 2.8 Mtr. Long 6.8kg/mtr.) with side angle

76.16

88

6740.16

... More
50 x 50 x 6 mm G I Angle (each 2.8 Mtr. Long 4.5kg/mtr.) with side angle

50.4

88

4460.4

... More
PG clamp for 100 mm2 AAA conductor

6

684

4106.4

... More
GI Nuts & Bolts of Assorted Size

15

92

1380.6

... More
Earthing support (coil type)

4

195

783.52

... More
Danger plate

4

94

377.6

... More
Anti Climbing Device made of GI barbed wire, Clamping arrangement etc.(2kg Per Support)

8

94

755.2

... More
Sundries

1

3540

3540

... More
Total Material Cost (2019 - 20) @ 6% escalation

1

13297

13297.85

... More
Total Material Cost (2020 - 21) @ 6% escalation

1

14095

14095.72

... More
Total Material Cost (2021 - 22) @ 6% escalation

1

14941

14941.46

... More
Total Material Cost (2022 - 23) @ 6% escalation

1

15837

15837.96

... More
Total Material Cost (2023 - 24) @ 6% escalation

1

16788

16788.22

... More
Stock, Storage & insurance @ 3% of A6 (B)

1

8897

8897.76

... More
T & P charges @ 2% of Sub-total

1

6109

6109.8

... More
Contingency @ 3%

1

9164

9164.69

... More
Transportation @ 7.5%

1

22911

22911.73

... More
G1= 5% of(1.03 of (1.06*1.06*1.06*1.06*1.06) of (sl1)) Erection Charges @5% for RS joist Pole

1

9285

9285.57

... More
G3= 10% of (C-(1.03 of((1.06*1.06*1.06*1.06*1.06)of(sl1)))Erection Charges @10% for Other Material

1

11977

11977.84

... More
Civil worksMaterial cost for Concreting of 11 Mtr RS Joist Pole 2.46mtrx0.40mtrx0.40mtr =0.34 cum (PCC 1:3:6) @6500

4

2613

10455.76

... More
Material cost for Concreting of Stay (1.65mtrx0.30mtrx0.3mtr=0.150 cum - PCC 1:3:6)@6500

4

1138

4554.8

... More
Overhead charges 6%

1

22797

22797

... More
SUB=-STATION PART Rate 2018-19 - 150x150 RS Joist b(11Mtr Long)(34.6kg per Mtr)(SAIL/JINDAL/TATA make)

2

33683

67366.2

... More
11kv Pin Insulator (Polymer)

3

236

708

... More
H W fitting(T&C)45KN

3

153

460.2

... More
Disc insulator (T&C)45 KN polymer

3

1014

3044.4

... More
100 x 50 x 6 mm G I Channel (each 2.8 Mtr. Long (9.2kg/mtr.) * 2 no.

103.04

88

9119.04

... More
75 x 40 x 6 mm G I Channel (each 2.8 Mtr. Long 6.8kg/mtr.) with side angle

76.16

88

6740.16

... More
50 x 50 x 6 mm G I Angle (each 2.8 Mtr. Long 4.5kg/mtr.) with side angle

50.4

88

4460.4

... More
HT Stay Set(Complete)

2

1239

2478

... More
HT Stay Insulator

2

59

118

... More
HT stay clamp

2

147

295

... More
7/10 SWG Stay wire

20

88

1770

... More
315KVA,11/0.4KV(AL)Transformer BIS Energy level-II

1

524993

524993.8

... More
LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 315KVA S/S

1

83912

83912.16

... More
AB Switch (11KV,400A.3pole,50Hz)

1

13983

13983

... More
H.G.Fuse(11KV.400A.3Pole)with PI

1

13605

13605.4

... More
11KV LA 12KV-10KA

3

4189

12567

... More
GI Pipe Earthing 40 Dia Medium gage 3 mtrs. Long

5

1239

6195

... More
25x6mm GI Flat for earthing

15

88

1327.5

... More
50x6mm GI Flat for neutral earthing

15

88

1327.5

... More
No-6/8 G I wire (Dia 4.6mm)

30

88

2655

... More
GI Nut,Bolt & Washer of Different Sizes

25

92

2301

... More
3.5 Cx 185 mm2 LT PVC Cable(un armoured)

20

749

14986

... More
All Cable Sockets

32

61

1963.52

... More
Danger plate

2

94

188.8

... More
Anti Climbing Device made of GI barbed wire, Clamping arrangement etc.(2kg Per Support)

4

94

377.6

... More
Earthing Materials

5

2230

11151

... More
Sundries for survey, PVC tape, Ampire Tape, Danger Board, small size nut & bolt preparation of drawing cable socket etc.

1

2360

2360

... More
Total Material Cost (2019 - 20) @ 6% escalation

1

47427

47427.22

... More
Total Material Cost (2020 - 21) @ 6% escalation

1

50272

50272.85

... More
Total Material Cost (2021 - 22) @ 6% escalation

1

53289

53289.23

... More
Total Material Cost (2022 - 23) @ 6% escalation

1

56486

56486.58

... More
Total Material Cost (2023 - 24) @ 6% escalation

1

59875

59875.77

... More
Stock storage and insutance @ 3%

1

31734

31734.16

... More
Contingency @ 3%

1

32686

32686.18

... More
T & P charges @ 2%

1

21790

21790.79

... More
Transportation @ 7.5%

1

81715

81715.46

... More
G1= 5% of(1.03 of (1.06*1.06*1.06*1.06*1.06) of (sl1+sl2)) Erection Charges @5% for DTR AND joist Pole

1

40824

40824.63

... More
G2= 10% of (C-1.03 of (1.06*1.06*1.06*1.06*1.06) of (sl1+SL2)) Erection Charges @10% for other material

1

27304

27304.69

... More
Civil worksMaterial cost for Concreting of 11 Mtr RS Joist Pole 2.13mtrx0.40mtrx0.40mtr =0.34 cum (PCC 1:3:6) @6500

2

2613

5227.4

... More
Material cost for Concreting of Stay (1.65mtrx0.3mtrx0.3mtr=0.150 cum - PCC 1:3:6)@6500

2

1138

2277.4

... More
Barbed fenching with grill gate metal and sand

1

41300

41300

... More
Plinth of distribution transformer(315 KVA)

1

41300

41300

... More
Overhead charges 6%

1

83037

83037.96

... More
Service Connection Part Rate 2018-19 3cx 70mm2 11KV XLPE Cable(Amroured)

160

568

91001.6

... More
Heat Shirnkable Jointing kit for 3cx 70mm2 11KV XLPE Cable(indoor type)

4

8385

33540.32

... More
Heat Shirnkable Jointing kit for 3cx 70mm2 11KV XLPE Cable(Outdoor type)

4

12919

51679.28

... More
HDPE Pipe , 8",10mtr (spec PE80-PN8,200 MM Dia)

32

2106

67401.6

... More
Cable laying in the cable Trench with removal cover

64

983

62970.24

... More
10 core 2.5sqmm Cu Control Cable(Armoured)

12

389

4672.8

... More
16mm MS Bolt& Nut with washer

20

92

1840.8

... More
Allcable lug of different size

30

61

1840.8

... More
40mm nominal bore GI Pipe (Medium gage) Earthing Device (3mtr Long)

4

1239

4956

... More
Earthing Materials

4

2232

8931

... More
25x6 GI Flat for earthing

60

88

5310

... More
Lighting Arrester(12KV,10KA)Station class

3

4189

12567

... More
Sundries

1

2360

2360

... More
Total Material Cost (2019 - 20) @ 6% escalation

1

20944

20944.28

... More
Total Material Cost (2020 - 21) @ 6% escalation

1

22200

22200.94

... More
Total Material Cost (2021 - 22) @ 6% escalation

1

23533

23533

... More
Total Material Cost (2022 - 23) @ 6% escalation

1

24944

24944.98

... More
Total Material Cost (2023 - 24) @ 6% escalation

1

26441

26441.78

... More
Stock storage and insutance @ 3%

1

14014

14014.08

... More
T & P charges @ 2%

1

9623

9623.01

... More
Contingency @ 3%

1

14434

14434.51

... More
Transportation @ 7.5%

1

36086

36086.29

... More
Erection charges @10%

1

48115

48115.05

... More
Civil works cost of cubicle room (12'* 12'* 10')

1

70800

70800

... More
Overhead charges 6%

1

39612

39612.56

... More
Labour cess

1

25695

25695.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.